Loading…
Loading…
71,640 results • Best match
For the Work of Business Plane Scheme 2024-25 of Installing Earthing of Power Transformer of 33/11 KV Sub-Station and Distribution Transformers/VCB of 11/0.4 KV Sub-Station at Different Sites Under EUDD-IV, Meerut.
Tender for Painting of 220,132kV, 50 MVA 02 numbers of Single Phase Power Transformer, and Yard Structure and Identifying and sealing oil leakage points of Both Transformers installed at 220,132,33/11kV Sub-Station, HPSEBL, Jassure under ES Division
Dehydration, Filtration and Commissioning of 1 MVA 11KV/3.3KV Power Transformer, 100KVA 3.3KV/440V Lightening Transformer, 25KVA 550V/220V Lightening Transformer and 300KVA 3.3 KV/440V Lightening Transformer at South Samla Unit of MSAM Colliery Under
Supply of Power analayzer 3-phase, 11/0.433 KV, Distribution Transformer Ranging from 16 to 100 KVA Capacity. and 3 Phase Automatic Transformer Turn Ratio meter at Electricity Workshop Dehradun, Roorkee and Rishikesh workshop.
Dismantling of the damaged distribution transformers and its carriage from site of work and installation of healthy distribution transformer and its proper stacking on the plinth at various 33/11 KV S/s under EE EDD Robertsganj Urban and Rural.
Estimate of installation of additional 100KVA DTR due to overloading of existing DTR at Mirchi Bazar near Exchange at Shivpuri Town East Zone under OnM Dn -I shivpuri (783640)
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6390092 Dated : 03-07-2025 Bid Document 1/10 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6390318 Dated : 27-06-2025 Bid Document 1/10 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
EDGE BLOCK FOR TRANSFORMER, FG EDGE BLOCK FOR POWER TRANSFORMER
Concertina coil over the boundary wall and addi, work required for development at New DTR Lab Gwalior.
TENDER FOR SUPPLY INSTALLATION AND COMISSIONING OF 100KVA 3 PHASE DISTRIBUTION TRANSFORMER AT BPCL DHAR, ALIRAPUR AND JHABUA DISTRICTS RETAIL OUTLETS ok
Complete repairing of 150 KVA, 2200/220V Distribution Transformer installed at Jublee PIT for power supply to Agdoni Village, GRD Project.
REPAIR / MAINTENANCE / REPLACEMENT OF DISTRIBUTION TRANSFORMER, DEHYDRATION AND TOPUP OF TRANSFORMER OIL, REPAIR / REPLACEMENT OF HT JOINT BOX, RELAYING OF HT CABLE AND CONNECTED WORKS AT AF STATION BIHTA
Repairs to Transformer and Replacement of burnt out copper winding coils of 500 KVA distribution transformer at workshop sub-station of University College of Engineering on the O.U. Campus.
5 KVA transformer 415/415 V AC delta-star dry distribution transformer with filter as per ICF spec no. ICF/ELEC/906 (Rev-1). Firm's Offer : Make/Brand - BPS
Onsite dissolved gas analysis of oil based power transformer of different ratings and filtration of transformer oil at 33 KV main substation under AKK OCP, BnK Area
Replacement of one damaged burnt 500 KVA, 11 KV/440 V power transformer of mini transformer(Officers Colony) from DB bottom of Plant at Dugda Coal Washery.
Rewinding and repairing of Power transformer 1000 KVA, 3.3 KV/550 V, make Gujarat transformer Sl No 455/1/78-79 of KB 5/6 Pit Colliery.
Conversion of 1.5 MVA, 11KV, 3.3KV Power transformer to 1 MVA, 11 KV, 440V Lighting transformer for Bhutgoria under Hurriladih Colliery.(Asset No BCCL/HRC/trans/05).
Supply Assembly, Installation, Testing and Commissioning of 11KV Indoor VCB Panel, 1000KVA Power Transformer and 200 KVA Lighting Transformer at Belgaum and Shimoga LPG Bottling Plants Karnataka
Dismantling/Shifting of 5 MVA and 10 MVA Power Transformer/New Transformer in the Area of EUDC-III, Ghazibad in the jurisdiction of SE, EUDC-III Ghaziabad.
Dismantling/Shifting of 5 MVA and 10 MVA Power Transformer/New Transformer in the Area of EUDC-I, Ghazibad in the jurisdiction of EE, EUDD-I Ghaziabad.
