Loading…
Loading…
1,753 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SHIP BORNE; Ro Plant 20 TPD; Service Provider
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7001053 Dated : 14-12-2025 Bid Document 1/8 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 600000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 18000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Talika Development Officer Railway station road, takula panchayat office bhachau -kachchh-370140 (Taluka Development Officer Bhachau)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6511315 Dated : 31-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6555764 Dated : 10-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6555755 Dated : 10-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6889761 Dated : 13-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7108233 Dated : 13-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 12000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/7 Beneficiary : COMPTROLLER Junagadh Agricultural University, Agriculture and Co-operation Department Gujarat, Junagadh Agricultural University, (Jau Fund Acount)
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2), Portable RO Plant For Haemodialysis (Q3) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6556172 Dated : 10-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6734394 Dated : 28-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6841948 Dated : 30-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Potable water purification system Potable Water Purification System ( 1 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis ... Operated Reverse Osmosis based ...
Renovation of sanitary block 30, 31, 32, 33, conversion of room no. 57 and 58 to sanitary block and renovation of room no 6 and 7 of UG college Dhanvantri Mandir Building along with the SITC of 250 LPH RO plant in UG campus of ITRA and Renovation of Kitchen and X rax room at PG campus of ITRA at Jamnagar (Gujarat)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6804918 Dated : 18-10-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 18000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : taluka development officer morbi MORBI, Panchayats and Rural Housing Department Gujarat, N/A, (Vanpariya Jaydip Pravinbhai)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6412418 Dated : 03-07-2025 Bid Document 1/8 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6412262 Dated : 03-07-2025 Bid Document 1/8 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6673874 Dated : 12-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6673852 Dated : 12-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6673883 Dated : 12-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Potable water purification system Average Turn Over of Last 3 Years 3 Lakh (s) Potable Water Purification System ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically ... Operated Reverse Osmosis based ... Operated Reverse Osmosis based ...
Potable water purification system Potable Water Purification System ( 3 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values EQUIPMENT TYPE & FEATURES Type Electrically Operated Reverse Osmosis ... Operated Reverse Osmosis based ...
As per BOQ
Portable RO Plant For Haemodialysis (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6754009 Dated : 06-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 300000 Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : TDO - Singvad TALUKA DEVELOPMENT OFFICE, SINGVAD DISTRICT DAHOD (Taluka Development Officer)
Facility Management Services - LumpSum Based - NPCIL KAPS 3 AND 4; Regular housekeeping of offices and plant buildings outside OPI including maintaining washrooms operation of WTP at KAPP 3 and 4 Kakrapar Gujarat site; Consumables to be provided by s..
As per BOQ
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6677719 Dated : 12-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6562390 Dated : 12-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 45000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Portable RO Plant For Haemodialysis (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6672251 Dated : 11-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Portable RO Plant For Haemodialysis (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6671506 Dated : 11-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Potable water purification system Average Turn Over of Last 3 Years 100 Lakh (s) Experience with Gov. Required 1 Year (s) Potable Water Purification System ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values ... Operated Reverse Osmosis based ...
Book Stoppers, Door Mat, Carpet 5x7, Steel Planters, Flex Boards 10X4, Ice Vending Machine, Curtains 4X6, RO Plant 25 Ltrs Capacity, Focus Lights, Borosil Jug, Water Dispenser
Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2) MSE Exemption for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Exemption for Years Of Experience Yes | Partial | Experience - 1 year (s) Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6772972 Dated : 13-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 20 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : cdho District Panchayat Morbi, Health & Family Welfare Department Gujarat, N/A, (Cdho Morbi) 2/8
As per BOQ
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System, ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; 10 and above; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servi.., Annual Maintenance service-AIR CONDITIONER
C/o 350 bedded (upgradable to 500 beds) ESIC Hospital at Sanand, Gujarat. SH: Planning, Designing and construction of buildings including Internal water supply, Sanitary Installations and drainage, Development works like UG Sumps, Terrace water ... tanks, Water treatment plant , ...
Dustbin Steel, Paper Napkins, Kitchen Tissues, Glass Water Bottle, Bathroom Mirror, Automatic Hand Dryer, Shoe Polish Machine, TV Table wooden, RO Plant 8 Ltrs, Cloth Cotton, Backrest Small, RO Water Plant 25 Ltrs, Trolley SS
Repair and Overhauling Service - Electronic Weighing Systems as per IS 9281 (Part I, Part II, Part III, Part IV); E 364 Undertake service exchange of 02 nos DT Module of Stbd RO plant; No; Buyer Premises
E-tender document for TRANSPORTATION OF TELECOM STORES (More than100Km) IN BSNL WITHIN INDIA WTP, Gujarat Area, Ahmedabad
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Drinking Water Cooler; 5 to 7; PACKAGE-1 : Water purifier and conditioning system maintenance involving basic servicing, ANNUAL MAINTENANCE SERVICES FOR WATER ... System Reverse Osmosis Or ...
