Loading…
Loading…
586 results • Best match
Shifting and construction of 33KV 3ph3w ,11KV line , LT line and S/S from Chandpur By pass 0/000km to Airtel Office,Chandpur 2/700km under Chandpur TPCODL Section due to widening and strengthening to 4-lane standard of Defunct NH-5 ( Tangi Road 0
Shifting and new Construction of 11Kv 3Ph3W Line, Sub-Station and LT line for Strengthening and widening of Maninaga Temple road to New Jagannath Sadak road Minor Irrigation and BSNL office from 0/0 to 1/416Km and Tala Maninaga to Upara Maninaga road
Construction of 11 KV and LT line with Installation of 100KVA 11/0.4KV S/S towards power supply to the newly constructed 12 nos of E Type quarters and common area including Lift and Water supply pump in the office premises of Superintending Engineer,
Shifting and construction of 3Ph 3W 11 KV Line of 0.8 Ckm., 3Ph 6W LT line of 2.5 Km. and installation of 63KVA, 11/0.4KV D.P mounted sub-station without transformer due to Improvement such as widening and strengthening of Tilapada to Kaluria via Moh
Shifting of 11 KV line, LT line and SS on Nimapada Kakatpur road (Bishnupur chhak to ampar Chhak via Bishnupur, Ranga, Miteipur, Andhoiti, Asurdhip) to nearby safety place due to Improvement of road from 0.00 km to 13.144 km in the District of Puri
Shifting, Heightening of existing 11KV and LT Line for Widening of road from Fursund to Talakot 00/00 to 22/00km under Electrical Section,Sinapali in the district of Nuapada.Provision for erection of 9 Mtr PSC Poles,11KV Line with 3 Phase,3 Wire 10
Shifting of 11 Kv line S/S LT line from Gadachandapur to Melakasahi due to widening of P.K. road to Haripur under Nimapada No-II and from Dakshiniradas to Haripur Chhak under Pipili-I Electrical Section due to widening of P.K.Road ti Haripur under
Electrical Shifiting work
Electrical Shifiting work
Electrical Shifting Work
03 Ton capacity Motorized Winch Machine, Sagging Winch Machine 5 T Motorised, Compressor Machine Motorised 120 T with 50 Mtr Hose Pipe, Die For Pulling Eye for steel as per Moose HTLS conductor specification and for Compressor machine above, Die For Pulling Eye for Aluminium as per Moose HTLS conductor specification and for Compressor machine above, Die For Conductor steel as per Moose HTLS conductor specification and for Compressor machine above, Die For Conductor Aluminium as per Moose HTLS conductor specification and for Compressor machine above, Chain Pulley 5 Ton with 5 Mtr chain
Installation of 500 KVA, 11/0.4 KV Plinth mounted Sub-station and Construction of 0.550 ckt KMT 11 KV 3 phase 3 wire line along with 2ckm 3 phase 5 wire LT line to provide power supply to the slum area Rehabilitation complex at Nimpur, Jagatpur, Cutt
Construction of 7.5 CKM 11KV overhead line with 11mtr WPB pole, Construction of DSS (Without Transformer ) 02 no s and Construction of 1CKM of LT line with 09 mtr long PSC pole with 50mm2 ABC for diversion of 11KV Line and coal corridor road of LA
Shifting of 11 KV 3 Phase 3W Line, 63 KVA 11/0.4KV Substation ( Without Transformer 1 No) and 3 Phase 4W LT Line present near the river embankment of Mahanadi Left near village Gamei (SLD-1 and SLD-2) of Badamba Block in the district of Cuttackh
Construction of 25KVA S/S, with 11KV and LT line towards shifting of existing line and S/S from the allignment of the road for construction of PWD Road from R.D road to Halia Sahi road under MMSY Scheme at Banki under R.W. Electrical Section, Cuttack
Improvement to Old Cuttack Sambalpur Road from 0/450Km to 1/130Km such as re-construction and shifting of 11KV line, LT line, DP Sub-Station, single pole sub-station due to widening of BT road from Nimpur Playground to NH-16 Golei Chhak, Jagatpur, Im
