294 results • Best match
Shifting heightening of 33kV Joypur feeder with MVCC and heightening of LT lines with ABC under Dibrugarh Electrical Circle as a safety measure towards wildlife
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; porcelain disc insulator string with Glass insulator; As per scope of work
Construction of 1X25 MVA , 132/33KV Sub-station at AIIMS Campus (Changsari), Guwahati, Assam alongwith Associated Transmission Line under Deposit Scheme of Health and Family Welfare Deptt. Govt. of Assam
Providing Civil and E & M Bulk Services and Balance Development for the Under Construction 593 Nos. Residential Quarters (529/Type-II, 38/Type-III, 15/Type-IV, 8/Type-V & 3/Type-VI) at GC, CRPF, Dayapur, Silchar, Assam. (SH: Providing water supply ... of HT Line , ...
Revival of collapsed section of 132kV Srikona-Panchgram Line by introducing Composite Insulated Cross Arms technology involving supply, foundation, erection, dismantle and stringing works.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - POWERGRID Transmission Line; Electrical System or Installation, Insulator replacement of 400 KV Misa Mariani TL and 400 KV Misa Balipara TL under POWERGRID Misa TLM juri..
Please refer Tender documents.
Design, Drawing, Supply, Erection, Testing Commissioning of 132 KV S/C Transmission Line on D/C Towers from Haflong GSS to New Haflong Railway Traction Substation, Assam, India in connection with Railway Electrification Work of Lumding-Badarpur.
Tree Felling Operation at West Aprikola RF, Timber Transportation and Stacking at Sonapur Range for the works-Construction of 400 kv S/C LILO Silchar-Byrnihat Transmission Line- Office of the Divisional Forest Officer, Kamrup East Division
Boring of well point, Const. of Underground PVC distribution system, Const of pump house and boundary fencing, Drawl of HT line, Lt panel board, Const. of sign board and approach road
Boring of well points, const. of underground PVc distribution system, const. of pump house and boundary fencing, Drawl of HT line, control panel, procurement and installation of 20HP pump set, signboard etc.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Installation of TLSA in all locations of 132 kV S/C Badarpur-Jiribam TL and 132 kV S/C Karimganj Kumarghat TL; TLSAs in Transmission line towers; Service Provider
Survey, Construction of PVC Distribution System, Spout Chamber, Goat Proof Boundaty Fencing, Approach Road, Controll Room, Boring installation of DTWS, Const HT/LT Line, Transformer, Panel Board, Energy Security etc.
Survey, Construction of PVC Distribution System, Spout Chamber, Goat Proof Boundaty Fencing, Approach Road, Controll Room, Boring installation of DTWS, Const HT/LT Line, Transformer, Panel Board, Energy Security etc.
Boring of well points, const. of underground PVC distribution system, approach road, control room, boundary fencing, drawl of HT line, LT control panel board, procurement and inst. of 20HP pump sets, signboard etc
Boring of well points, Const. of underground PVC distribution system, approach road, control room, boundary fencing, drawl of HT line and LT control panel board, procurement and inst of 20HP pump set, signboard, etc
Boring Installation of Tube well, Supply installation of 7.5HP Electric motor driven submersible pump set, Construction of Control Room, Underground PVC distribution system, Spout chambers, Drawl of HT Line and LT Panel Board , Constn signboard
Re-conductoring, renovation and extension of 11 KV line and LT line along with installation of 100 KVA sub stations for power supply to Lokhimon Temple, Dolamara under Bokakhat ESD, Golaghat EC, APDCL
Providing Civil and E and Bulk Services and balance development for the under construction 593 nos. residential quarters (529/Type-II, 38/Type III, 15/TYPE-IV, 8/Type-V & 3/Type- VI) at GC, CRPF, Dayapur, Assam, (SH(Civil): Providing water supply ... of HT Line , ...
Providing Civil and E&M Bulk services and balance development for the under construction 593 nos residential quarters 529/Type-II, 38/Type-III,15/Type-IV, 8/Type-V and 3/Type-VI) at GC, CRPF, Dayapur, Assam. (SH(Civil) Providing water supply line, ... of HT line , ...
Bank protection work, const. of approach road, control room, cost of supply, laying and installation of delivery pipes and accessories , drawl of HT line, procurement and inst. of pump set, underground PVC distribution system, signboard etc
Boring of well points pillars, Construction of Under ground PVC distribution System, Construction of Pump House and Boundary Fencing, Drawal of HT Line and LT Pannel Board, Procurement and Installation of20HP Pump Set, Supporting Pillar, Sign Boar et
Construction of ADSS Optical Fiber (OFC) route, including supply of accessories (except OFC etc) by clamping tension /suspension set and stringing OFC over APDCL poles on RTTC Dharapur to Borjhar (7.2KM) and Satgaon to Sonapur(21KM)
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/KOK EC/03
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/DIB EC/02
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/RNG EC/03
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/04
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/RNG EC/06
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/01
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/BAR EC/02
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/18
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/SIB EC/09
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/BAR EC/01
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/13
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/09
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/CHR EC/07
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/MNLD EC/02
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/BAR EC/03
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/JRT EC/04
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/DIB EC/03
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/SIB EC/06
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/12
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/KANCH EC/04
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/KANCH EC/09
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/LKP EC/03
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/BNG EC/04
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/RNG EC/01
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/KOK EC/06
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/BAR EC/05
Creation of Electrical Infrastructure by construction of new 11kV line, new LT line, installation of new DTR for electrification of un-electrified Anganwadi Centres and Primary Schools under PKG No. APDCL/AWC and PS/TSK EC/03