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Drinking Water Cooler; 5 to 7; PACKAGE-1 : Water purifier and conditioning system maintenance involving basic servicing, ANNUAL MAINTENANCE SERVICES FOR WATER ... System Reverse Osmosis Or ...
As per BOQ
COMPREHENSIVE REPAIR AND MAINTENANCE OF COOLING APPLIANCES OF HQ SWAC AT VSN GANDHINAGAR AND REPAIR/ MAINT OF RO PLANT, DOSING PUMP AND ALLIED WORKS AT HQ SWAC, SEC-09, SEC-17 GANDHINAGAR AND COMN FLT AHMEDABAD UNDER GE (AF) CHILODA
AIR CONDITIONER SPLIT TYPE 1.5 TON WITH INDOOR AND OUTDOOR UNIT, APPRON FOR FITTER TRADE, APPRON FOR ELECTRICIAN, APPRON FOR COPA TRADE, APPRON FOR WIREMAN TRADE, ABONITE SHEET, RO PLANT SYSTEM 50 LTR INDUSTRIAL BOQ Title BOQ OF MULTIPLE DEMAND ITEM
Construction of 150 Bedded Hospital for ESIC at Kalol, Gandhinagar, Gujarat. SH: Planning, Designing and Construction of Buildings including Internal Water Supply, Sanitary Installation and drainage, Development works like UG Sumps, Terrace water ... tanks, Water Treatment Plant , ...
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; upto 3; PACKAGE-2 : Water purifier and conditioning system maintenance involving basic servicing w.., ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Drinking Water Cooler; upto 3; PACKAGE-1 : Water purifier and conditioning system maintenance involving basic servicing
Autoclave Machine, Generator, Baby Warmer, Standing BP Instruments, Baby Kit, Plastic Water tank, Almirah, Radiant Warmer, Section machine, Dopler, Deep Fridge, Fridge, Domestic Fridge, Injection Tray, Heater, Steel Bench, Cement Bech, Chair and ... Cooler, RO plant , ...
ARMO of Internal EI and Fans pump set lift substation equipment fire fighting and sprinkler system fire alarm system HVAC system CCTV LAN IBMS and EPBAX system in office building for Customs Department at Jamnagar for year 2022-23 Subwork/Packages: ... EXCHANGE RO Plant
Pillow Cover White, Towel Large White, Wall Clock, Water Camper 10 ltr, Water Camper 20 ltr, Toilet Cleaner Brush, Blanket, Bed Sheet White, Double Bed Sheet, Bucket Plastic with Mug, Cloth Drying Stand, Hanger, Soap Case, Water Heating Rod, RO Plant 50 ltr Per Hr Capacity, Tifin Carrier Steel 8 Person, Jute Foot mat for tent 164 x 3 ft Roll, Dustbin Plastic, foot mat, Stive nootan Bhatti, Borosil Glass Set, fire extenguisher 1 kg, Cooler for Vehicle, Knife, Knife set, Tea Patila Alluminium with handle 10 ltr
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2), Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for ... category Reverse Osmosis based ...
Air Pollution Control Engineering English 2nd Edition, Basics of Environmental Studies, Biological Process Design for wastewater treatment, Concepts of Modern Ecology, Design of Water Treatment Plants, Environmental engineering, Environmental Engineering 3rd Edition, Environmental Engineering A design approach, Environmental impact analysis a new dimension in decision making, Environmental Impact Assessment, Handbook of Environmental Impact Assessment Concept and Practice, Environmental Law and Policy in India, Fundamentals of Air Pollution, Fundaments of Industrial safety health, Hazardous waste management handbook Technology perception and reality, Industrial water pollution, Integrated Solid Waste Management Engineering Principles and Management Issues, Introduction to Microbiology, Microbiology, Outline of chemical technology for 21st Century, Remote sensing and GIS, Shreves Chemical process industries, Text book of Ecology, Unit Processes and Organic Synthesis, Wastewater Engineering Including Air Pollution, Wastewater microbiology, Wastewater Sludge Processing, Wastewater Treatment for Pollution Control, Wastewater treatment plants, Water Supply Sewage Systems by 5th Edition, Water Works Engineering Planning Design operation, Wastewater Treatment Technologies, Environmental Engineering Principles and Practices, Air Pollution Control In Industries Vol 1, Theory Selection Design Of Air Pollution Control Equipment Vol 2 Application Of Air Pollution Control Equipment