Repairing and extension of street lighting line from Hanuman Mandir fatak to Weighbridge, siding1 by re stringing AB cable and fitting 200W LED street lights at Y Curve siding, ILBL OCP, Lakhanpur Area, MCL
Shifting of LT line from Dibya Vihar Main Road near Jalaram 500KVA 11/0.4KV Sub-Station to Dibyavihar Road no.01 to 07 and 5A under newly taken up PR road by RD Deptt. Bhubanewar
Shifting and construction of 11KV lines,LT line and Sub-Station for widening of Matigada to Betei Road ODR from 0.000km to 9.297 km in favour of Superintending Engineer R and B Division-1 Balasore
Construction of 3ph 3w 11kv, 3p4w LT line and Substation due to widening and strengthening of Purunagarh to Jagannathpur via Manikjodi (11/910km to 13/010km) under AnED Angul Division for the year 2024-25.
Shifting of existing 11KV and LT Line from Nuapada to Kuliabandha for strengthening and widening of road i.e. Single Lane to Intermediate Lane under Electrical Section Nuapada and Khariar Road_II in the district of Nuapada
Shifting and construction of 11KV line DP and LT line due to improvement of RD Road from Bhuasunipatna to Parichhala under MRL 10-RD Package No-OR-18-197 PMGSY in the District of Khordha
Pole Shifting of 11KV line and LT line for Road widening and Strengrhening of NH-49 Thinal Chowk to Marha via Saruali Road from 0/000km to 18/750 km in the Dist. of Deogarh
Widening and Strengthening to Salipur-Chhatia Road from 0/000Km to 27/240Km such as shifting of 11 KV LT line, DSS from Banahaba to Baishnav Pani Gate at under Electrical Section, Raisunguda, Salipur, Cuttack
Utility Shifting of HT/LT line and Sub-Station for the work Widening and Strengthening of Patnagarh - Khaprakhol - Harishankar Road from 0/000 Km. to 28/900 Km.under CRIF Scheme (Jogimunda and Khaprakhol Town portion)
Constn of 11KV and 63KVA 11/0.4KV DP mounted sub-station (without transformer) - 1 No. for shifting and heightening of existing HT and LT lines due to widening of road from Kantala to Saida (CH 0/00 to 9/939 Km) in the district of Angul
Shifting and construction of 11 KV lines and LT lines of 11 KV Matiali Feeder and 11 KV Feeder from Natapara JIO tower to Matiali Chhak and from Bhalukasuni to Matali Road in favour of Office of SE, R and B, Division-1, Balasore, CED Division
Construction of 100KVA, 11/0.4KV S/S, 11KV line and DP with AB switch lines towards shifting of existing 100KVA, 11/0.4KV S /S, 11KV line and DP with AB Switch and LT lines due to Road wideneingwork from N.H. 224 Bamadhia to Dingara via Chandiapall
Constn of 11KV cut-point with 90 degree angle - 6 nos. and 11KV guarding on single pole - 3 nos. for shifting and heightening of existing HT and LT lines due to widening of road from Banabira hill to Para (CH 0/00 to 14/288 Km)
Installation of 25 KVA 11/0.4 KV S/S and HT line along with isolaing DP with AB switch arrangement for power supply to the proposed PWS load RWSS point at- village AREDA AND NALIBASANTA of DELANG Block
Providing of 01 No 100KVA 11/440V pole mounted substation and drawing LT line for power supply to the village Trilochanpur ( New basti of Langijoda and Madanmohanpur ) of Kandhal G.P. under CSR Scheme of Lingaraj Area
SHIFTING OR HEIGHTENING OF 11 KV LINE AND LT LINE AT KOREI BRANCH CANAL FROM RD 11.000 KM TO 23.250 KM AND MUKUNDAPUR DISTRIBUTARY FROM RD 0.000 KM TO 8.130 KM OF RENGALI IRRIGATION PROJECT, PHASE2
Shifting and Erection of 3Ph 3W 11KV, 3p4w LT line and Sub-Station due to widening and strengthening of Talcher-Kankili-Luhundi road from 0/000 km to 15/141 km in the district of Angul.
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from Sukadevpur (HP Petrol Pump) to Kiapada post office
Shifting of 11KV Line , LT line and S/S from Hospital Chowk to Rangadhipa Chowk due to road widening (MDR 27) from 0/000 to 0/628 Km under state plan for the year 2022-23.
