Loading…
Loading…
4,483 results • Best match
RUNNING WORK OF REPAIR AND RECONSTRUCTIONS OF HT/LT LINE AND POLE DAMAGED BY NATURAL DISASTER, HEAVY RAIN AND STORM WIND UNDER ELECTRICITY DISTRIBUTION DIVISION-II, GORAKHPUR.
LT Line shifting and construction of 11 kv line and installation of transformer to load enhanceing for uco bank under deposit scheme 2023 24 in judiriction of EE EDDI BHADOHI
Construction of 11KV Independent Feeder Underground HT Line for Modernization and Development of Dr. Sampoornanand Sports Stadium, Sigra from 33by11 KV S S Nagar Nigam, Varanasi
Work of addtionaltransformer and construction of new HT Line in Siddharthanagar and instlation of incoming and outgoing panel of Pakdi sub station under bp 2024-25
rampur road mini byepass tirahe se jhumka tirahe tak sadka chaudikaran me vadhak 33 avam 11 KV HT line tatha transformer ko shift karne ka karye
Stringing Work at 132 KV Pilipokhar ( 400) - Dayalbagh Line Existing on DC Tower and Construction of 132 KV Bay at 132 KV S/S Dayalbagh under ETD-II Agra
Lopping / Chopping of Branches of Trees Falling in the Range of Line Corridor of 132KV Farid Pur(220) - Bisal Pur Transmission Line (under Construction) alongwith other associated Works under E.T.D. - II, Bareilly
Construction of LILO of 132KV S.C. C.B. Ganj- Dhampur Sugar Mill Transmission line on S.C. Towers alongwith Materials and other associated Works at 132KV Sub Station Meerganj (under Construction) under E.T.D., Bareilly
THE WORK OF CHECKING TIGHTENING OF SECTION TOWER OF 132KV BHARTHANA-AURAIYA, 132KV AURAIYA- SIKANDRA, 132KV BHARTHANA-BIDHUNA, 132KV BIDHUNA-DIBIYAPUR AND 132KV PANKI-DIBIYAPUR TRANSMISSION LINE UNDER ELECTRICITY TRANSMISSION DIVISION-ETAWAH
Maintenance Of HT/LT Lines
Internal electrification in Super market- 5 Nos Samiti Godown 01 Nos Canteen 01 Nos extention of LT line and cabling work AT SMY Mau
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD, Kheragarh, Agra.
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD-1 Agra.
Shifting work of 33 KV, 11 KV and LT line due to road widening in the area of Electricity Urban Distribution Division-I, Muzaffarnagar
Release the different new connection, Increase and decrease load and HT , LT Line Shifting etc. (running) in deposit scheme under Electricity Distribution Division Gajraula.
For the work of Maintinance Damage 11 KV nd LT Line and Their Accessories due to unexpected reasons time to time under EDD Kheragarh
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD-2 Agra.
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD-IV Kiraoli.
52/2022-23/EDCR Replacement of Jarjar wire and Construction of LT Line etc. under Nagar Nikay works, EDD-I, Rampur(Semi Trunky basis)
For the Work of Maintenance Work of HT/LT Line Before Kanwar Yatra 2024 to Avoid Any Electrical Accident Meerut Under EUDD-V, Meerut.
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD, Kheragarh, Agra.
Proposed work for Maintenance of Damaged 33KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD-4 Kiraoli.
Repairing of LT line, replacement of damaged steel tubular poles, S/I of street lights, repairing of LED street lights at NMY Sambhal (Sambhal)
Repairing of LT line and replacement of 05no. Damaged steel tubular pole and internal electrification in 02no. toilet block at NMY Baheri (Distt. Bareilly)
Internal electrification in 10 no. Super market shops, extension of LT line and S/F of LED street lights at NMY Sultanpur Chilkana (Saharanpur)
Construction of 11 KV/LT Line against Deposit scheme (Package No. 322/21-22) under jurisdiction of EDD, CESS-I, Cis Gomti Lesa, Lucknow
Release the different new connection, Increase and decrease load and HT , LT Line Shifting etc. (running) in deposit scheme under Electricity Distribution Division Hasanpur.
