Loading…
Loading…
2,032 live1,039 closing this weekmost from PHE and E-IN-C BRANCH - MILITARY ENGINEER SERVICES
2,032 results • Best match
Annual maintenance work of water supply system and Sanitary system of Main Building under Directorate of Commercial Taxes at 14 Beliaghata Road Kolkata 15 during the year 2026 27 Sanitary and Plumbing works
Upgradation of East Jogendranagar UPHC during the year 2026-27 S.H.Establishment of Polyclinic Services through Civil works, false ceiling, internal walling with ACP sheet, water supply works, minor internal electrification works and branding etc.
Providing Permanent Water Supply And FHTCs To Housing Layout MSR Street (054201LA111227) Habitation Of Kavitam G.P In Poduru Mandal Of Achanta Constituency In West Godavari District - Est. Cost: 9.49/9.28 Lakhs (Part-B Only)
Annual maintenance work of water supply system and Sanitary system of Annex III Building under Directorate of Commercial Taxes at 14 Beliaghata Road Kolkata 15 during the year 2026 27 Sanitary and Plumbing works
Annual maintenance work of water supply system and Sanitary system of Annex II Building under Directorate of Commercial Taxes at 14 Beliaghata Road Kolkata 15 during the year 2026 27 Sanitary and Plumbing works
Annual maintenance work of water supply system and Sanitary system of Annex I Building under Directorate of Commercial Taxes at 14 Beliaghata Road Kolkata 15 during the year 2026 27 Sanitary and Plumbing works
Vitreous China Sanitary Appliances – Squatting Pans conforming to IS 2556 (Part 3) (Q3), Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3), (Vitreous China) - Washdown Water Closets as per IS 2556 (Q3)
As specified in BOQ and Tender Documents
Providing 2 Nos of Junction Work on 500mm dia Outlet from 4ML Deepthisrinagar Reservoir for improvement of water supply to avoid online supplies under Deepthisrinagar Ward, Miyapur Circle, O and M Division No.XX, Serilingampally Zone.
Ishapur Kheri- DNIT for laying of D.I. Pipeline and repair of 2 Nos. existing boosting station to improve the water supply in Village Ishapur Kheri Tehsil Gohana Distt. Sonipat and all other works contingent thereto
Providing Service Contract for Assisting the Section Officers for the work of Construction of 10 Classroom, 1 Boys toilet, 1 Girls toilet building, Compound wall and Drinking Water supply arrangements in Govt. High School at
Providing running and maintenance of inspection vehicle for Govt duty of Assistant Engineer, Ranchi Project Sub Division IV, CPWD, Hinoo, Ranchi. CH. To:- Construction of A Type (two sections) school building (G2), 4 nos. Type-II Qtrs (G1), 4 nos ... Internal water supply , ...
RESTORATION OF I.P PASSAGES AT RAMJOYSIL LANE, JADU PANDIT ROAD AND REPAIRING OF PAVER BLOCK FOOTPATH AT BEADON STREET AND OTHERS IN WARD NO 18 DISTURBED BY CESC, WATER SUPPLY DEPTT AND NATURAL WEAR AND TEAR
Construction of newly carved out parking in Sector-5 Gurugram. Consturction of parking M-10, grade RMC, 80mm thick interlocking paver with ker and channel GSB, 100mm water supply line and all other works contingent thereto.
REPAIR REPLACEMENT OF SANITARY FITTING INTERNAL WATER SUPPLY FLOORING JOINERIES AND REPAIR MAINT TO INTERLOCKING TILES CHEQUERED TILES, PCC PATH, SECURITY FENCING AND CAMOUFLAGE PAINTING WRK IN CERTAIN BLDG AT AFS ARJANGARH UNDER GE (AF) GURGAON
REPAIR REPLACEMENT OF SANITARY FITTING INTERNAL WATER SUPPLY FLOORING JOINERIES AND REPAIR/MAINT TO INTERLOCKING TILES/CHEQUERED TILES, PCC PATH, SECURITY FENCING AND CAMOUFLAGE PAINTING WORK IN CERTAIN BUILDING AT AFS RAJOKRI UNDER GE (AF) GURGAON
AMtc of EPHS in Sec 7 Kurukshetra Providing and Laying of DI specials Repair of water supply and Leakage DI Pipe 100mm dia and CID Joints complete in all respect and all other works contingent thereto
Tajewala Village Providing and Installing 1 No. Tubewell against failure T/Well at Spolion Bans and Laying of Water Supply Pipe Line at Village Tajewala, Block Partap Nagar, Distt. Yamuna Nagar Demand received in Jan Sanvaad
EEC/Dn/Latur/T-57/2026-27
Relaying of damaged sewer line, water supply line, cleaning of sewer line, repair and mtc of public utility services, Construction of RMC parking and central verge, Beautification of entry points etc. in Transport Nagar, Sec-58, Fbd.
