Loading…
Loading…
4,486 results • Best match
LT and HT line Shifting work in the area of EDD Deoband
Work of the Cutting and Chopping of trees branches in the feederwise,Line maintenance work sagging,stringing andguarding of damage lines in the area of 33/11KV Sub-Station (Sub-Division,Chinhat)against O and M Head under the Jurisdiction of EUDD CHT
Work of the Cutting and Chopping of trees branches in the feederwise, Line maintenance work sagging, stringing and guarding of damage lines in the area of 33/11 KV Sub-Station Chinhat, Omega and UPSIDC (Sub-Division, Chinhat) against O and M Head
SUPPLY OF TOWER , TOWER ACCESSORIES AND ASSOCIATED HARDWARE AND WORK OF FOUNDATION , ERECTION , STRINGING OF NEW 132 KV TOWER AND DESTRING AND DISMANTLING OF EXISTING OLD 132 KV TOWERS AND OTHER ASSOCIATED WORK OF 132 KV LILO PORTION OF 132 KV S.C.
Work of the Cutting and Chopping of tree branches in the feederwise, Line maintenance work sagging, stringing and guarding of damage lines in the area of 33/11KV S/s, Vibhutikhand, Virajkhand and Mantri Awas Sub-Division, Vibhuti Khand O and M Head
Work of the Cutting and Chopping of trees branches in the feederwise, Line maintenance work sagging, stringing and guarding of damage lines in the area of 33/11 KV Sub-Station Sector-1, Sector-4 and Sector-5 (Sub-Division, Gomtinagar Vistar) against
Erection of 11 KV HT Line 0.4 KV LT Over head Line construction of 11 0.4 KV new sub station for feeding temporary power supply for typeIV (Block B) quarters and type III (Block B) quarters in new constructed tower buildings of new colony HTPS Ka
Maintenance Work of Protection of ST Poles with Plastic Sheet, Barricading of T/F (250 to 630 KVA T/F), Sagging of Loose Span and Guarding of LT/HT line during Kanwar Marg (Siwaya Toll Plaza to Modipuram) in the area of EDSD-II, Pallavpuram under EDD
Maintenance Work of Protection of ST Poles with Plastic Sheet, Barricading of T/F (250 to 630 KVA T/F), Sagging of Loose Span and Guarding of LT/HT line during Kanwar Marg (Partapur Bypass to Mohiuddinpur) in the area of EDSD-II, Partapur under EDD-I
Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida (Sector 108 FN CB22, Sector 53 FN 3 to A block Sector 34, Sector 53 FN 5 to C and B block Sector 34).
Work of giving 275 KVA new connection HV-2 for M/s Mac Industry at site of Kemri Road, Pahadi Gaon, Rampur. 1500 meter HT line supply feed from 11 KV Aloofarm feeder emanating from 33/11 KV S/S Pahari Gate under EDD-I, Rampur.
Transmission Line, Transmission Line Training System, RLC Resonance Trainer, Electricity Lab Trainer, Three Phase Transformer Lab, BLDC, Transformer trainer, Single Phase AC Motor Control, Synchronous machine accessories, Power Measurement using, DC Series Motor Shunt Lab, DC Shunt Motor Compound Lab
Comprehensive preventive and breakdown maintenance job of different 400/220/132 KV Transmission Line under ETC Noida.
Comprehensive preventive and breakdown maintenance job of different 400/220/132 KV Transmission Line under ETC Noida
Diversion height raising of 220 KV D/C Fatehpur Unchahar Transmission Line under Electy. Trans. Division- Fatehpur
Round the clock routine and Breakdown maintenance of 11 KV Overhead lines and underground 11 KV HT Cables upto 400 mm2 of ATP Colony resagging of LT lines and supply and fixing of spacers in three phase LT lines of ATP Anpara
Custom Bid for Services - For the work undergrounding of overhead/HT/LT lines and shifting of LT poles on turn key basis for Sadar Bazar under 11 KV Ghantaghar feeder supplied from 33/11 KV substation Gandhi Park under the jurisdiction of EUDC Firoza.. Similar Category Electric Cabling Service Operation and Maintenance Of Electrical Systems/Electrical Installations
Maintenance of 11 KV 33 KV and LT lines in the area of EDSD Behat under EDD Beaht
Work of Maintenance of HT/LT lines in the area of EDSD Ist (Jaithra) under EDD Ist Etah.
FOR REPLACEMENT OF 33 KV 11 KV, LT LINES/ CONDUCTOR AND POLES IN EDD POWAYAN UNDER EDC SHAHJAHANPUR
Work of Maintenance of HT/LT lines in the area of EDSD IIIrd (Jalesar) under EDD II Etah.
Work of Maintenance of HT/LT lines in the area of EDSD Ist(Etah) under EDD II Etah.
Work of Maintenance of HT/LT lines in the area of EDSD Vth (Etah) under EDD IInd Etah..