Work of Installation of 250 KVA T/F, Shifting of 11 KV line and electrical connection with LT line under EDD-Ghazipur Nagar, Ghazipur
Proposed work for Maintenance of Damaged 33 KV/11KV/LT Line due to Daiviya Aapda at various places in the area of EDD- Kheragarh.
struction of Infrastruction AND HT LT line, substation against advance deposit head 2019-20 under the area of EUDD Sitapur road,Transgomti LESA, Lucknow
Work for Repairing of HT/LT Line and other associated work effected from Aandhi Toofan in jurisdiction of Electricity Distribution Division-III, KHAGA, Fatehpur
Internal Electrification in 5 no. C type shops and extention of LT line across the newly constructed shops at SMY Meerapur (Mandi Samiti Khatauli)
work of Shifting the poles, wires and tranformers of HT/LT line Ghazipur-Azamgarh road (from Birno thana to Jalalabad) under EDD-Jangipur, Ghazipur.
Under the Business Plan Scheme 2026-27, work of strengthening of 11 KV line and strengthening of LT line under electricity distribution division Modinagar.
Under the Business Plan Scheme 2026-27, strengthening work of 11 KV line and strengthening work of LT line under electricity distribution division Muradnagar.
KOTWALI WARD ANTRGART SHRI KALGHAIRAV MANDIR GATE SE INDIAN POST OFFICE TK BHUMIGAT LT LINE DALNE HETU ROAD CUTTING KA CHARGE KE SAMBANDH ME
Construction/ Mentinance of 11 KV/LT line under Business Plan at Vill Bajrang Pur, Gopalpur at EDSD I Sikandra Rao under EDD-III, Hathras.
Construction/ Mentinance of 11 KV/LT line and Other Associate Work under Business Plan at various placeat EDSD II Sasni under EDD-III, Hathras
For the work of Replacement Jarjar Wire of 11 KV, LT Line in area of EDD-Sandila, Hardoi Under Jurisdiction E.E., EDD-Sandila, Hardoi.
RUNNING CONTRACT FOR CONSTRUCTION OF 11 KV AND LT LINE UNDER DEPOSIT SCHEME WORKS IN THE AREA OF SDO EUDSD XII GANGA NAGAR MEERUT
DAMEGE OF 11 KV 33 KV AND LT LINE DUE TO HEAVY STROM AND OTHER SUB DIVISION KHATAULI RURAL UNDER EDD KHATAULI RUNING TENDER
Work for Strengthening of HT/LT Line of 11 KV Jangipurkhurd feeder fed from 33/11 KV Sub-Station Saraikhwaja Under EDD-IV Jaunpur
Work for Strengthening of HT/LT Line of 11 KV Nadiyapar fedeerer fed from 33/11 KV Sub-Station Saraikhwaja Under EDD-IV Jaunpur.
RUNNING CONTRACT FOR CONSTRUCTION OF 11 KV AND LT LINE UNDER DEPOSIT SCHEME WORKS IN THE AREA OF SDO EUDSD VII KANKER KHERA MEERUT
Replacement of 33 KV, 11KV, LT Line and Sub-station by underground double circuit railway Cable crossing of DFCCIL Railway Track under DVVNL, Agra
Work for Replacement of old and jarjar HT and LT Line conductor on main Polymer and Dbauli West Feeders under Dada Nagar Division Kanpur
Shifting of LT Line and 11 KV Line double pole exposure at Sardari khera, Alambagh against Deposite scheme under E.E., EUDD-Alambagh, LESA, Lucknow.
The work of lopping and chopping of tree branches lying on 33 KV, 11 KV and LT line under the area under EUDD (Chowk)
Short tern E-Tender for Maintenance work of different type LT Line nearest festivals at S/S G.P.R.A , Under the area of EDD-B.K.T
The Work for Shifting of 33 KV, 11 KV and LT line in the area of ROB from Pillar No-P-40 to Pillar No-P-1 for Construction of proposed New Fly Over under the area of UEDD-VIII Varanasi under EE, UECD-II, Varanasi on Turn-Key Basis.