Loading…
Loading…
2,495 results • Latest
Improvement of Singtia-Kuldiha Road from 0.000 Km to 9.617 Km in the District of Mayurbhanj under State Plan for the year 2024-25.
Construction of Postmortem Centre at Raj Kishorenagar of Angul district. (Civil, EI, PH)
Construction of RCC drain with Cover Slab on Chipat Junction to Baripada Baghra Road from 2/260 km to 2/380 km (RHS) for the year 2025-26
Repair and Renovation to D type Tahasildar Quarter at Baripada for the year 2026-27 (Work such as Construction of shed over roof made of G.I. Square pipe framing with Blue scope sheet roofing)
Provision of Supply Installation Testing and Commissioning of Fire Fighting System Automatic Sprinkler Automatic Fire Detection and Alarm System Fire Extinguisher and Signage System of CHC Chandanpur Health Institution of Puri District
Provision of Supply Installation Testing and Commissioning of Fire Fighting System Automatic Sprinkler Automatic Fire Detection and Alarm System Fire Extinguisher and Signage System of CHC Sakhigopal Health Institution of Puri District
Provision of Supply Installation Testing and Commissioning of Fire Fighting System Automatic Sprinkler Automatic Fire Detection and Alarm System Fire Extinguisher and Signage System of CHC Charichhaka Health Institution of Puri District
Provision of Supply Installation Testing and Commissioning of Fire Fighting System Automatic Sprinkler Automatic Fire Detection and Alarm System Fire Extinguisher and Signage System of CHC Nimapara Health Institution of Puri District
Construction of SDVO Building at Puri for 2025-26
supply, installation, testing and commissioning of 82.5 KVA DG (Silent type) with AMF control panel (CPCB IV plus) with other necessary equipments to collectorate Res Office in the District of Puri
Construction of New Sub-Registrar office at Chikiti, Ganjam for the year 2025-26 as per Revenue and DM Dept letter No. 24675 dtd. 07.07.2025 Buildings.
S/R to I.T.I college , pochilima at hinjilicut such as construction of compund wall in premises of boys hostel building
S/R to Kanchuru Ralaba Road such as construction of Hume pipe culvert at Ch. 4/700 km
Construction of 100 Bedded SDH Building at Kuchinda, Sambalpur District.
Improvement such as widening and strengthening of Barilo to Mallipur on Kharasrota Right under Bari Constituency road from 0/000 km to 8/812 km ( except from 2/950 km to 3/155 km and 7/160 km to 7/350 km) in the district of Jajpur under State Plan
S/R to SBR Womens college at Berhampur such as repair and construction of compound wall
Annual repair of DIG office building such as providing ceilling, wall panelling, flush door, inside and outside painting works etc at BAM
Balance Work of Administrative Building for Krishi Vigyan Kendra Office at Golanthara, Berhampur
Improvement of Chitrakonda-Janvai-Papermetta road from 0/000 km to 29/314 km in the district of Malkangiri under State Plan
installation of 100KVA 11 4 KV plinth mounted Kashipur in the District of Rayagada
Installation of 63KVA 11 4KV DP mounted SS and providing power supply to OPD and IPD CHC Kolnara in the District of Rayagada
S/R to Town Police station building at Rayagada
Improvement of Pipilia-Patana road from 0/000 km to 6/000 km in the district of Keonjhar under State Plan
Improvement of Rajpur-Tangarmunda road (ODR) from 0/000 km to 5/995 km in the district of Sundargarh under State Plan
Improvement of Balangir-Chandanbhati road from 0/000 km to 18/000 km in the district of Balangir under State Plan
Construction of 4 Nos. of E-type Residential Staff Quarter for Tahasil, Khallikote in the District of Ganjam for the year 2025-26 (Block A)
S/R to construction of SDVO Office Building at Berhampur
Construction of Entrance gates at K.A.T.S Govt Ayurvedic college and Hospital, Ankuspur Berhampur
Up-gradation and renovation of Urban PHC -1 (Building) under 2nd phase AMA Hospital initiative at Rayagada for the year 2025-26
S/R to DPO building at Rayagada for the year 2025-26
Construction of HL bridge over Local nallah at 20_050 km on Manamunda-Sagada-Gundulia road (ODR) in the District of Boudh under State Plan for the year 2025_26
ELECTRICAL WORKS
Const. of 11 KV Line with 55 mm2 AAAC and Installation of 1X100 KVA 11/0.4 KV DP Mounted Sub-Station for Providing Power Supply to Automobile Workshop at Govt. Polytechnic Building, Ngp for 2025-26
Electrical Works
ELECTRICAL WORKS
Electrical Works