Loading…
Loading…
5,279 results • Best match
SOLONOID SWITCH, AIR DRYER AND COOLER PIPE LINE, COVER ASSY, TAPPER ROLLER BEARING, FILTER ASSY OIL, FILTER ASSY FUEL, WIPER ARM SUPPORT RIGHT, WIPER ARM SUPPORT LEFT, PNEUMATIC PIPE, BODY ASSY THROTTLE, DRIVE ASSY, CMC ASSY, SOLONOID, COMBINATION SWITCH
MG Cover assy clutch, MG Disc clutch, MG Bearing wheel, MG Lock assy gate side rear, Army Bus Assy Housing block, Army Bus Arm set, RE Brake light switch assy, STLN Lifting pump pipe line BOQ Title BOQ TSS
PROVIDING AND FIXING NEW MACHINERY CONTROL PANNEL BOARD REPAIR OF PUMP CHAMBER OHSR AND WATER WORKS NEW HOUSE CONNECTION AUTOMATED WATER CONTROLER CHLORONITOR P and L PIPE LINE P and F SLUICE VALVE HAUDI AND PAINTING OF SIGN BOARD
Providing and Fixing of Chlorination Plant Repair of Water Controller Repair of Pump Chamber Repair of OHSR Repair of Water Works Water Connections on Existing Pipe line Cost of Painting of Sign. Board and Other Work contingent there to
Piston Ring Set, Air Filter Assy, Spark Plug, Chock Cable, Compression Gasket, Fuel Pipe Line, Fuel On off Cock, Overhaul Gasket, Piston, Connecting Rod, Gaugeon Pin, Crank Shaft, Exhaust Valve, Inlet Valve, Ignition Coil, Bulb 500 Watt for Aska Light
Reverse Light Switch, Wiper Blade Rear 330, Wiper Blade Front Driver, Wiper Blade CO Driver, Oil Seal, Circuit Breaker Bty Cut Off Switch, Control Unit, Air Pipe Line, Master Cyl Power unit Clutch Master Cyl, AC Compressor, Armature Shaft, Diode
Providing and laying jointing fixing testing ISI Marked GI Pipe PVC Pipes Dismantling brick Dismantling of cement concrete 80mm thick cement concrete Sluice Valves Chamber Water Connection on New Proposed PVC Pipe Line and O M for 3 Months complete
Boring and Installing 200 mm id depth 140 mtr BGL with Reverse Rotatry Rig rig Construction of Pump Chamber Prov and installing Submersible Pumping set Solar Panel Energy system Construction of RCC OHSR 50cum cap Prov Laying of PVC pipe Line
PROVIDING AND INSTALLING NEW MACHINERY CONTROL PANNEL BOARD REPAIR OF PUMP CHAMBER OHSR AND WATER WORKS NEW HOUSE CONNECTION AUTOMATED WATER CONTROLER CHLORONITOR P and L PIPE LINE P and F SLUICE VALVE HAUDI AND PAINTING OF SIGN BOARD ETC
Prov. House Connection for existing and new Pipe Line Prov. Laying jointing testing PVC pipe for Distribution System S V Chamber Repair of Pumping Machinery Pump Chamber OHSR Prov. Installing Control Panel and All other works Complete in all respect
Construction of Pump Chamber size 2.50 2.50 mtr Providing and installing Submersible Pumping set Solar Panel Energy System Construction of One No. RCC OHSR 75000 ltrs capacity having height 22.00 mtr up to FSL Development of WW site and pipe line
Providing and Laying Pipe Line for Distribution House Hold Connections with Water Meter Chlorination Pumping Machinery Repair of Pump Chamber Repair of Head works O and M for 3 months complete in all respects and other work contingent there to
NK00311 AIR COMPRESSOR GASKET, 155 05 885 GASKET, 172 2M 31 046 1 GASKET, 172 47 121 GASKET, 172 46 057 1 GASKET DELIVERY PUMP, 172 47 039 2 GASKET, CQA HV 5 31 014 HOSE CONNECTION, 172 32 185SB HOSE, CQA HV 5 34 000 HOSE, CQA HV 5 32 049 HOSE ... 000 PIPE LINE ASSY, ... 4720720261760 PIPE LINE ASSY, ...
