Loading…
Loading…
2,497 results • Latest
ELECTRICAL WORKS
Electrical Works
Electrical Works
S/R of NH-215 to NH-6 via Madhapur Road such as providing of paver block on the road within Km. 0/983 to 1/252 Km for the year 2025-26.
Comprehensive Maintenance Contract of Medical Gas Pipe Line system at DDMCH, Keonjhar for the year 2025-26.
Provision for Comprehensive Annual Maintainance of Fire Fighting and Alaram System at Centenary Building and MCH Building at DHH Campus, Keonjhar for the year 2024-25.
Construction of New Tahasil Office and Sub-Registrar Office (G plus 3), Cuttack.
Supply and Installation of fire and life safety equipment such as SITC of lightening protection system of different buildings of MDR and TB G plush 2, TB and Chest G plush 2, OPD G plush , Trauma Care G plush , RDC G plush 1, ICU G plush 3,
Supply and Installation of fire and life safety equipment such as SITC of Lightening protection system of different buildings RadiologyRadiolotheraphy and radio Diagnosis G plush 1, Block 13. Rs.58,75,657.00 Bank G plush 1, Old Cancer G plush 1l,
Supply and Installation of fire and life safety equipment such as SITC of lightening protection system of different buildings of IPD G plush and OPD G plush 5 and PM Unit at SDH, Hinjilicut, District Ganjam
Supply and Installation of Fire and life safety equipment such as SITC of lightening protection system of different buildings New IPD Building G plush 5, New OPD G plush 2, Pathology G plush 1, DDC, Admn Building G plush 1, IPHL G plush 1, Kitche
SITC of Fire fighting system at OPD Building of City Hospital at Berhampur
Improvement such as widening and strengthening of internal road Unit 6 Internal road 17 Qr No.VIMR 8 Hospital Square to IVR 276 road from 0.000 Km to 0.946 Km in the District of Khordha under CRDP during 2025-26
Improvement such as widening and strengthening of road from Baramunda High School to NH 5 from 0.000 Km to 0.780 Km in the District of Khordha for the year 2025-26.
Construction of internal road and parking space of MVI Office at Alakar Under RTO, Bhubaneswar II for the year 2025-26.
S/R such as Comprehensive annual Electrical maintenance for wiring and electrical accessories to Old and new circuit house and High court guest house at Gopalpur in the district of Ganjam.
Construction of Need Based Infrastructure of Paddy Procurement Building Centre at Jhipabandha under Jhipabandha Lampcs Kusumi Block in the District ofMayrubhanj for the year 2025-26
Improvement of Chhatibarghat NH-53 to Gohira Chowk (NH-53) road from 0/000 km to 22/891 km in the district of Deogarh under State Plan
Construction of Paddy Procurement Centre at Chakradharaprasad PACs Ltd Bhapur Block in Odisha ( 800 Sqft Cover Pindi)
Repair and Renovation of PWD IB to Kusumi River road for the year 2026-27 (Such as Existing CC Drain cover slab from 0/00km to 0/800 km LHS and CC road Pothole repair)
Repair and Renovation of Khandapada Town Road for 2025-26 (Such as Existing CC Drain cover slab LHS and Pothole repair from 0/000km to 1/250 km)
Repair and Renovation of Forest Check gate to Sai Mandir Road for the year 2026-27 (Such as Existing CC Drain cover slab from 1/197km to 1/258 km)
Improvement such as widening and strengthening of Cuttack-Govindapur-Banki-Simor road from 0/503 km to 5/000 km ( except from 2/480 km to 4/107 km) in the district of Cuttack under State Plan
Improvement of Kuanr-Banspal road from 13/340 Km to 13/835Km such as construction left approach road(Bansapal Hatapada side )near boxcell at ch-13/500km in the district of Keonjhar for the year 2025-26.
Pole Shifting of 11KV line and LT line for Road widening and Strengrhening of NH-49 Thinal Chowk to Marha via Saruali Road from 0/000km to 18/750 km in the Dist. of Deogarh
Improvement of Khuntuni to Mahalaxmipur road (Near Khuntuni Mahalaxmipur) from 0/000 km to 6/566 km in the district of Cuttack under State Plan for the year 2025-26
Improvement of road from Mochi Sahi Chhak to Railway Station via Jhadeswari Temple from 0/240 km to 0/352 km, 0/552 km to 0/640 km, 0/760 km to 1/260 km and from 1/360 km to 1/410 km in the District of Puri under State Plan for the year 2025-26
Improvement of Shree Ram Temple to Helipad via PHD Office and Sadar Block from 0/100 km to 0/250 Km and 0/985 km to 1/451 km in the District of Puri under Sate Plan for the year 2025-26
Improvement such as widening and strengthening of Chandikhole-Nakpol HLC canal road from 0/000 km to 7/889 km in the district of Jajpur under State Plan
Construction of Compound wall around the Mortuary Building and Bio Medical Waste Building of DDMCH for the year 2025-26.
Improvement such as widening and strengthening of road from Buguda - Polosara PWD road to Singhasini via Ch. Sasan upto Ganjam Border (R.D. Deptt.) Saila Dam road (ODR) from 0/000km to 10/000km in the District of Ganjam for the year 2025-26
Construction of 96 Nos. E-type Flat Quarters in 4 Blocks (E1, E2, E3, E4) and 48 Nos. F-type Flat Quarters in 2 Blocks (F1, F2) in the Residential Colony of Raj Bhavan, Bhubaneswar (Stilt plus 6) for 2025-26 on Turnkey Basis.
Construction of College of Nursing at Bhima Bhoi Medical College and Hospital, Balangir.
Improvement such as widening and strengthening of Irrigation Embankment road from NH-16 (Old NH-5) (Gokarneswar) to Budhalingam Majhipada road from 0/000 km to 21/959 km in the district of Jajpur under State Plan
Shifting of Electrical Utilities from Angul-Kalamchuin Road from Town High School to Sandhagali Pragatinagar, Section-I, Pragatinagar to Derjanasahi, Kumanda, Section-3, Ganapati Fly Ash to Kuio, Koshala Section, Angul.
Shifting and Erection of 3ph 3w 11kv, 3p4w LT line and sub-station due to widening and strengthening of Handapa patrapada Road from 0.0km to 20.0 km for the year 2025-26.
Shifting of Electrical Utility due to Widening of Sibida to Khadaka-Kumbharmati Road Via salei, Baradiha from 0/0 to 27/455 Km, of Angul for the year 2025-26
Improvement such as Widening and Strengthening of NH-16 Dadhimachagadia chhaka to Chhatripur road from 0/000 km to 8/114 km in the district of Khordha under State Plan for the year 2025-26
Construction of 02 Nos. of E-type Quarters for Revenue Staff of Bhanjanagar Sub-Collector Office at Bhanjanagar in the District of Ganjam as per Revenue and DM Dept letter No. 19935 dtd. 31.05.2025 Buildings.
Construction and modification of Additional Class room at Pratap Sasan Degree College, Balakati under Balianta Block, Dist-Khordha for the year 2025-26
S/R to Qtr.No. 3RB/28 at Ankuli Such as fixing of GCI Sheet tile flooring etc. completed at Berhampur for the year 2025-26 building