Loading…
Loading…
1,287 results • Best match
Project Board in Galvanised Sheet with Painting (Q3), LED Solar Street Light with Installation & Commissioning (Q3)
Survey, Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising Main (GI Pipe), HDPE Water Storage Tank, Distribution system (HDPE Pipe), FHTC and all other appurtenant works etc. complete as specified in BOQ
Survey, Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising Main (GI Pipe), HDPE Water Storage Tank, Distribution system (HDPE Pipe), FHTC and all other appurtenant works etc. complete as specified in BOQ
Custom Bid for Services - Supply and Installation of 02 nos Diesel Generator set of 10 KVA each along with 2 kW Solar OffGrid System including 5 years maintenance at each locations in the State of Himachal Pradesh and Uttarakhand on rate contract bas.. Similar Category Operation and Maintenance Services of Power Generator(DG-Set)
CCTV, NVR, Display 43, Fencing Wire, Siren 12V, Battery 12V, Fencing Energizer, Solar Pannel, Insulator, Installation cabaling
Sap Flow Meter, Solar Panel and mounting bracket, Automatic Weather Station, Time Lapse Phenocam, Tree Increment Borer
PROVISION OF SOLAR WATER HEATING SYSTEM AT OFFICERS TRANSIT FACILITY AT VIGYAN VIHAR IRDE RAIPUR ROAD DEHRADUN
MRI of KCC Consumer Non KCC Consumer Solar STW Jal Sansthan and Bill distribution under EDD Kashipur
MRI of KCC Non Domestic solar jalsansthan STW consumer with detail MRI report and bill distribution under EDD Kashipur
Civil works, Electrical and Mechanical Works etc.
SOLAR INVERTER WITH BTY EXIDE, DSC TOKEN, AFO FIRE BALL, BRIEF CASE, WASHING MACHINE TOP LOADED 14 KG, DAK FOLDER
Supply, erection, testing and commissioning work of Automatic changeover Panel for Roof Top Solar Generation system at THDCIL complex, Rishikesh
Hindi Alphabet Board Game, Interactive clock, RHYMING WORDS PUZZLE, Big Word Puzzles Games, Mapology India with State Capitals, Tube Locks Construction Building Blocks Interlocking, Channapatna Toys, Pallanguzhi 14 Pits, National Symbols, Dummy Notes ... model, SOLAR SYSTEM 8 ...
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Kichha under ETD RUDRAPUR
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Sitarganj under ETD RUDRAPUR
Work of doing MRI of Solar Consumers having load upto 10 KW in different categories under EDSD, Araghar under EDD, Raipur.
MRI of KCC Consumer Solar Jal Sansthan STW Non Domestic consumer with detail MRI report and bill distribution under EDD Bazpur
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Kichha under ETD RUDRAPUR
Work of doing MRI of Solar Consumers having load upto 10 KW in different categories under EDSD, Balawala under EDD, Raipur.
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Khatima under ETD RUDRAPUR
Sap Flow Meter, Tool Kit for SAP Flow Meter, Sap Flow Analysis Software, Solar Panel and mounting bracket, Tree Increment Borer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation; INSTALLATION AND MAINTENACE SOLAR FENCE
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation; INSTALLATION AND MAINTENACE SOLAR FENCE
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installatio; INSTALLATION AND MAINTENACE SOLAR FENCE
MRI of KCC Consumers (5 KW to 75 KW), Solar Consumers, Govt. Offices, Jal Sansthan, STW Consumers under Electricity Distribution Divison, Khatima
Work of doing MRI of KCC consumers (5 to 75 KW), PTW consumers and Solar consumers in different categories under EDD, Mohanpur.
