Loading…
Loading…
6,350 results • Best match
Concreting and metal spreading work in 132 kV Transformer no- 02 bay, 132 kV Jadugoda bay and adjoining area at 132/33 kV GSS, Golmuri
Repairing and maintenance of Power and Lighting transformer of various place and substation at ADI colliery 2 no. 500kVA 3.3kV/440V and 500kVA 1kV/550V
Repairing of Gaskit and Stud changing of 500 KVA 11 KV/440 Volt Sl.No.TR/KJ12 Lighting Transformer at 3 Pit sub-Station of Kujama Colliery.
Complete repairing and rewinding of 3 MVA, 11-6.6KV/3.3KV Transformer, Make Andrew Yule and Co Ltd, Sl. No. 11361 under KDH Project, NK Area.
Complete repairing of 11KV 400amps HT switch Biecco make Sl No VB8A 7761 for controlling of 750KVA transformer of Benidih substation of Phularitand AMP Colliery
filtration of transformer oil of different rating with bdv analysis and moisture content report installed at different locations in respect of AKK OCP,BnK Area
Enhancement of Breather capacity by replacement of old and damaged silica gel breather container in 07 nos. HT transformer installed at main sub-station MRSS
Erection of 220V overhead line for shifting of Transformer at limit line 4A patch 4 no. for safe and frequent lightening at Bhowra North Colliery.
Drawing of 11 KV OH Line of Gondudih Feeder for Outsourcing camp and Installation of 11 KV by 440V transformer at Outsourcing camp at GKKC
Complete rewinding and repairing and maintenance of 500KVA Transformer 6.6KV/440V Sl. No WS 8 make Marson of main colony Sudamdih under ASP shaft Colliery.
Replacement of Gasket, Improvement of Insulation resistance, diagnosis and removal of any internal thermal fault of 10 MVA, 33KV/6.6KV EEF make Transformer, Sr.No. 401001
Providing and fitting of winding and oil temperature meter to 3 MVA, 33/11kv Transformer on urgent basis for safety point of view, GRD Project.
ELECTRICAL WIRING IN FILTER PLANT AND RAW WATER PUMP HOUSE AND TRANSFORMER ROOM AND WATER SUPPLY PUMP HOUSE AT RAMKANALI COLLIERY UNDER AKWMC KATRAS AREA
Maintenance work in substation, painting of transformer, switches and other parts, slogan writing for safety purpose at Muraidih substation under Muraidih,AMP Colliery, Barora Area
REPAIRING AND MAINTENANCE OF OVERHEAD LINE 220 V AND 440V FROM GASLITAND SAMADHI STHAL TRANSFORMER ROOM TO BOWRIE PATTI AT GASLITAND UNDER AGKCC KATRAS AREA
Repairing of 11KV 400amps VCB switch Andrew Yule make Sl No 3879 for controlling of 2point5MVA transformer of SOCP substation of Muraidih under AMP Colliery
Repairing of 11 KV/440V 750KVA Transformer Sl.No.- 6508/80 Make ECE installed at Jamunia office sector-1 of Matigarh Township under Block-II Area
Repairing of 3.3KV OCB Switch 400Amps, Local Sl. No.- 3.3KV/OCB/BHK/ 10, Make- ECE for controlling of Lighting Transformer of Cheap House Bhurkunda Project.
Complete repairing/ rewinding of 01 No 630 KVA, 6.6KV/415V, 3Ph, 55.11A/676.49A, Andrew Yule Make Transformer Sr. No.- NPC/539/86 of Kedla Washery.
Complete rewinding and repairing of 250 KVA, 11KV/440V, 3 Phase lighting transformer, make Crompton greaves, colliery code BCW/LT/4 of Barari coke plant.
Dismantling and installation of 500KVA, 3.3KV/440volt transformer another place due to safe and smooth power supply of Chitahi Basti in OCP Muraidih, AMP Colliery.
complete rewinding of 100kva 11kv/440v 3 phase lighting transformer, crompton parkinson make( oil capacity-360 ltrs) of matkuria colony ADI colliery of kusunda area
Part repairing and maintenance of 350KVA Transformer make Crompton Sl. No 8405 6.6KV 440V running on load at main colony Sudamdih under ASP Shaft Colliery.
COMPLETE REPAIRING/REWIND ING OF 300 KVA 6.6 KV/440 VOLT LIGHTING TRANSFORMER SL.NO.AKWMC/02 OF 4 NO SUB-STATION OF AKWMC UNDER KATRAS AREA
Repairing and rewinding of 50KVA, 3.3KV/440, Electric Corporation make Sl. No. 298/1 Transformer installed at face sump at Topa OCP under Kuju Area.