Shifting and construction of 33KV 3ph3w,11KV line , LT line and S/S from Chandpur Airtel Office 2/700km to Tangi Bypass 4/700km under Tangi TPCODL Section (Tangi road from 0/0km to 4/700km)
Widening and Strengthening to Salipur-Chhatia Road from 0/000 KM to 27/240 KM such as Shifting of 11 KV And LT Line From Kumuda Jayapur to Kaitha at under Chhatia Electrical section, Badachana, Cuttack
Shifting and Construction of 11kv line S/S and LT line due to road widening work from MRL-16 Bankoi to Patabandha via Sahajpur and Baradandi under PMGSY-III package No.OR-18-212 RW Division Bhubaneswar
Const. of 11kv, LT line and 11.04 kva sub station and providing 3 phase power supply to 20kw and 15kw load to 100 seated girls hostel and 50 seated boys hostel building of DPIASE, kanisi building
Shifting and construction of 3 Ph 5 W LT line due to Improvement of Jail Road from ANM Training center Chhak to Ramdas Chhak from 0/00 Km to 0/556 in the District of Dhenkanal
Construction of 11KV Line and LT Line towards shifting of existing lines coming on the drain and Footpath along with Illumination of the road from Damana-DAV to Road at Niladri Vihar near Sani Temple, Bhubaneswar
Shifting of 11KV and LT line for improvement such as widen and strengthening to Udaygiri to Gadajit via Majhipada from 0.00 km to 9.470 km from SL to IL under SP for the year 2023-24
Shifting of existing 11KV line, Sub-station and LT line for Kapilaprasad Jatani road from 10/000 km to 14/160km in the district of Khordha to nearby safety place due to improvement of the road
Shifting of 33KV line, 11KV, LT line and Substation for improvement and widening of 100 feet road from OERC square to left parallel road via Kanyashram from 0/000km to 1/027 km C.S. Pur, Bhubaneswar.
Construction of 11 KV OH Line (2.72 CKM), UG Line (0.075 Km), 1 X 250 KVA DSS , 2 X 500 KVA DSS and LT Line for providing power supply to different units at Ramdaspur I.E., Cuttack.
ELECTRICAL WORK
Shifting and Construction of 3Ph 3W 11KV line LT line and S S from Ranpur to Darpanarayanpur Ranpur Feeder in the District of Nayagarh for road widening work under electrical section Ranpur for the year 2023 24
Shifting and construction of 11KV line and 3ph 4w ABC LT Line from Odagon to Ayatpur (3.2 Km) for Widening and strengthening of Banpur to Ayatpur Road from 0/0 to 9/300 Km under State Plan.
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from Kiapada post office to Kiapada Bazar 25KVA (Brahmanigaon chhak)
Shifting and construction of 3ph 6w LT line with LT XLPE AB Cable-1.971 CKM from Galua Chaka Bus Stop to Sai Mobile Point under Banpur to AyatpurRoad(0/0km to 9/300km), Khordha under state plan.
Shifting of 11kv line, LT line and S/Stn (With out DT) at Daya River road (right embankment) from Daya Bridge Road to Nuagram and ITIPUR Road(Ch 0//000km to 2/500km) for road Widening work
Shifting and reconstruction of LT line and S/S for improvement such as widening and strengthening of Link road for a length of 1.880 km of Bandalo Enderpada road at 14.670 km in the district of Jajpur
Shifting and re Construction of 33 KV line Aul Feeder LT line Guarding and 33/0.4 KV 250 KVA plinth mounted DSS without DTR for Construction SDH Pattamundai New in Kendrapara District for the year 2025 -26
Erection of LT line for providing power supply to CCTV Camera along with illumination of the 04 kms Coal corridor road from DLB Railway siding no-02 to NH Gate entry point at Lingaraj OCP, Lingaraj Area
11 KV 3 Phase 3 wire LT Line and 25 KVA 11/0.4 KV double pole mounted substation 3 phase service connection etc complete for PWS Point at Deomali resort center of Kotia G.P. under Pottangi Block.
Shifting of 16KVA SP Mounted S/S and LT Line due to Widening Work Near Saradhapur Chhaka on NH-149 to Bella Chhaka of Kantiapasi-Kunjam Road Via Paunsia of Angul District for the year 2026-27.
Installation of 25 KVA 11/0.4 KV S/S along with HT line for power supply to the proposed 2x7.5 HP /12 KW Plus 1 x15 HP /4 KW RWSS point at- KUMUNDALA of DELANG Block under electrical section, Delang.
Installation of 25 KVA 11/0.4 KV S/S along with HT line for power supply to the proposed 1x 5 HP (4 KW) PWS load of RWSS Point including light load at HANDIALI of BRAHMAGIRI Block under Electrical Section, Sunamuhin.
Shifting and erection of 25 kva Substation, 3ph 3w 11 kv and 3ph 4w LT line due to Construction of HL Bridge over Chanagudi Nallah at 19/150 km on Kaintragarh Doruha Road for the year 2025-26.
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from BC high School to Panchasheel Grocery store via- Ertakl Bazar
Shifting Estimate for Construction of 11kv and LT line due to improvement of RD from Dinger to Barabati upto Block Boundary under Package No-OR-18-198/PMGSY-III (Batch-II) Block Begunia in the District of Khordha.
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from Chaura chhak ro B.c High School via-Gagan Babu chhak.
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from Kamaragaon-Matipaka road to Kamaragaon end (Near Das Mobile store)