Loading…
Loading…
586 results • Best match
Execution of Electrical Installation work for providing guarding-40mtr, 25KVA Plinth Mounted DT-1no., Shifting of existing LT line, SC-10mtr for the proposed RWSS Point at Jhampulakuda Bishnupur for PWS to BISHNUPUR (Z-II) under NIMAPARA Block.
Shifting of 11kv line, LT line and S/Stn (With out DT) at Daya River road (right embankment) from Kukudaghaipatana to Jaypur to Basantapur to Tikarapada to Kalyapur(Ch 2/500km to 8/500km) for road Widening work
Shifting of 33KV, 11KV and LT Line and Sub-station for the work Construction of 4-Lane dedicated Coal Corridor from Bankibahal (Coal Mines) to Bhedabahal (SH-10) from 0/0 km to 30/811 under Sargipali Section.
Shifting of Electrical utilities of 11KV Line of Luhagudi Feeder at Rangamatia, Mohana to 11KV and LT Line of Govindapur Feeder at Kirama for widening of Badagada Mohana Road in the district Gajapati for the year 2023-24.
Shifting of 33KV Lines,11KV Lines, Sub-Stations and LT Line for the Work Over Improvement to Old NH5 Balasore By Pass to Four Lane 6-400 km to 11-800 km, Fuladi, CED Balasore and BED, Balasore
Construction of 3ph 3w 11kv, 3p4w LT line and installation of 250 kva 11/0.4 plinth mounted S/S at kulad Alekha Mahima Sahi in Kulad village under Banarpal section in Angul district for the year 2025-26
Shifting and construction of 11KV 3ph 3W line LT line and sub-station for widening and strengthening for impvt from Krushnadaspur-Ratnagiri Road site near Ramachandrapur Chhak, Musatikiri, Kolanagiri, and Kolanagiri Hill Area from 10.00 km to 17.32
Installation of additional 500 KVA, 11/0.4 KV Plinth mounted Sub-station and required LT line to provide power supply the relocation site for Rehabilitation and resettlement of persons affected by redevelopment of SCB MCH, Cuttack at Nimpur, Jagatpur
Shifting and Construction of 11 KV 3ph 3w line, 63KVA S/S and LT Line from BEO Office to Odagaon, for widening and strengthening of Banpur to Ayatpur Road (0/0 Km to 9/300 Km) under State Plan
Shifting of Electrical utilities of 11KV Line of Govindapur feeder at Kesara to 11 KV line and LT Line of Govindapur Feeder at Khistapur for widening of Badagada Mohana Road in the district Gajapati for the year 2023-24.
Construction of 3ph 3W 11KV, 3p5w LT line and sub station due to widening and strengthening of Angul Mahidharpur Road (0/3km to 17/549 km) (From Chheliapada to Khandahata) under AnED Angul Division for the year 2024-25.
11 KV 3 PHASE 3 WIRE LT LINE and 25 KVA 11/0.4 KV DOUBLE POLE MOUNTED SUBSTATION 3 PHASE SERVICE CONNECTION ETC COMPLETE FOR PWS POINT AT BARI IN CONNECTION BARI (BARIGAON) OF BHITARAGUDA G.P. UNDER LAXMIPUR BLOCK
Shifting of 33/11 Kv DSS and LT Line due to widening and strengthening of road from College Chowk to Jamubandha Chowk 0.000km to 1.460km (from TV Centre to Jamubandha Chhak) in Angul District for the year 2025-26
Installation of 25 KVA 11/0.4 KV S/S and HT line along with isolaing DP with AB switch arrangement for P/S to DASBIDYADHARPUR RWSS Point of SATYABADI Block for PWS to Abhayamukhi ramachandrapur(Intake well point at Dasbidyadharpur)under Delang block
Execution of Electrical Installation of 25 KVA 11/0.40 KV S/S along with HT line for Power supply to the Proposed 6.0 HP/5.0 KW (including light load) PWW load of RWSS point at SILARI under electrical section Astarang of ASTARANG Block.
CONSTRUCTION OF SCHOOL BUILDING G PLUS 2 TYPE A STAFF QTR(4 NOS TYPE-II, 4 NOS TYPE-III) BOUNDARY WALL AND DEVELOPMENT WORK FOR KENDRIYA VIDHYALAY KUTRA(ODISHA)(SH HT LINE TAPPING AND LAYING FROM THE EXISTING OVERHEAD LINE TO KV SUBSTATION)
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at16/000km to 19/100 km
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at10/200km to 14/000 km
Construction of 3ph 3w 11kv, 3p5w LT line and Sub-Station due to Widening and Strengthening of Angul Mahidharpur Road (1/500km to 3/0 km) (from Jamubandha chhak to Khamar Byepass) under AnED Angul for the year 2024-25.
Construction of 3ph 3w 11kv, 3p4w LT line and Sub station due to Widening and Strengthening of Angul Chhendipada Road from Bagedia to Nuapada via Tangiri (0/0 KM to 8/477 Km) of Angul District For the Year 2024-25.
EI work for shifting of 6KVA,11/0.23KV S/S 11Kvline,LT line in different location due to Road widening work from N.H. 16 Khordha OCC Chhaka to Bajapur Via Durgapur under PMGSY-III (Package No.OR-18-224) (Batch-II) Bhubaneswar
Shifting and Erection of 3Ph 3W 11KV, 3p 5w LT line and Sub-station due to widening and strengthening of Sanahulla Paikasahi Kantapada (0/000 Km to 17/700 Km) in the district of Angul for the year 2024-25
Shifting of Substation 11 KV line and LT line from Tamarind Eve Apartment to Tatwa Avenue road towards infocity road junction for improvement and widening of road from Institute of Mathematics to Ekamra Kanan via infocity from Ch.5.700 to 7.640.
