Loading…
Loading…
1,813 results • Best match
Hard Top Deep Freezer, Storage water cooler, Cablet Extension Board, Storage Container, Storage Organizer
As per BOQ
AIR CONDITIONER SPLIT 1.5 TON, ICT of AIR CONDITIONER SPLIT 1.5 TON, AIR CONDITION, SPLIT, 2 TON, ICT of AIR CONDITION, SPLIT, 2 TON, ADDITIONAL COPPER TUBE, WATER COOLER, 150Litre, ICT of WATER COOLER, 150Litre
Portable RO Plant For Haemodialysis (Q3), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))
Portable RO Plant For Haemodialysis (Q3), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))
Portable RO Plant For Haemodialysis (Q3), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))
RUNNING MATT 50MTR X 3 FEET, REVOLVING CHAIR, WATER DISPENSER TABLE TOP, GARDEN PIPE, TABLE GLASS 4X3 FEET, CENTER TABLE
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6562531 Dated : 12-08-2025 Bid Document 1/6 Estimated Bid Value 24351 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6356397 Dated : 20-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6309917 Dated : 04-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
As per BOQ
Indoor Gym Equipments, 3D FITNESS CHART, INDOOR MAT, FALSE CELLING, ELECTRIFICATION, SOLAR WATER COOLER BOQ Title GODHRA01
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6397449 Dated : 30-06-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Camouflage Net Synthetic 30x20, Table Jhalar3x2, Round Table Jhalar, Water Purifier 100 to 200 ltr, Digital Camera, Charcol, Photo frame with feetings
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2)
As per BOQ
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ... Drinking Water Coolers (V3) ...
Almirah - Handcrafted (Q3), Revolving Chair (V5) (Q2), Executive Table (V3) (Q2), Computer Table (V2) (Q2), Hot Cold Water Dispenser (V2) (Q3) (3 (3 ))
Biometric Lock, Smoke Detector, Puls Oxymeter, Stainless Steel Thermos 10 Liter for tea, Water Dispenser, Jerican, Water Camper 20 Liter, Big Dustbin Nilkamal
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2)
garedn pipe, cordless bell, googles, key chain, digital clock, plastic container, sticker navy crest, voltage power regulator, plastic water dispenser, plastic bucket 20 ltr
Protective Hard Glass for Table 3 x 4 feet 12mm, Water Dispenser Voltas with bottle, Washer Pipe, Nozel for water pipe, Mobile Storage Box
Construction of permanent ladder, Fabrication of shed over water cooler and other related works at IPR Campus, Bhat, Gandhinagar
WHITE BOARD 3X4, WATER COOLER, PAINT GOLDEN YELLOW, PAINT BLACK, PAINT RED, THINNER, STEEL GAMLA, RADIUM TAPE, PEDESTAL FAN
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6636950 Dated : 05-09-2025 Bid Document 1/7 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6963690 Dated : 04-12-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6718050 Dated : 23-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) ( ( 3 3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6358809 Dated : 23-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
As per BOQ
As per BOQ
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) ( ( 3 3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) ( ( 3 3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2), Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) (3 (3 ))