VARIOUS ELECTRICAL WORK DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT STRENGTHENING OF 11 KV LINE, NEW AND REPAIRING OF LT LINES
IEsDsDui-nIg, LCaolintpnuerction by Constructing oh HT/LT Lines and Substation under Diposite Work in The Area of
Work of Maintenance of HT/LT lines in the area of EDSD IVth (Etah) under EDD Ist Etah.
Maintenace and repair of Damaged HT/LT lines in the area 33/11 KV substation Gauriganj and Barnatikar.
Attending of 33 KV 11 KV and LT Line Emergency Breakdown
Attending of 33 KV 11 KV and LT Line Emergency Breakdown
WORK OF REPAIRING 11 KV/LT LINE FIELD OF EDSD NANAUTA
CONSTRUCTION OF LT LINE BY NEUTRAL WIRE UNDER EDD-Ist BSR
HT/LT LINE HARRAIYA CHOURA SE DEVIPATAN MANDIR TAKSHIFTING KA KARYA
Repairing of Damaged 33KV, 11KV, LT Line under EDSD-II, Kishni
Maintenance/Repairing of 33KV/11KV/LT Line under EDD-I, Mainpuri
Repairing of Damaged 33KV, 11KV, LT Line under EDD-III, Mainpuri.
Construction of 33 KV Feeder and 33,11 KV and LT Line.
REPLACEMENT OF JAR JAR TAR OF LT LINE NI SHIKARPUR TOWN
REPLACEMENT OF JURJAR VCB PANNEL AND GUARDING OF HT LINES ON PLACES UNDER EDD 1 SHAHJAHANPUR UNDER EDC SHAHJAHANPUR (MVVNL)
Construction of various type HT/LT line and sub-stations against sanctioned packages under deposit scheme in the area of 33/11 KV S/S New Campus, Ram Chandra Mission (RCM) and Eldico under the New Campus S-Div., Under the jurisdiction of EDD-B.K.T.
Repairing and extension of LT Line SF of LED Street light Repairing of I/E in different duildings SF of 150 LTR capacity 2 No water cooler with accesories Construction of Tubewell SF of 1HP Submersible Pump 2 No cabling work AT NMY Mungrabadshahpur
Carrying out various electric works on Turn Key Basis for shifting of 33 KV, 11 KV and LT Line with other associated infra near of Chaitanya Vihar Bridge to Burja Chauraha Road, Vrindavan (Full Deposit work) in the area of EE, EUDD II, Mathura
Electrical Utility Shifting including work of 33 KV Under ground Line, Work of Material for Double POLE structure for 33 KV Line, work of LT Line by Arial Bunched Conductor for Construction of 2 lane ROB in lieu of level Crossing 61/B on Prayagraj
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION LT Line, ABC Conductor at Sitaram Colony and Pony Road, shuklaganj Unnao. In the area of 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao. against Package No. 92/EDC(U)/D-2 Business Pla
Quantum of works involved in construction of new 11 KV/LT line and LT S/S for G/S to different consumers (For load above 50 KW) under the full deposit scheme under the area of EDSD-Ist and IIIrd under EDD-Ist, Unnao.
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION OF NEW 33 KV / 11 KV / LT LINE AND LT S/S FOR G/S TO DIFFERENT CONSUMERS AND DIFFERENT WORKS UNDER THE FULL DEPOSIT SCHEME UNDER THE AREA OF EDSD-IANDIII UNDER THE EDD-P.D. NAGAR, UNNAO.
Looping Chopping of tree branches for clearance of HT/LT line at 33/11 KV Sub Station Gahru and Bani. After clearance of line throwing out pieces of tree branches from site to dumping place under jurisdiction of EDD, Nadarganj, Amousi Zone, Lesa, L
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION LT Line ABC Conductor at Gotakhor, shuklaganj Unnao. In the area of 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao. aginest Package No. 91/EDC(U)/D-2 Business Plan Year 2022-23.
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION OF NEW 33 KV / 11 KV / LT LINE AND LT S/S FOR G/S TO DIFFERENT CONSUMERS AND DIFFERENT WORKS UNDER THE FULL DEPOSIT SCHEME UNDER THE AREA OF EDSD-II UNDER THE EDD-P.D. NAGAR, UNNAO.
For Shifting of pole and HT and LT line at Faizabad road from Daliganj churaha to Balaji sweet under sub division Ekka stand and shifting of pole from shani Mandir to IT chauraha under sub division University against Deposit head in the area of EUDD
1-CONSTRCTION OF 100 MMX 80 CM DEEP GRAVEL PICKED TUBEWELL 2- SINGLE PHASE 3HP SUBMERSIBLE MOTAR PUMP SET WITH ALL ACCESSRIES INCLUDING EXTENSION OF LT LINE 3-8M HIGH STEEL STRUCTURE STAGING FOR 3000 LTR/5000 LTR PVCCAMP 4-SUPPLY AND FIXING OF STORAG