DIRECTION CONTROL VALVE SOLENOID ASSY, FORWARD REVERSE SELECTOR SWITCH, FRONT AXLE HUB SEAL, BENJO BOLT 19MM, BENJO WASHER, O RING, HYDRAULIC PIPE LINE, FUEL RETURN PIPE LINE, JACK CYLINDER SEAL KIT, HYDRAULIC TANK STRAINER, GEAR CHANGE LEVER KEY, CLUTCH STRAINER, PIN PIVOT, HOSE ADOPTER, ADHESIVE LOCTITE 5182, HEATER AIR INTAKE 24 VOLT, THERMOSTAT VALVE, HOSE 495MM X 55MM, CLAMP HOSE, HOSE 3 POINT 4 FEET BSP UHP 2150MM, KEY 12 VOLT, SWITCH COLUMN MANUAL, KIT SPIDER, TOOTH BUCKET, SIDE CUTTER LEFT HAND, SIDE CUTTER RIGHT HAND, WHEEL BOLT, BEARING LINER
CQA HV 5 32 037 HOSE CONNECTION, CQA HV 5 31 014 HOSE CONNECTION, CQA HV 5 34 000 HOSE CONNECTION, CQA HV 5 66 025 PIPE LINE ASSY, CQA HV 5 66 000 PIPE LINE ASSY, CQA HV 507 732E HOSE FROM OIL PUMP TO CENTRIFUGAL OIL, 54 12 13SB SEAL AND SPRING SET ... 006 PIPE LINE ASSY, ...
Repair of OHSR , Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes and all other works as per DNIT.
Repair of OHSR, Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes, and all other works as per approved DNIT
Repair of OHSR, Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes, and all other works as per DNIT
Repair of OHSR, Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes
Boring and Installing 250 200 mm id tubewell with Reverse Rotatry Rig upto 170 mtr. Depth with REVERSE Rotary Construction of Pump Chamber Construction of One No. RCC OHSR 150000 ltrs capacity PVC pipe Line and all other works contingent there to
Repair of OHSR, Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes and all other works as per Approved DNIT
DESIGN, ENGINEERING, SUPPLY, ERECTION, INSTALLATION, COMMISSIONING OF LPG PUMP HOUSE SHED WITH ALL ALLIED FACILITY LIKE SPRINKLER SYSTEM, STRUCTURE, ROOF, WATER LINE ETC. AND 150M3/HR PUMP INSTALLATION WITH PIPELINES AND OTHER FITTINGS AT NABHA BP
SOLENOID SWITCH, HEAD LAMP ASSY, BRANCH PIPE, AIR PIPELINE, DUST SEAL EQPT 141 AND ABOVE, PIPE OF LEFT HAND CYLINDER
UPGRADATION OF OLD VINTAGE CI/GI PIPELINE SLUICE VALVE PUMP SET AND CONNECTED ACCESSORIES AT PATHANKOT UNDER GE SOUTH PATHANKOT
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 450 mm Dia RCC Pipes
Heavy repair and replacement of doors and windows and Repair to corroded water supply pipeline & Cleaning of Jungle/Grass/Bushes wood/Sapling etc. from sides of approach roads and nearest staff quarter in colony no.1 to 4 at FZR and Repair and maintenance of Community hall at FZR in the jurisdiction of SSE/W/FZR under ADEN-1/FZR.
Certain repair/replacement of CI/GI pumping gravity and distribution pipelines including attending breakdowns/day to day complaints, Repair/maint of DG Sets, capacitor panels and connected switch gear, STPs and misc E/M installations and tubewell
CERTAIN REPAIR MAINT OF CRANES AND FIRE FIGHTING MAINT CLEANING OF OHT WATER LEVEL INDICATORS MOTOR CONTROL PANEL TUBEWELL PUMPSTETS STARTER PANEL MOTOR CI GI PUMPING GRAVITY AND DISTRIBUTION PIPELINES INCLUDING ATTENDING BREAKDOWNS DAY TO DAY COMP
Inlet Pipe for Raw water RCC Storage and Sedimentation Tank of size 48.10 mtr x 40.00mtr Suction Cum Scour Well for Raw Water Pressure Sand Filter 20 cum SS Well for Clear Water RCC Clear Water Tank Pipe line at Head Works Site Laying
Installing of 200 mm id with 110 mtr depth straight tubewell drilling of 500 mm of suitable size with Reverse rotary Method, but when Stony/boulder strata appear, then other method ie Direct rotary etc. are used RCC OHSR 75000 ltr capacity, pipe line
