Loading…
Loading…
5,257 results • Best match
Construction of source Sump CWR laying jointing and testing of GI pipe line SITC of solar pumping unit and providing remaining FHTC and other appurtenant works in Kyark Solar Pumping water supply scheme along with handing over the works under JJM
Supply of all material Laying and Jointing of Pipe Line House Hold connection and its appurtenance Works at Khajuri Block Bhagwanpur Water Supply Scheme Retrofitting on item rate contact basis including supply of all materials labor and T and P et
Supply of all material Laying and Jointing of Pipe Line House Hold connection and its appurtenance Works at jainpur jhanjhedi Block Narsa Water Supply Scheme Retrofitting on item rate contact basis including supply of all materials labor and T and
Tender for construction of source CWR laying jointing and testing of GI pipe line providing FHTC and other appurtenant works in Badeth Birsoda water supply scheme along with handing over the works after commissioning to maintenance agency under Jal J
CONSTRUCTION OF BUNGA FARTYAL/ BURCHAURA (Retro) WATER SUPPLY SCHEME
Construction of source, CWR laying, jointing and testing of GI pipe line, providing FHTC and other appurtenant works in GAUCHENA CHORUDANDA water supply scheme Phase-II along with handing over the work after commissioning to maintenance agency under
Tender for construction Supply, Cartage laying Jointing of GI(M) 15mm to 65mm dia,RCC CWR 12.5 KL 17.5 KL Capacity, Source and treatment works under Kartiya retrofitting Water Supply Scheme in Block Rikhnikhal works after commissioning to maintenanc
Tender for construction Supply, Cartage laying Jointing of GI(M) 15mm to 65mm dia,RCC CWR22.5 KL Capacity, Source and treatment works under Takolikhal reorganisation Water Supply Scheme in Block Rikhnikhal along with handing over the works after co
Provision of FHTC in Households and other appurtunent works under Kanda GOV pumping Zone 2 water supply scheme Maswadi Walna Tallakhuna Saiezer Kaliyabagad Falyati Goginapani Kalna Mankote Chaati of Block Bageshwar in District Bageshwar
Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising Main (DI Pipe), Over Head Tank, Pump House, Distribution system (DI Pipe, K-7), Tubewell and all other appurtenant works etc. complete
Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising Main (DI Pipe), Over Head Tank, Pump House with attendant Room and all other appurtenant works
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Distribution system HDPE Pipe Functional House Hold Tap Connection FHTC Pump House cum attendant Room Boundary wall and
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Pump House cum attendent Room Boundary wall and all other appurtenant works etc complete
Siroliwater supply scheme bironkhal block Under Pauri Division
Girgaonwater supply scheme Pauri Block Under Pauri Divison
Supplying carting laying and jointing of Distribution system HDPE Pipe FHTC and all other appurtenant works
Surveying designed supply and laying and jointing of different Size of MSERW GI pipe in Gravity main and GI Pipe line work in distribution system Construction of 5 Nos RCC CWRs of 10KL to 60 KL and other appurtenant works
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Distribution system HDPE Pipe Functional House Hold Tap Connection FHTC Pump House cum attendant Room Boundary wall and
CONSTRUCTION 250 M DEEP TUBE WELL PUMP HOUSE 300 KL RCC OVERHEAD TANK WITH 18 M STAGING RISING MAIN CONNECTING MAIN and OTHER APPURTENANT WORKS
Supply Installation Testing Commissioning maintenance and handing over to maintenance body of works consisting of Pumping Plants Electric Transformers Automation of pumping plant and all other E and M Appurtenant works
Design and Construction of works consisting of Supplying carting laying and jointing of Distribution system HDPE Pipe and all other appurtenant works etc complete
Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising Main (DI Pipe), Over Head Tank, Pump House with attendant Room, Distribution system (HDPE Pipe) and all other appurtenant works etc. complete
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Distribution system HDPE Pipe Functional House Hold Tap Connection FHTC Pump House cum attendant Room Boundary wall and
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Pump House cum attendent Room Boundary wall and all other appurtenant works etc complete
Supply, installation, Testing, Commissioning of Pumping Plants and all other E n M Appurtenant works including Survey, Design , Checking of designs of pumping plants etc. complete.
