Loading…
Loading…
2,434 results • Best match
As per tender documents
Making interconnection from 600mm dia Siraspur pumping main to 600mm dia PSC at Burari Swaroop nagar road in AC -05 Badli under ACE(M)3
Strengthing of Suction Pipe Line of Set No. 1 at 748 Janta Flat Shivaji Enclave BPS.
INSTALLATION OF MEDICAL GAS PIPE LINE IN WARD NO 5 (OLD WARD BLOCK) IN SDN HOSPITAL
Providing and Laying CPVC pipe line from STP to RCC tank at Siri Fort Sports Complex.
Strengthing of Delivery pipe line and other allied accessories at 28- Block west Patel Nagar BPS.
Day to Day maintenance of water and sanitary pipelines and sewerage pipelines in basement to stop leakage in Group-I to IV of mega housing at D-6 Vasant Kunj.
Day to Day maintenance of water and sanitary pipelines and sewerage pipelines in basement to stop leakage in Group-I to IV of mega housing at D-6, Vasant Kunj
Day to Day maintenance of water and sanitary pipelines and sewerage pipelines in basement to stop leakage in Group-I to IV of mega housing at D-6 Vasant Kunj.
SH Providing insulation on existing chiller pipelines at various locations in GIPMER
Road cutting permission for laying of IGL gas pipe line at sudershan park Block C,D,E,F in C-100/KBZ , Sub Head-Road Restoration by pdg. CC in block C,D,E,F Sudershan Park and imp. of lane by Pdg. RMC from F-77 to F-82 sudershan park Moti nagar w
Laying of 300 mm dia sewer line rising Main from Trolley at Haiderpur Ayurvedic Hospital to Shalamar village SPS in AC-14(Shalimar Bagh)under EE(D)-61/SE(C)-6
Improvement of W.S by tracing of unaccounted flow/different flow b/w feeding end and tail end in 1200mm clear water rising main emanating from 20MGD BPS Okhla to ESI UGR.
Repairing of heavy leakage in 300 mm dia tapping from 1100 mm dia water rising main near Kingsway Camp Red Light, Outram Lane in Mukherjee Nagar Ward under E.E.(D)-042.
P/L 800 mm dia rising main including construction of sump well for carriage of treated effluent from STP Kondli to Smirti van/lake and for nearby DDA and MCD Parks
MAINTENANCE OF E&M SERVICES AT MS APPT NEW DELHI SH- SITC OF 630 A RISING MAINS IN C BLOCK Subwork/Packages: SITC of 630 A rising main in C block
M/o Completed scheme under Nazul A/c-II (SZ). SH-Maintenance of green Area by providing and Laying CPVC pipeline for Irrigation at Recreationa Complex at Tughlakabad.
RMO E and M services installed at 100 bedded LBS Hospital, Khichripur, Delhi. Sub Head Repairing and replacement of defective panel, pipeline and water supply pump at LBSH
M/o various Bio-diversity Park under South Zone. SH - Deployment of Manpower for cleaning and sweeping and maintenance of GI Pipeline Network at Aravali Bio-Diversity Park.
RMO Electrical and Mechanical work services at Vikas Bhawan-II Delhi-110054 (SH- Replacement of damaged / rusted Fire Fighting pipeline and various other accessories of fire fighting System)
Pipeline extension work from washing line till each of the 7 no. of Railway platforms at RDI Anand Vihar in Delhi DO under Delhi and Haryana State office.
Operation and Maintenance of various Toilets block in NDMC Area. Providing and Laying GI Pipeline for water Connection of PTU 14-001 at Bhagwan Dass Road, New Delhi
SPECIAL REPAIR / REPLACEMENT OF EXTERNAL WATER SUPPLY, GI/CI PIPELINE AND ALLIED WORKS AT PUMP HOUSE AND MD ACCN AT VSV, AF STN NAJAFGARH UNDER GE (AF) TUGHLAKABAD
M/o various Bio-diversity Park under South Zone. SH - Development of Borewell and laying of GI pipeline network for watering plants at Tilpath Valley Bio-Diversity Park.
Construction of Road and laying of RCC pipeline in Balance streets of Block C, G and H of shaheen Bagh in Okhla Constituency AC-54(Regn. No. 1069).
Group -D Dighwara, Laying of PE Pipeline Network and associated works including Last Mile Connectivity (LMC) for PNG connections in Saran District under Muzaffarpur GA, State of Bihar.
