Loading…
Loading…
1,667 results • Best match
PROVN OF FENCING/ GRATING TO DOWNSTREAM OF CULVERT AREA AT SOLAR POWER PLANT UNDER GE (MCTE) MHOW
PROVN OF SOLAR POWER PLANT FOR BLDG NO. PB-55 (CHANAKYA) OF NCO ACADEMY AT DHANA MIL STN.
REPAIR MAINT OF STRING AND ITS CONNECTED ACCESSORIES WORK AT 05 MW SOLAR POWER PLANT UNDER GE MCTE MHOW
Design, supply, installation, testing, commissioning and integration of a 50 kWp grid-tied solar power plant at RRCAT, Indore.
PROVN OF ONE ADDITIONAL 1 MW INVERTER ALONGWITH CONSTRUCTION OF AIR CONDITIONED HOUSING ROOM FOR SOLAR POWER PLANT AT MHOW
SITC of new solar inverter for existing 15 kwp solar power plant i/c all connections etc. as reqd at KV Datia Subwork/Packages: work
Module Mounitng Structure for BHEL Bhopal 5MW Solar PV project
Custom Bid for Services - SITC OF SOILING STATION AT NTPC REL SHAJAPUR SOLAR POWER PLANT Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
PROVISION OF SOLAR POWER PLANT IN BLDG NO P-308 155MM BOFORS REPAIR BAY AT 506 ABW JABALPUR UNDER GE (WEST) JABALPUR
Custom Bid for Services - Maintenance and housekeeping of 5MW Solar power plant at SectorA Govindpura area in Township premises of BHEL Bhopal
REPAIR REPLACEMENT OF CABLES OF INVERTORS AND SMBs AND OTHER ALLIED WORKS AT 05 MW SOLAR POWER PLANT UNDER GE MCTE MHOW
SUPPLYING, INSTALLATION, TESTING AND COMMISSIONING OF ON GRID SOLAR POWER PLANT AT 100 SEATED MINORITY GIRLS HOSTEL AT BRAUSS CAMPUS MHOW INDORE. (M.P.)
Supply, installation, testing and commissioning of 40KW On Grid Solar Power Plant with Net Metering System for TTWS, Tulsi Tower, Tulsi Nagar, Bhopal.
Custom Bid for Services - Maintenance and Housekeeping of 5 MW Solar Plant at BHEL Bhopal Similar Category AMC/CAMC of Solar Energy Power Plants
DESIGN, SUPPLY, INSTALLATION and COMMISSIONING TOTAL 15 KW ROOF TOP PV SOLAR POWER PLANT AT CANTONMENT BOARD OFFICE CAMPUS 25KW, and CANTONMENT GENERAL HOSPITAL 15KW
Unbranded ceiling mounted SPV Module:200 Wp, Battery:24V,75Ah, Unbranded ceiling mounted SPV Module:200 Wp, Battery:24V,75Ah Solar Lamps (Solar Based Home Systems - Solar Power Packs - Ac Models
LUMINOUS ceiling mounted Solar charge controller: 12V, 20A,, SPV, LUMINOUS ceiling mounted Solar charge controller: 12V, 20A,, SPV Module:300 Wp, Battery:24V, 120 Ah Solar Lamps (Solar Based Home Systems - Solar Power Packs - Ac Models
Estimate for Power Evacuation from 10 MW Solar Power Plant of GAIL Through 33 Kv. Single Circuit line up to Hydrogen Plant at GAIL Under Raghogarh Division
SPL REPAIR TO DRAINAGE SYSTEM WITH COVER SLAB AT HEMA LINE, THIMMAYA LINE ETC AND PROVN OF BOUNDARY WALL AT SOLAR POWER PLANT UNDER GE (MCTE) MHOW
Custom Bid for Services - Maintenance and housekeeping of solar power plants installed in factory premises of BHEL Bhopal Similar Category AMC/CAMC of Solar Energy Power Plants
SOLAR POWER PACK wall mounted Solar Lamps (Solar Based Home, SOLAR POWER PACK wall mounted Solar Lamps (Solar Based Home Systems - Solar Power Packs - D. C. Models
REPAIR TO DOOR, WINDOWS, PLASTERING PLUMBING, FLOORING AND OTHER MISC WORK AT CHILDREN SCHOOL, SOLAR POWER PLANT, MES INSTALLATION ETC OF AGE B/R-V UNDER GE (MCTE) MHOW
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6369941 Dated : 21-06-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing and Erection of 12 Kw On-Grid Solar Power Plant Including Other Required Accessories at Roof Top Office of The Project Director Bina Pmu Wrd Sagar Distt. Sagar (M.P)
Solar System
Solar System
Unbranded Solar power pack with Solar panel, Warranty 1, Unbranded Solar power pack with Solar panel, Warranty 1 year
Solar System for Buildings
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
Solar power pack with Solar panel (Q3)
hybrid solar system
Solar System installation
E TENDER FOR DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISIONING OF 40 KWp 1into20 KWp Plus 1into20KWp ON GRID INTERACTIVE ROOF TOP SOLAR POWER PLANT AT TWO LOCATION BRANCH OFFICES HARDA AND B.O. SEHORE UNDER DIVISIONAL OFFICE BHOPAL UNDER CENTRAL ZONAL OFFICE BHOPALMADHYA PRADESH
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6435495 Dated : 09-07-2025 Bid Document 1/9 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 5000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO NAGAR PALIKA PARISHAD KARELI NAGAR PALIKA KARELI, Urban Development and Environment Department, e-Nagar Palika Government of Madhya Pradesh, (Cmo) Splitting
Design, Supply, Installation, Transportation,Testing and Commissioning of equipments for 15 kwp rooftop solar power plant (on grid) complete item at Mugalia chaap Block Phanda, Nazirabad, Gunga, Lalariya and Dhamarra Block Berasiya Bhopal
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7010361 Dated : 17-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : store keeper Cantonment Board Pachmarhi, Department of Defence, DG of Defence Estate, Ministry of Defence (Vijay Harvanshi)
Selection of Contractor for Development including Renovation (Civil, Electrical, Plumbing) and Furniture Supply of the Existing Quarters at Jalud, Khargone District as Project Office and Guest House for 60 Mw Solar Power Plant Project
Planning, Designing, and Installation of a grid connected 5 MW (AC) / 6.75 MW (DC) ground mounted Solar Power Plant ...... and 10 (Ten) years Operation and Maintenance of Vivek Nagar Mines at Sohagpur Area, SECL.
Construction of Solar PV Component Testing Facility at Mohasa Babai, Narmadapuram, M.P.
Supply, installation, testing and commissioning of Solar PV system at SIHM Jabalpur.
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6855857 Dated : 04-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 25 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO NAGAR PARISHAD MANPUR DISTT UMARIA, Urban Development and Environment Department, e-Nagar Palika Government of Madhya Pradesh, (Cmo) 2/6
Solar system Off Grid
Supply of Solar System
Purchase of Solar System
OFF GRID SOLAR SYSTEM