AMC to different quarters of Suri irrigation colony for various repairing works including wood work water supply pipeline and cleaning of campus drains in suri irrigation colony under Tilpara Barrage Sub-Division of Mayurakshi Head Quaters Division
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 2 (Two) nos 25 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at KADIRPUR Water Supply Schem
Work Of Providing, Laying, Jointing, Testing and Commissioning of Pipeline for Drinking Water Supply in Municipal Area of Baswa, District Dausa including 05 year O and M after completion of one year defect liability period, Under BA
Infrastructure development works i/c Roads, R.C.C. drain Hume Pipe Culverts, water supply system, Street light, Shed works, Shopping Complex & Building works for Proposed New Industrial area at village- Kosmanda, Block Palari District- Baloda Bazar BhataPara (C.G.).
HDPE pipeline, 2 nos Horizontal Tubewell, 100 cum CWR, High lift pump house, Guard room, Boundary wall under Barjora water supply (left out mouza Z- II) of Barjora block, BRGF Phase-I project under Bankura Division, PHE Dte.
The main provisions included in the estimate are cutting and cleaning the areas where growth of grass is high cutting the overhanging branches of trees engaging plumbers for repairing the damaged water supply and sanitary lines etc complete
AMtc of EPHS in Sector 13 Urban Estate Kurukshetra Repair of Water supply line and leakage Providing and fixing of Dl pipe Clamp specials CID Joints various sizes complete in all respect and all other works contingent thereto
PROVIDING AND LAYING WATER SUPPLY PIPELINE 100 MM (DI) K-7 and 150MM (DI) K-9 PIPE INCLUDING DRILLING OF TUBEWELLS, CONSTRUTION OF 3 NO. U.G.T. AND PUMPING MACHINERY FOR TAURU TOWN, DISTRICT NUH, HARYANA(UNDER AMRUT 2.0)
REPAIR/ RENEWAL OF WATER SUPPLY LINES INCLUDING CLEANING OF UNDER GROUND RESERVOIRS and PVC / RCC SERVICE TANKS AND REPAIR / MAINTENANCE OF PUMPING SETS, PUMP STARTER PANELS, REPAIR MAINT OF TREATMENT PLANT AT BSA COMPLEX AND GOKHALE ROAD COMPLEX UND
Annual running, operation and maintenance of all the E and M services such as internal electrification work of all common area, lifts, clear water supply system, firefighting system, fire detection and alarm system and D.G. Sets for emergency service
Repair of damaged sewer line, storm water drain,water supply system in block no.30,31,32 and 37 to 40 & repair of CHI Office, staff tool room at PB railway colony and Repair of damaged Bituminous road surface, Sewerline and restoration of road side footpaths, strengthening of colony boundary wall & fencing work in punjabi bagh,Dayabasti and RPF line to enhance safety, security and structural stability and Urgent repair to damaged workshop shed sheeting,valley gutters rainwater pipes and corroded steel members at EWS (Electric work shop) DBSI in the section of S/O SSE/W/PB under ADEN/E-IV.
Electrical work in connection with Provision of First foot over bridge with cover shed at 5 Station of N.E.Railaway LJN Div, Provision of essential items for Goods shed like Tarpaulin , Major Improvement work like Extension of PF No. 02 & water supply...
Improvement of water supply by P/L 100 mm dia water line from H.no C-14 to C-39 in C- Block Sawan park,Phase-3 , Ashok Vihar in Ward 66(Wazirpur) in Wazirpur Constituency AC-17 Under EE(C )-18.
DEPOSIT Work Improving water supply to Kannanthodath road by changing the tapping point from100mm AC pipe to 300mm CI pipe and laying 160mm 6kgper cm2 PVC pipe across Aluva Ernakulam road in Div 34 old 38 new of Kochi Corporation Pipeline
Improvement of water supply at nala par basti online Booster by providing 200 mm dia. M.S. water line from Bharam Puri flyover to Nala Par basti online booster under Dwarka constituency AC-33 under EE(C)-25. (Re-invited 1st Time)
Construction of 2 storied switch room slope roof (3.6 x 3.0m) with water supply and sanitary arrangement including construction of boundary wall around 4th t.well site of Ajangachi PWSS of Amta-II block under Uluberia sub-division under Howrah div.