MRI of KCC Consumers (5 KW to 75 KW), Solar Consumers, Govt. Offices, Jal Sansthan, STW Consumers under Electricity Distribution Divison, Sitarganj
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD-II Rudrapur under ETD RUDRAPUR
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Rudrapur-II under ETD RUDRAPUR
MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Rudrapur-I under ETD RUDRAPUR
Work of doing MRI of Solar and KCC consumers (having load 05 to 75 KW) consumers in EDD Kichha under ETD RUDRAPUR
One Year contract for MRI work of KCC/NON KCC and Solar consumers above 5 KW and Bill Distribution under EDD Bageshwar
One Year contract for MRI work of KCC/NON KCC and Solar consumers above 5 KW and Bill Distribution under EDD Almora
One Year contract for MRI work of KCC/NON KCC and Solar consumers above 5 KW and Bill Distribution under EDD Ranikhet
One Year contract for MRI work of KCC/NON KCC and Solar consumers above 5 KW and Bill Distribution under EDD Bhikiyasain
PROVN OF TWO SOLAR HEATING SYSTEM (100 LTRS CAPACITY) AT BLDG NO P-122 SINGLE JCOs LIVING OF 1/3 GR, BIRPUR, DEHRADUN
MRI work of KCC Consumers (5 KW to 75 KW), Solar Consumers, Govt. Offices, Jal Sansthan, STW Consumers under Electricity Distribution Divison, Kichha
Work of doing MRI of Solar and KCC consumers (having load 05 to 75 KW) consumers in EDD Rudrapur-I under ETD RUDRAPUR
Work of doing MRI of Solar and KCC consumers (having load 05 to 75 KW) consumers in EDD Rudrapur-II under ETD RUDRAPUR
5 MP Bullet Camera, 2MP PTZ Camera, Solar channel Network video recoder, Server and software installation, Intel i5 CPU Processor latest edition, 1U 12 Port LIU fully loaded, 60 inch 4K LED TV, 12 TB Surveillance HDD, IP Based PTZ Joystick, 6 Core ... Pipe, Solar Light, ... Cable, Solar Pannel, ... Pannel, Solar Bty,
MRI Work of KCC Consumers (5 KW to 75 KW), Solar Consumers, Govt. Offices, Jal Sansthan, STW Consumers under Electricity Distribution Divison, Rudrapur-I
Construction of 01 No200 mm dia 150 mtr deep Tubewell and SITC of Solar Submersible pumping plant for Rajpurarani Peyjal Yojna in Vikaskhand Kashipur
MRI work of KCC Consumers (5 KW to 75 KW), Solar Consumers, Govt. Offices, Jal Sansthan, STW Consumers under Electricity Distribution Divison, Rudrapur-II
SITC of Solar Powered Submersible pumping plant for Gabuwa khas peyjal yojna in Vikas khand kotabag of Distt Nainital under jal jeevan mission programme
Area Leveling, Base of Concrete 3 inch alongwith tiling wk, Iron Angle 45 INTO 5mm, Sand, Stones, Cement, Iron Door 7INTO 3 ft, Iron Window 4 INTO3 ft, Iron Sheets, Toilet complete, Labour cost, Transportation, Solar Hybrid invertor Off grid, Solar Panel 500W, Gel Battery, Stand Wind and box, Installment, Electrical wiring Casing switching And Lighting work
Supply, Installation and Commissioning of 20 speaker Solar Powered Unit Electronic Bird Scaring Devi (Q3), Installation and Commissioning of Vehicle mounted Birds Repellent Device (Q3)
Work of doing MRI of KCC consumers (having load 05 to 75 KW), Solar, Govt. Offices, STW, Jalsansthan in EDD Rudrapur-I under ETD RUDRAPUR
White - LED Based Solar Street Lighting System (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6470544 Dated : 21-07-2025 Bid Document 1/7 Past Performance 30 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Work of Doing MRI of KCC Consumer having load 5 to 25 KW Non KCC solar jalsansthan STW Consumers with Detailed MRI Report in EDD Jaspur.
Installation/Purchasing of 11 KV CTs, PTs in case of Breakdown, Load Enhancement, Load Reduction, Solar Meter and General Overhauling under EDSD SIDCUL under ETD Rudrapur