COMPLETE REPAIRING/ REWINDING OF 200 KVA 550/440 VOLT LIGHTING TRANSFORMER MAKE EEF (RANCHI) SL.NO.4015049 AT PASITAND SUB-STATION OF AGKCC UNDER KATRAS AREA.
Maintenance work in substation, painting of transformer, switches and other parts, slogan writing for safety purpose at Shatabdi Substation under Muraidih, AMP Colliery, Barora Area.
PART REPAIRING OF 300 KVA 6.6/440 VOLT LIGHTING TRANSFORMER SL.NO.A/002 MAKE METROPOLITON VICKERS AT OLD KATRAS AREA OFFICE SUB-STATION UNDER KATRAS AREA
Complete Rewinding/ Repairing of One No. 150 KVA 11KV/440 Volt Lighting Transformer Sl.No. NT-ST/LTR/11(90094) of Amal. NT-ST-JG Colliery.
Complete repairing and rewinding of 160 KVA, 11 KV / 440 V Transformer, Sl. No. 933 installed at 40 Qtr. Colony under Dakra Project, NK Area
Complete Rewinding/ Repairing of One No.500 KVA 3.3KV/440 Volt Light Transformer Sl.No.LPH/LTR/44 at Lodna Power House of Amal.Joyrampur under Lodna Area.
supply and fitting of Biometric lugs in end cable terminal of transformer ,bus-bar and 440V switches at Govindpur colliery sub-station under ABG colliery
Providing and fixing of brass gland and cable lugs for switch,transformer,starter and motor of different capacities and size at different locations of SDOCM
COMPLETE REWINDING AND REPAIRING OF 45 KVA H.T. TRANSFORMER 6.6 KV/3.3 KV/220 V,SL.NO. 2025, 3 PHASE OF AKWMC OCP UNDER KATRAS AREA
Strengthening and maintenance of 440V OH line by changing of damaged poles, muffing, stay fixing and fixing and fencing of transformer at AADOCM, Dhori Area.
Repairing/rewinding of 28 KVA welding transformer (Oil cooled) make-Indark 03 phase, 350 Amps, 415 Volt, Sl. No. WNP (HMS-13) at Kathara Washery
Conversion of 50KVA Transformer 3.3KV/220V Phase to Neutral into 3.3KV/110V-110(with midpoint earth) Phase to Phase at DBOCP Mine under CV Area.
Complete repairing and overhauling of 100KVA, 11KV/440V Transformer, G.E.C make sl.no. 0202B/64/Lpt power supply of 64 No. Colony quarter under Lohapatii Colliery
Repairing and rewinding of 315 KVA, 3.3KV/440V, oil cooled transformer of Sl. No. B00170 and Tranietz make for Argada Sub Station of Sirka Colliery.
Repairing/replacement of damaged stud bushing, cork gasket of 3.3 KV/415 Volt, 500KVA oil fill Transformer installed in rest house substation of Sawang Washery.
Reparing at site of main production 11KV OCB switch, 400 Amp, Sl. No.28413G, Make- CnG for controlling of 2MVA transformer of main sub-station.
Complete rewinding and repairing of 100 KVA, 3.3 KV/ 440 Volt transformer Sr. No. CHP- 06(P) installed at bachra siding under CHP-CPP,Piparwar
Repairing and rewinding of 01 No. 7.5 KVA auxiliary air cooled transformer 3 phase for BE-195 Sl. NO. Exc-1075 Shovel at Kathara Colliery.
Complete Repairing/Rewinding of 2MVA, 11KV/3.3KV Transformer, WNP punch sl no. - KTC/Trans./RS/08, make- Andrew Yule installed at Regional substation under Kathara
Repairing of 11KV 400amps HT switch Biecco make Sl No VB8A 7761 for controlling 750KVA Transformer of Benidih substation of Phularitand Colliery under Barora Area
Providing and fixing of making and breaking arrangement for taking power from 500 KVA transformer installed at Sub-Station in Amrapali OCP, M-A Area
Repairing and rewinding of 2 nos. 10 KVA lighting transformer, 3.3KV and 6.6KV, 440Volt at Haul Road Quarry No. 2 and 3 of Kathara Colliery.
Part repairing and overhauling of 500KVA Transformer 6.6KV 440V Sl. No 840070 Make VA Electrical Industries of new mines colony Riverside Sudamdih under ASP Colliery.
Overhauling and maintenance of 40KVA 3.3KV 230V lighting transformer oil cooled make MACCA and MACNA Sl. No 831459 of weigh bridge no 2 of BPH.
Complete rewinding / repairing of 500 kVA/11kV/440V lighting transformer oil cooled type make GEC Sl. No VQ87/3491 of 5 MTPA Patherdih Coal Washery