Kurkhiyalwater supply scheme Ekeshwar block Under Pauri Division Division
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Distribution system HDPE Pipe Functional House Hold Tap Connection FHTC Pump House cum attendant Room Boundary wall and
Design and Construction of works consisting of supplying, carting, laying and jointing of Distribution system (HDPE Pipe) and all other appurtenant works etc.
Supplying carting laying and jointing of Distribution system HDPE Pipe FHTC and all other appurtenant works
Survey, Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising main (DI K-9), OHT, Pump House Distribution system (DI K-7 Pipes), Construction of Deep Tubewell, Pumping Plant, House Service Connection and all
Bedulgaonwater supply scheme Kaljikhal block Under Pauri Division
Construction of OHT laying and jointing of different size of HDPE pipe line in Distribution System and DI K9 DI K7 in GI Medium pipe line in Rising Main and other appurtenant works for JHAJRA WATER SUPPLY SCHEME Block Sahaspur, District Dehradun
Construction of JAWARI ROTHIYA GOV Water Supply Scheme of Block JAKHOLI from Laster River consisting of 01 No Setteling Tank 1No Slow Sand Filter Supply Main 2 No type I staff Quarter and 20 No RCC CWR at Different locations Distribution system
Retrofitting works in village Danpau under Danpau Water Supply Scheme
Construction of source, CWR laying, jointing and testing of GI pipe line, providing FHTC and other appurtenant works in Vargaddi GOV Reorg water supply scheme Phase-II along with handing over the work after commissioning to maintenance agency under j
Construction of source, CWR laying, jointing and testing of GI pipe line, providing FHTC and other appurtenant works in Simalna Bichla Solar Pumping water supply scheme Phase-II along with handing over the work after commissioning to maintenance agen
Construction Testing and Commissioning of Kashipur Water Supply Scheme Zone 8 for Ward No 6 Tanda Ujjain P and Ward No 8 Laxmipur Patti P 1050 Kl 21m Staging OHT DI K9 Rising main DI K7 distribution system Tube Well Pump House and House
Design and Construction of works consisting of Supplying, carting, laying and jointing of Rising Main (DI Pipe), Over Head Tank, Pump House, Distribution system (DI Pipe, K-7) and all other appurtenant works etc. complete as specified in BOQ
Construction of 200 mm dia 150 mtr deep Tubewell and Supply Installation Testing Commissioning of Solar Powered Water Pumping System consisting of solar submersible pumping system capable to deliver the 250LPM discharge clear water against 70Mts Head
Survey Design and Construction of works consisting of supplying carting laying and jointing of Rising Main DI Pipe Over Head Tank Pump House cum attendent Room Boundary wall and all other appurtenant works etc complete
Construction of source work gravity main clear water reservoir distribution system and appurtenant works
Construction of source work gravity main clear water reservoir distribution system and appurtenant works
Supply carting Laying of GI Medium pipe of 15 to 65 mm dia in gravity main distribution Construction of RCC Intake Chamber Storage Resorvoirs appurtenant works etc complete as specied in BOQ of tender document including confirmatry survey
Supplying carting laying and jointing of Distribution system HDPE Pipe FHTC and all other appurtenant works
Supply, installation, Testing, Commissioning of Pumping Plants and all other E n M Appurtenant works including Survey, Design , Checking of designs of pumping plants etc. complete.
Construction of source work gravity main clear water reservoir and appurtenant works
As Per NIT
As Per NIT
Gween Mallawater supply scheme Bironkhal Block Under Pauri Division
As Per NIT