Loading…
Loading…
212 results • Best match
Supply, installation and commissioning of Solar Outdoor lighting systems with Civil work and Boundar
Procurement and installation
AC SPD P N 952307 DEHN, AC SPD P N 952035 DEHN, SURGE SUPRESSOR DEVICE DC SPD P N 952 515 DEHN, CARD HRD 465 REV B SMPS WITH NTC FOR SOLAR PCS HHPE, CARD SOLAR HRD 468 REV B POWER INTERFACE CARD FOR SOLAR PCS, CARD HRD 471 REV A INPUT OUTPUT CARD FOR ... FOR SOLAR PCS ... CARD SOLAR HRD ... FOR SOLAR PCS ... CARD SOLAR HRD ... FOR SOLAR PCS ... FOR SOLAR PCS ... CARD SOLAR HRD ... FOR SOLAR PCS ... CARD SOLAR HRD ... FOR SOLAR PCS ... CARD SOLAR HRD ... FOR SOLAR PCS ...
Repairing of Avenue Road, Periphery Road including Solar and Colony Roads at TGBPP NEEPCO Ltd Monarchak Sonamura Sepahijala Tripura
Pest and Rodent Control Management at STG Building of 101MW TGBPS Control Room Inverter Rooms of Solar 5 MWp Guest House and Erectors Hostel at TGBPS NEEPCO Ltd Sonamura Monarchak Tripura
On Grid Solar Inverter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6887195 Dated : 13-11-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Site development works, approach road, Construction of Weir, UFF cum SSF (2000 LPH), Clear Water Reservoir (10000 Gallon) with pump house Chlorination system, pumping arrangement(Solar), Boundary Fencing, providing and laying of Rising ...
Supply, Installation and Commissioning of 3000 LPD Flat Plate Collector (FPC) based Solar Water Heating System at selected Tourist Lodges of TTDC Ltd., Tripura including Performance Warranty/Guarantee Contract for 2(two) yearsas per DNIeT
Const. of 03nos. RCC Ring Wells with solar pumping arrangement and distribution pipeline with syntex tanks at Vandarima, Pushparampara of Paschim Bandarima VC of Dasda RD Block area under DWS Sub-Division, Dasda./Gr.I (2nd Call)
Const. of 03 nos. RCC Ring Wells with solar pumping arrangement and distribution pipeline with syntex tanks at Vandarima, Pushparampara of Paschim Bandarima VC of Dasda RD Block area under DWS Sub-Division, Dasda./ Gr.-II (2nd Call)
CONSTRUCTION CUM SUPPLY AND INSTALLATION