Loading…
Loading…
1,282 results • Best match
Custom Bid for Services - Maintenance activity at 5MWp solar power plant Unit-1 of HEEP BHEL Haridwar Plant Similar Category Operation And Maintenance Of Other Machines And Plants
cement, Steel, Sand, Aggregate, Iron Window Four by four feet with installation, Iron Door and gate six point five by three point five with installation, False sealing with installation, tiles with installation, Labour charge, Roof sheet with ... Camera, Solar power plant for ...
Installation of thirty KVA solar power plant, Prefab Shelter of PUF panel, Construction Materials as per Tech Sanction, Chain link fencing, Misc stores for chain link fencing
SOLAR PLANT INSTALLATION
Supply,installation, testing and commissioning of 15kWp off grid Solar Power Plant at SSB BOP Bagrihat, Jhulaghat, Haldughat, Rautgarh, Jamtari of 55th Bn Pithoragarh and Khaldunga-I , Khaldunga-II, Seem, Khet, Amra and Beuri of 5th Bn Champawat
Design Survey Supply Installation Commissioning and Testing of Solar Power Plant 02 /04/ 05 KWp at Different Location Distt Uttarkashi including warrantee and 05 Year Annual maintenance in Distt Uttarkashi
Solar System
Wind Solar PV Hybrid System - Off grid (Q2) (3 (3 ))
12 Watt White LED Based Solar PV Street Lighting System
PROVN OF ROOFTOP SOLAR PLANT TOTALLING 500 KW AT CERTAIN BLDGS AND COMPREHENSIVE MAINTENANCE OF ROOFTOP SOLAR POWER PLANTS AT DEHRADUN UNDER PMSG MBY UNDER GE DEHRADUN
Annual Maintenance Contract of Grid Connected (5x100)500.Kwp Roof Top Solar Photovoltaic (Spv)Power Plant At THDCIL Complex- Rishikesh
Design, Manufacture, Supply, Erection, Testing and Commissioning of Off-Grid Solar Power Plant at CHC Jakholi(4 kWp) and PHC Phata (3 kWp) in District Rudraprayag including Five Years Warrantee and Maintenance.
Solar power pack with Solar panel (Q3)
Empanelment of the EPC Contractors for design, manufacture, supply, erection, testing, net metering and commissioning including warrantee, AMC for 5 years of capacity 1 KWp to 1500 KWp Grid connected Rooftop and small Solar Power Plant
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7024931 Dated : 19-12-2025 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2200000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Chief Executive Officer Ranikhet Cantonment Board Ranikhet, Department of Defence, DG of Defence Estate, Ministry of Defence (Chief Executive Officer)
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6976822 Dated : 08-12-2025 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Chief Executive Officer Ranikhet Cantonment Board Ranikhet, Department of Defence, DG of Defence Estate, Ministry of Defence (Chief Executive Officer)
Supplying, installation, testing & commissioning of Solar Power Generation system at department of Telecommunications Wireless Monitoring Organization in Markham grant, Doiwala, Dehradun (U.K.) Subwork/Packages: SITC of solar power plant
Design manufacture supply erection testing net metering and commissioning including warrantee and AMC for 5 years of cumulative capacity 31 KWp Grid connected Rooftop Solar Power Plant at various Hospitals in the District Rudraprayag
Construction of 33 Switching Ss at village Dhari 33 KV Reetakhal Road Satpuli for 1.08 MWP Solar Ureda Scheme Construction 33 KV line at vill Dhari Rethakhal Road Satpuli for grid connectivity of solar power plant under EDD Pauri Garhwal
FD SOLAR POWER SYSTEM 30KVA CAPACITY
Setting-up of 4.0 MW Ground Mounted Grid Connected Solar PV Plants near Bhatwari District- Uttarkashi, Uttarakhand
Design manufacture supply erection testing net metering and commissioning including warrantee and AMC for 5 years of capacity 10 KWp Grid connected Rooftop Solar Power Plant Uttarakhand Right to Service Commission Head Quarter Campus Dehradun
Installation Grid Interactive system in pre installed Offgrid solar powerplant
Design Supply Erection and Commissioning of On Grid Solar PV Power Plants by converting pre existing Off Grid Solar PV Power Plants at Various Block office in Tehri Garhwal Including five years Annual Maintenance
SITC of 500MT 05nos.x100MT for Fruit and Vegetables and 100MT 01no.x100MT for Frozen Produce Cold Storage 100kwp roof top ongrid Solar power plant 82.50 Kva DG Set 160 KVA Stabilizer 160KVA Transformer etc at Khatima mandi
Setting-up of 7.75 MW Ground Mounted Grid Connected Solar PV Plants at Aungi near Maneri, District Uttarkashi, Uttarakhand.
Setting-up of 4.0 MW Ground Mounted Grid Connected Solar PV Plants near Dharasu HEP Chinyalisaur District- Uttarkashi, Uttarakhand.
Design, Supply, Installation, Commissioning and Maintanence, Grid Connected Ground Mounted Solar Power Plant Service
MC4 Connector for Solar System
Solar Lamps (Solar Based Home Systems - Solar Power Packs - DC Models) (Q3)
Fd Elect (Solar Power Sys 30 KVA)
Implementation of Grid Connected Solar PV Roof Top Systems on Turnkey Basis at various Buildings at THDCIL office complex, Rishikesh, Uttarakhand.
Setting-up of 1.5 MW Ground Mounted Grid Connected Solar PV Plants at Gaddha Colony, Hathiyari near Vyasi HEP District- Dehradun, Uttarakhand.
Setting up of 9.5 MW Canal Bank Grid Connected Solar PV Plants On Yamuna Power Channel Near Dhakrani HEP Dhakrani- Dehradun Uttarakhand
Supplying, installation, testing and commissioning of 15 kWP off grid Solar Power Plant each at SSB Border Out Posts (BOP) Kalapani, Gunji, Chiyalekh, Malpa (Najang),Garbiyang, Lamari of 11th Bn Didihat with 3mx3m control room under Ranikhet Frontier
70 kWp Hybrid Solar System (Q3)
Provision of Fd Electrification 30KVA (Solar Power system)
Procurement of 15 KW Off Grid Solar Plant
Repairing, testing and Commissioning of 1.5 KWp off Grid Solar PV System at Devprayag SO.
SITC OF 03 KWp grid conneted Roof top solar PV system at PO Building Rikhnikhal
Repairing, testing and Commissioning of 1.5 KWp off Grid Solar PV System at Rudraprayag MDG.
SITC OF 3.5 KWp grid conneted Roof top solar PV system at PO Building Chamoli
DESIGN MANUFACTURE SUPPLY ERECTION TESTING COMMISSIONING OF AN INSTALLED 70 KW SOLAR PV PLANT INTO GRID SYNCHORNIZATION WITH GRID POWER AT COLLECTORATE CAMPUS Haridwar INCLUDING WARRANTEE and MAINTENANCE WITH 05 YEARS.
(ii) Setting up of 2.5 MW Canal Bank Grid Connected Solar PV Plants On Yamuna Power Channel Near Bridge No-1 Dakpathar District Dehradun Uttarakhand
Unbranded Off - Grid Solar Photovoltaic (PV) Power Plant,, Unbranded Off - Grid Solar Photovoltaic (PV) Power Plant, Capacity - 10 KVA
Unbranded Off - Grid Solar Photovoltaic (PV) Power Plant,, Unbranded Off - Grid Solar Photovoltaic (PV) Power Plant, Capacity - 3.5 KVA