Construction of 50 Bedded New Residential Hostel (Female) Building & Furnishing work I/c Water Supply, Sanitary Fittings, Septic Tank, Rain water Harvesting, Land Scapping & Electrification work at DIET College Achhoti, Distt.- Durg C.G.) (Deposit Work) (Deposit work- without escalation and bonus)
Water supply works involving the installation of a motor and piping in Ward No. 01, extending from the Podium Joga house to the Mausam Buchcha house.,Pipeline extension work in Ward No. 01, from Kwasi Somnath's house to Rakesh Sori's house.
CONSTRUCTION OF 2NO GENERAL TOILET, BOREWELL AND WATER SUPPLY WORK AT MAIN MANDI YARD KOTA AND CONSTRUCTION OF SAMUDAYIK BHAWAN IN VILLAGE DHANRAS, SARGODA, LUFA AND IN VILLAGE PIPARPARA IN GRAM PANCHAYAT BAHETARAGUDA IN MANDI SAMITI AREA KOTA DISTT-BILASPUR
REPAIRING OF BITUMINOUS ROAD DISTURBED BY WATER SUPPLY DEPARTMENT (KMC) 2F, TILJALA LANE, AT 36 TO 49 JHAWTALA ROAD, 42, PALM AVENUE, 24 TO 26, KUSTIA ROAD, 32, TMB LANE AND 37, BONDEL ROAD AND ITS SURROUNDING AREA IN W/65
Construction of RWHS 1 Check Dam of height 2.00 mtr on Kunah Khad near LWSS Tillu Jalari
Potable Water Supply Pipe Laying and Interconnection Work At S B Roychowdhury Road Opposite To Kali Mandir Ward No 08,Nrayanpally School Road Near Durga Mandap Ward No 23 an Bisharpara Nabajiban Near Kali Mandir Ward No 01 Under North Dum Dum Municip
Upgradation C.C. Road from (i) H/O Bijoy Mondal to Rekha Moni Sarkar (ii) H/O Rekha Moni Sarkar to Biswakarma Sarkar (iii) Radha Rani Water supply to CC Road (iv) Sujon to Sandip Lohar in ward no-16 under Bolpur Municipality.
Imp of Water Supply by Replacement of damaged portion damaged Water Connections M Block, F Block, KG-I AG-I and C Block Societies in Ward No. 107 in Vikas Puri Constituency AC-31 under EE(C)-22 Re-invited 1st Time
CERTAIN REPAIR AND REPLACEMENT TO CENTRAL HEATING PLANTS PART AND PPR PIPE LINES INSULATION, GLYCOL, HOT WATER SUPPLY AT FAD, IDSR, CMIR, B MESS AND CHS STATION KLP BLDG AND REPAIR / MAINT OF CALORIFIER AND BOILER AT TRANSIT CAMP UNDER GE 860 EWS
providing water supply distribution pipelines from a near dhobhi Ghat Strom Water Drain Culvert in Ward No28 to near Donka Road culvert in Ward No27b to Makkina Samson Raju housein Lenin Nagar WardNo2 under 15th FCADP Tied Grant of 2025to26 1st instalment
PROVIDING AND LAYING WATER SUPPLY PIPE LINE 100 MM (DI) K-7 and 150MM, 200MM and 250MM (DI) K-9 PIPE INCLUDING DRILLING OF TUBEWELLS, CONSTRUTION OF 4 NO. U.G.T. AND PUMPING MACHINERY FOR NUH TOWN, DISTRICT NUH, HARYANA (UNDER AMRUT 2.0)
PROVIDING AND LAYING WATER SUPPLY PIPE LINE 100 MM (DI) K-7 and 150MM, 200MM, 250MM (DI) K-9 PIPE INCLUDING DRILLING OF TUBEWELLS, CONSTRUTION OF 2 NO. U.G.T. AND PUMPING MACHINERY FOR FIROJPUR JHIRKA TOWN, DISTRICT NUH, HARYANA (UNDER AMRUT 2.0)
Construction of 456 boys hostel block vertical extension of girls hostel for 2 floors common amenities center Type III Quarters 22 nos Type IV Quarters 48 nos 300 seater semi permanent dining block indoor sports complex and development works and bulk ... external water supply line ...
Repair and maintenance of water supply system by repairing of water line leakages upto 300mm dia. DI/CI/MS, repairing of damaged water connections, removal of water contamination in ward no. 32 in Mundka AC-08 under EE(C)-35/SE(C)-03. (Re-invited)