REPAIR OF STORAGE AND SEDIMENTATION TANK OF SIZE 65X44.50X2.0 M, REPAIR OF PUMP CHAMBER 6.10 X 4.88 M, REPAIR OF EXISTING OHSR 150 KL, PROVISION OF BOUNDRY WALL, PIPE LINE AT HEAD WORKS, REPAIR OF FILTER BED DIA 8.95 MTR (3 NOS), REPAIR OF DISTRIBUTI
HOSE RPTU 1271 50 27 38, UNION PIPE TO HOSE, RUBBER BELLOWS, CONNECTING HOSE 6300MM, CLUTCH BOOSTER REP KIT, REP KIT FOR MAIN CLUTCH CYL, PARTS KIT HYDRAULIC PUMP, REP KIT IN PACKING, RING SEAL HOSE, PIPE LINE HOSE, ENGINE STOP CABLE, CABLE TECHOMETER
construction of tubewell providing laying jointing excavation of trenches with backfilling of pipeline system complete and installation of solar system etc
Laying of Underground pipelines of 250 mm and 300 mm dia RCC Pipes at Villages Pandori Shekhan, Sindhar, Diwali, Jamalpur of District Jalandhar and Village Fattowal of District Kapurthala and Installation of RTRWH Systems at GPS, Saidupur, Jalandhar
Repair of OHSR, Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes and all other works as per approved DNIT
Repair of OHSR, Repair of Pump Chamber, Providing laying , Stringing , Jointing, cutting and testing of PVC Pipes and all other works as per approved DNIT
Providing Improved Access to Water through Household Connections/ Pipeline Water Supply Scheme Mattewara, Block Ludhiana-2 Distt. Ludhiana. Under 15th Finance Commission
CS seamless pipe ASTM A106 Gr B 150 NB SCH 80, CS seamless pipeline ASTM A106 Gr B 20 NB SCH 80
Hose 765 05 Sb311, Pipe Assy 765 84 Sb233, Branch Pipe 765 05 726, Ring 765 08 928, Gasket 765 10 1648, Gasket 765 17 427, Hose Connection CQA HV 5 32 037, Bolt 172 35 015, Pin 172 04 484, Pipe Line 188 60 022Sb
as per title
Custom Bid for Services - WELDING OF PIPESALL DIA, Custom Bid for Services - MISC WELDING ARCSTRUCTURESPIPELINE, Custom Bid for Services - REPAINTING OF PIPELINE, Custom Bid for Services - SUP FAB OF STR STEELEREC ALIGN WLDG, Custom Bid for Services ... WRAPPING PIPELINE , ...
CONSTRUCITON OF UGSR, PUMP CHAMBER, MACHINERY AND LAYING OF DI PIPELINE FOR PROVIDING WATER SUPPLY TO BABA JIWAN SINGH NAGAR, FEROZEPUR ROAD, FARIDKOT
172-32-158SB ELEMENT FILTER, 175-32-031SB PUMP OIL PRIMING MODEL MZN-2, 175-66-011SB-2 PIPE LINE ASSY, 4720015058 HOSE CONNECTION 188-31-067SB-1, 188-32- 017-SB-1 HOSE CONNECTION, 155-38-127SB 2 EK-48 ELECTRO PNEUMATIC VLAVE, 4720-015059 HOSE CONNECTION
Lining of water Course of O/L RD 11000 TR of Shampura Minor by laying of U/G pipeline of Shamaspura Distt Fatehgarh Sahib
Lining of water Course of O/L RD 11000 TL of Amrala Minor by laying of U/G pipeline of Amrala Distt Fatehgarh Sahib
SUPPLY, FABRICATION, INSTALL, TESTING AND COMMISSIONING OF SEAMLESS SCHEDULE 80 PIPELINE, 3 WAY VALVE AND ALLIED VALVES WITH 300 CLASS FITTINGS AT NABHA BP
P/L LAYING INTERLOCKING PVC PIPELINE AND C/O R/G CHAMBERS FOR DISPOSAL OF STORM WATER AT VARIOUS PARTS OF THE CITY SANGRUR
Lining of water Course of O/L RD 11000 TR of Amrala Minor by laying of U/G pipeline of Amrala Distt Fatehgarh Sahib
piston assy, set piston ring, exhaust valve, inlet valve, bearing half upper normal, rubber hose uc pipe to egr cooler, condensor fan, assy outer handle rhgear fly wheel ring, gear fly wheel ring, clutch release bearing, oil seal crank shaft, head ... return pipe line
laying,jointing,excavation of trenches with backfilling of pipeline system complete alongwith the installation of solar system and also included the construction of tube well