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6366488 Dated : 12-08-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 450000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACE Gsecl Corpotate Office, Energy and Petro Chemicals Department Gujarat, Gujarat State Electricity Corporation Limited (GSECL) Vadodara, (Addtional Chief Engineer) Splitting
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6941303 Dated : 07-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7064438 Dated : 02-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tender Notification against NIT No. CMC/BR/20-21/SV/RS/RJ/890 for "SUPPLY OF 31.5 MVA, 66/11 kV POWER TRANSFORMER ALONG WITH NIFPS" Due Date for Submission of Bids: 29.01.2021
Repairing and rewinding of 3 no 100 KVA, 11kV,440V distribution transformer (1) Bermo station sl no 13006 make - marsons, (2) Sunday Bazar lumbi center without name plate (3) 4 no more without name plate in respect of Bokaro colliery
Custom Bid for Services - TRANSFORMER OIL LEAKAGE ARRESTING WORKS IN 2700KVA DISTRIBUTION POWER TRANSFORMER AT SOLAR POWER PLANT IN BHEL TRICHY Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
The work for Shifting of Distribution Transformer and LT Panel at Vindhyavasini Nagar Gate No. 2in the area of UEDD-Varunapar, Varanasi under Deposit Scheme on Semi Turn Key Basis
Notice for Cogeneration Plant and Sugar Mill power transformer oil filtration and BDV and Acidity Testing and testing of earth electrodes
FOR MANUFACTURING, TESTING, SUPPLY AND DELIVERY OF 20MVA, 132/11KV ONAN POWER TRANSFORMERS
Complete Rewinding, Overhauling and Repairing of 750 KVA, 500 KVA and 200 KVA 11KV/3.3KV Power Transformer 3 Phase 50 Hz Vector Group-Dyn11 at Clear Water Pumping Plant Jamadoba and different transformers at dfifferent locations Under JMADA Dhanbad
Work of Design, Supply, Erection, Testing and Commissioning of 2 x 63MVA, 110/33KV Power Transformers along with 110KV GIS Switchgear and associated equipments and replacement of old deteriorated 40MVA 110/33KV Power Transformer at 110/33KV Verna Sub
Construction of Civil works for Augmentation of Power Transformer at 12 no. 66 kV Substations under Jalandhar Division under RDSS
STOPPAGE LEAKAGE POWER TRANSFORMER AND OTHER ASSOCIATED WORKS AT EDSD I/II/III MALIYANA/PALLAVPURAM/BHOLA UNDER EDD III MEERUT
Estimate for 3.15 MVA additional Power Transformer at Bilapura Sub Station under Pachore R DC in O and M Dn.Rajgarh.
Outsource labour work for 100 mva 220/66 kv power transformer at 220 kv udhoke under grid sub division amritsar
FOR ATTENDING AND WORK of 33/11 KV Power Transformer installed at various 33/11 KV Substation UNDER ETD BALLIA
WORK OF WATER LEVEL EARTHING OF POWER TRANSFORMER AND STRUCTURE OF YARD INSTALLED AT AGWANPUR SUBSTATION UNDER EDD 2 MORADABAD
BODY EARTHING AND NUTRAL EARTHING WORK OF POWER TRANSFORMER AT DIFFERENT 33/11 KV SUB STATION UNDER EDD III BULANDSHAHR.
Repairing/rewinding of power transformer 3.3KV/220V 3 phase, 35KVA of L n T CK300 shovel-171 of Rohini Project
Complete rewinding and repairing of 2000KVA 11kv/3.3kv power transformer EEF make SL No. 4015057 of ADIC under Kusunda Area
Shifting,pulling of 3 MVA and 2 MVA power transformer 33KV/11KV grade and installation at MRSS of BnK Area.
CONSTRUCTION OF 2 NOS TEMPORARY SHED FOR SPARE 2X 63MVA POWER TRANSFORMER AT KHARU SUB STATION AND LEH SUB-STATION
Repairing/Rewinding of 1 MVA , 11/2.2 KV Power Transformer of Domestic Town Supply of Beneadih, Giridih Project, Giridih Area
Installation of power transformer with switch at Kumardihi B OCP surface substation of Kumardihi B Colliery OCP under Bankola Area.
Complete painting along with some repairing of 11/440V, 1.5 MVA Power Transformer of BCW Plant at Bhojudih Coal Washery.
For Chemical Earthing of FRTU, Power Transformer, Incoming and DCPS at installed various 33/11 KV Substation Under EUDC, Meerut.
QUANTUM OF WORKS INVOLVED FOR MINOR MAINTENANCE OF POWER TRANSFORMER UNDER THE AREA OF EDSD-Ist UNDER EDD-Ist, UNNAO.
Repairing of Compton Parkinson make Power transformer 667 KVA, 11kV/3.3 kV, SI. No. 13306 at Dahibari SubStation under C.V.