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from Kalanpur chhak to Padampur PSS via-Padampur Market and via-Krupasindhu School
Shifting and construction of 11KV 3ph3w line LT line and sub-station for widening and strengthening for impvt from Krushnadaspur Ratnagiri road site near Balikuda, TPNODLCamp, HanumanChhak and Tiranpadia from 10.00 km to 17.324 km for the year 23-24
Shifting and construction of 11KV OH Line, LT line ana DP with AB switch at different location due to improvement by widening and strengthening of Kankadahad to Mahabirod road from 0/00 Km to 10/00 km
Construction of LT Line with AB cable on PSC poles
Construction of LT Line with AB cable on PSC poles
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at 0/980 km to 5/000 km
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at 5/900 km to 9/400 km
Construction of 11KV and LT line due to road Improvement for widening and strengthening of Simore-Banki-Malipadar road ODR work from 0/0 Km to 09/90 Km in the District of Khordha under State Plan for the year 2023-24
Shifting and Construction of Electrical Utilities lines 33kv,11Kv and LT line from Taraboi Market Chhaka to Gada Khordha in order to facilitate the road Widening an Strengthening work of pattnaika-Delanga-Khordha Road from 13/00 to 34/00 km in th
Shifting and Erection of 3Ph 3W 11KV, 3p4w LT line and Sub-station due to widening and strengthening of Sanahulla to Paiksahi via Mindol road from 0/0 km to 11/519km in the district of Angul for the year 2024-25.
Construction of 3ph 3w 11kv,3p4w LT line and Sub Station due to Widening and Strengthening of Angul Chhendipada Road from Koshala to Chhendipada Road Via Brahamnabil Changudia ( 12/500 KM to 22/00 km)of Angul District For the Year 2024-25.
Shifting of 3P,3W,11 KV line, 3P 4W LT line and installation of 11/0.4KV, 63KVA DP mounted sub-station due to construction of road from Babandha patia chhak to kasiadihi via jamuchakada road under MMSY-CMRL road under RWES Dhenkanal
Repair ,Recondition 11KV O/H line from IWSS intake wellcut point to Ranipark Pump House SubStation,3.3KV O/H line from Lingaraj 33KV SubStation to Bimalagarh Track line ,Elec. Maintenance of LT line of Office sand Stowing Vat CPI at Deulbera Colliery
Shifting of 33KV Line 1.2 Km, Shifting of 11KV Line 2.6Km, Shifting of LT Line 11.75 KM, 1010KVA S/s Shifting 5 Nos., 63KVA for widening and strengthening of Jamkunda Chhak of 22.700 Km on Basta Baliapal road to Pancupali via Kalipada, Balasore.
A. Shifting of 500KVA 11 0.4KV Plinth mounted SS B. Const. of DP with AB Switch C. Const. of 11KV UG line with 4way RMU D. Const. of LT line E. Const. of 11KV UG line F. Dismantling Work IMAGE Campus Siripur BBSR
Shifting and Construction of 11KV Line, LT Line and Sub-Station due to Improvement such as widening and strengthening of Khatakura to Bhairapur road from 0/0 to 15/875 Km for safety point of view under Kamakhyanagar Block in Dhenkanal District.
Construction of 33kv,11kv LT Line and Sub Station due to road improvement for widening and strengthening of Tikatala-kodabereni road(ODR) work from 0/0km to 09/400 km in the District of Khordha under State plan for the Year 2023-24
Electrical Shifiting work
Shifting and Relocation of existing 11KV and LT line under package no-OR-18/210/PMGSY-III (batch-II) due to construction of roads and CD works under PMGSY-III for the work MRL-26PWD road Hatasabasta to NH-224 Chuda via Khalikote Asanapalli, Bologarh
Shifting and Relocation of existing 11KV and LT line under package No-OR-18-2155/PMGSY-III (Batch-II) due to construction of Roads and CD works under PMGSY-III for the work MRL-33 NH-57 to Block Boundary via Kalanga, Hatasahi Gobardhanpur
Construction of 250KVA,11/0.4KV S/S with11KV and LT line towards shifting of existing line and S/S for widening and strengthening of Khordha - Jatni - Pipili Road from 9/00 to 13/220 Km in the District of Khordha for the year 2023-24.
SITC OF 11kV Industrial Feeder from 33/11kV Ankuli PSS, Upgradation of 11/0.4kV 63kVA Transformer to 11/0.4kV, 500 kVA Plinth mounted Substation and construction of new 3 ph-5W LT Line on existing poles for Power supply to the IE-Ankuli Berhampur
Shifting and construction of 11 KV lines, LT line and Sub-station for Shifting of IIT/LT Electric lines for the work improvement of Salt Road from Balasore to Gud from 23.400km to 41.391km in the District of Balasore under State plan. under Anatapur
Shifting and Erection of 3ph 3w 33KV line, 3Ph 3W 11KV, 3p4w LT line and Sub-station due to Improvement of road such as widening and strengthening of Bamur-Dhaurapali-Madhapur road from 0/000km to 32/200 km in the district of Angul.
Heightening of 33Kv line Ramachandrapur feeder at Sainkul Canal Ch No.10630m and 10350m along with Shifting of Ss 11KV and LT line of Canal Ch 9550m 9700m 10150m 10300m 10345m 12035m 12055m 12155m 12540m of Barapada Branch Canal and 1160m of BT Disty
Shifting of 11 KV line, Sub Station and LT line from Xavier Square to Hatiasuni Chhak (LHS) for improvement and widening of road from Kalinga Hospital to Xavier Square via Govt. Polytechnic from Ch.0/000 Km. to 1/119 Km. under Xavier section.