M/o various schemes under NA-II (East Zone)sh-GPR Survey for detection of underground pipeline alignment and defect/leakage identification of Pump House, Gazipur.(Specialized Work)
RMO various E&M services at West Block-4 & 5 (Navy), R.K. Puram, New Delhi(SH:- Repairing of fire fighting system pipeline at West Block-5, R.K. Puram).
Custom Bid for Services - Maintenance And Monitoring Of Cathodic Protection Of BPCL ATF Pipeline BPC Bijwasan Installation To DAFFPL Fuel Farm For Two Years At BPCL Delhi AFS
Removal of contamination and Improvement of water supply by replacement of old deep damaged and laying loop line of 100 mm dia. DI water pipeline at Samta Vihar Som Bazar Road, Gali No. 13/1, 13/2 and 3/3, Sant Nagar ward No.10 (N) Burari Constituenc
Improvement of water supply by replacement of old deep damaged water pipeline of 200 mm dia 150 mm dia 100 mm dia from Harit Vihar pulia to Gali No.1 B -Block Harit Vihar, Sant Nagar ward no 10 (N) Burari Constituency AC -02 under A.C.E.(M)-4.
Restoration of Road cut made for Laying of Natural Gas Pipe Line by Trenchless method in Nasirpur Block A and B for extension of main gas pipe line. SH P/L CC M-20 in Block A and B
Replacement of damaged/ rusted up 350mm dia sewer pumping main from SPS C-9 Vasant Kunj to STP Vasant Kunj under EE(South)-I. (Re-invited)
GI pipe work, MS work, PVC water tank replacement and other associated civil works
Strengthening of gravity duct wall by making retaining wall providing support under the pulliya near Okhla mandi of carrying out fall of rising main Kilokari/Ring Road/Andrews ganj/Pragati vihar SPS
Providing and laying sewer rising main by 200 mm dia MS pipe from Pitampura Village Trolley to Main sewer line near Fruit Market in AC-16, Tri Nagar under EE (NW) III.
Rejuvenation of Naini Lake, Model Town, KPZ. S/Head Providing of consultancy for design and drawing of rising main, sump well, RCC drain and re-designing of existing toilet at Naini Lake.
Providing, laying and jointing treated effluent water rising main including installation of pump sets and allied works from Keshopur STP for rejuvenation of Paschim Vihar Lake in DDA District Parks. (RE-INVITE)
PROVN OF SEPARATE PIPE LINE FROM NARAINA PUMP HOUSE TO NARAINA BAGH AND CONNECTED WATER SUPPLY WORK AT PALAM BAGH AND SEWAGE EVACUATION AND TREATED WATER SUPPLY PIPE LINE NETWORK FROM NARAINA BAGH STP TO MH LINE WITH CONNECTED WORK
Restoration of damaged treated effluent pipe line of Vasant Kunj S.T.P, Sector-B, near Bio-diversity park.
Renovation/ strengthening of MS pipe line of set No. 6 with other allied works at EPH Okhla.
Repair and maintenance of water supply pipe line in various DDA housing pockets in Sector 18, Dwarka.
Construction of sump well and providing and laying M.S. Pipe line at back lane, Purana Quila Road.
Running, Operation, and Comprehensive Maintenance of Medical Gas Pipe Line System installed at RGSS Hospital, Tahirpur, Delhi
Repair of underground water storage tank and pump house, including GI pipeline, Wall tiles, Kota stone and other repair works at the Department of Social Sciences, University of Delhi
RMO Steam Boiler No. 1, 2 and 3 at L.N. Hospital, New Delhi. (SH- Repairing and replacement of distribution header steam pipeline and accessories in Gyane emergency operation theater)
Operation and Maintenance of various Toilet blocks in NDMC Area SH Providing and Laying GI Pipeline for Water Connection of PTU 14 001 at Bhagwan Dass Road New Delhi
Provision of dedicated pneumatic pipeline for pneumatic valve testing and Overhauling with other facilities for pneumatic section development in workshop area at Vinod Nagar and Mukundpur Depot, DMRC Ltd.
Supply, Erection and Commissioning of Security Air pipeline for MVWS system of all the Deluge valves and Air Drier for security air compressors at Delhi Bottling Plant, New Delhi
REPAIR/REPLACEMENT TO PIPELINE AND PUMPS, MOTORS, DG SETS AND MISC WORKS AT KHANPUR, DUNDAHERA AND MANESAR ARMY CAMP UNDER AGE E/M OF GE (SOUTH) DELHI CANTT-10