Shifting and construction of 3Ph 3W 11 KV Line of 0.4 Ckm., 3Ph 4W LT line of 0.1 Km. and installation of 25KVA, 11/0.4KV D.P mounted sub-station without transformer of 2 Nos. due to Improvement such as widening and strengthening of Chaulia High Scho
Construction and Shifting of 33kv,11kv LT Line and 16KVA and 100 KVA Sub Station due to road improvement for widening and strengthening of Simor-banki road(ODR) work from 0/0km to 09/100 km in the District of Khordha for the Year 2023-24
Utility shifting for road work
Utility shifting for road work
Electrical Shifting Work
Construction of S/S and 33KV/11KV line with LT line towards shifting of existing 33KV/ 11KV OH line for the improvement of Khordha town road with junction development at New Bus Stand Khordha to Tahasil Office from 0/0KM to 4/330KM (S.H-27) in the D
S/R to Dibakara Marg (Ravi talkies to Tankapani road), Bhubaneswar such as Construction of RCC drain from Ch. 1/554 to 1/734 Km (LHS) in addition to Shifting of 3Q2W 33KV n LT line along the road under Uttara Feeder and Badagarh section for 2020-21
Pole Shifting of LT line for the work of ROB at 294/1-3 of line in lieu of lC No-119 at 293.83km (293/35/37) up line in between Station Bhadrak and Baudpur on Howarh -Vishakhapatnam main line in the District of Bhadrak.(Left and right side).
Construction of 3 ph 6W LT line and heightening of 11KV for clearing of road crossing conductor due to improvement of Dhenkanal town road from 2/800 km to 6/00km and 7/200km to 7/700km in the district of Dhaenkanal under the state plan (2024-25)
Construction of one each 11KV line LT line 63 KVA 11 0.4 KV DP Mounted Sub station for power supply to 3.0 HP 7 and 8 Nos IBB or IRR Load for Guava Plantation at Horticulture farm 1 and 2 at Sukinda in favour of Asst Director of Horticulture Jajpur a
Composite Long Rod Insulator Package CIS02 associated with Consultancy services to NTPC for construction of 400kV DC Twin ACSR Moose Talcher NTPC Pandiabili POWERGRID Transmission Line
Shifting of electric pole
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line in plain hilly Terrian; Replacement of Line Insulators CLR type; As per Bid Specific ATC
Engagement of Manpower for Assistance in ROU and ROW Activities of MUW and Ash disposal cum AWRS Pipeline and 33KV-11KV Transmission Line Corridor of TTPP Stage-III
ELECTRICAL WORKS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line in plain hilly Terrian; replacement of Porcelain Insulator Strings with CLR Insulators; As per Bid Specific ATC
MOEI & Fans in Non-Residential and Residential Building i/c RMO pump sets, DG sets, Street/Compound lights and HT and LT OH Line, Sub-station, Repairing of Split/Window AC units at CISF, KRTC, Mundali, Cuttack during for the year ... of HT line for ...
Shifting of 11Kv/DTR/LT line for widening of BarikpurAsurali-KasimpurOrali road from 0/000km to 19/400km at AbhilaChhak to Gobindpur chhak
Electrical Shifting Work
CONSULTANCY SERVICES FOR 220 KV SWITCHYARD EXTENSION, 220 KV OVERHEAD TRANSMISSION LINE, 220 kV CABLING AND ASSOCIATED SYSTEM FOR PERMANENT GRID POWER REQUIREMENT 2000 TPD COAL TO AMMONIUM NITRATE PROJECT AT LAKHANPUR, JHARSUGUDA (ODISHA)
PLEASE REFER THE TENDER DOCUMENTS
Shifting and construction of existing 33 KV, 11 KV and LT Line due to 6-lanning of Chorda-Duburi Road from Manpur Over Bridge to Duburi Chhak.
Shifting and construction of existing 33 KV, 11 KV and LT Line due to 6-lanning of Chorda-Duburi Road from Military Chhak to Manpur Over Bridge.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per Bid Specific ATC; Carrying out Insulator Replacement work of 500kv HVDC Talcher Kolar Bipole Transmission line under Kaniha TLM; As per Bid Specific ATC