Loading…
Loading…
4,364 results • Latest
MR to Inspection path of Dy 15 of Bishnupur Branch Canal in between Ch 115 and Ch 175 and Ch 210 and Ch 258 Right Bank under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the year 2026 27
Emergent protection work to prevent the bank erosion in the left Bank of River Ganga for a Length of 57.00 m at Gopalpur US Reach-I, Village- Gopalpur, G.P. Gopalpur, Block and P.S.-Manikchak, Dist Malda under Malda Irrigation Division
Annual Maintenance Contract AMC in connection with Manual cleaning of the Trash Racks at intake of VT pumps of 2nd Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
MR to Dy 15 of BBC in between Ch 258.50 to 358.50 for a total length of 3.048 km at Mouza Barakhulia, Sonajhor, Keotdhara, PS and Block Taldangra, Dist Bankura under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the year 2
E/R of S/E damaged due to Purnima Kotal from 31.05.2026 to 03.06.2026 in between 17.680 km to 17.990 km at M/Budhakhali facing R/B of R/Matla in Block-Canning-I, District- (S) 24 Pgs under JID.
Operation of Cross Regulator Gates at Ch. 960.00, Ch. 1032.00and Ch. 1145.00 of MBC and clearance of obstruction at Regulator and fall structures of Distributaries and minor canals under Chandra Section of K.C.Sub-Division- XIV under K.C. Division-IV
E/R of S/E damaged due to one no. ghoge during Amabasya Kotal from 16.05.2026 to 19.05.2026 along the R/B of R/Hogol near Basanti bridge at M/Ramchandrakhali in Block Basanti. P.S. Basanti, Dist. (S) 24 Pgs under JID
Operation of Cross Regulator gate at Ch. 446.00 of MBC and Clearance of obstructions at Regulator and Fall Structures of Dy. 19L of MBC and Minor Canals under Bhimpur Section of K. C. Sub-Div XIV of K. C. Division No-IV Midnapore
Operation of Cross Regulator Gates at Ch.686.00 and Ch.821.00 of MBC and clearance of obstruction and regulating watering through Distributaries viz 20R 21R 22R 27R including its Minor and Sub Minor canals under Bhimpur Section of KCSD xii of KCD-IV
Annual maintenance of Dy. 33R of MBC from Ch. 546.00 to Ch. 646.00 for a length of 3.048 Km within Block- Midnapore, PS Kotwali, Dist.- Paschim Medinipur under K.C. S. D. - XIV, of K. C. Div- IV, Midnapore.
E/R of S/E damaged due to one no. ghoge during Amabasya Kotal from 16.05.26 to 19.05.26 facing R/B of R/Baniboalia near sluice structure of 11 no Kumrakhali at M/Kumrakhali in Block- Basanti, P.S.- Basanti, Dist (S) 24 Pgs under JID.
Emergent repair work to various distributories of M.B.C. an Engagement of labour for smoothly operating gate at distributor no. 26L, 29L, 30L, 32L, 34L, 35L, 36L , Minor 1L of Dy 26L of Pirakata Section of K.C.Sub-Div. No-XII within K.C.Division IV
Construction of Single Lane R.C.C. Bridge over river Buriganga, at Mouza-Palangpur Gaighata in Block and P.S - Keshpur, and Dist.- Paschim Medinipur in connection with Ghatal Master Plan.
Construction of Single Lane R.C.C. Bridge over Branch Channal of river Buriganga, at Mouza-Suratpur Padima Shyamchak in Block and P.S - Keshpur, and Dist.- Paschim Medinipur in connection with Ghatal Master Plan.
E/R of S/E damaged due to Amabashya Kotal from 16/05/2026 to 19/05/2026 facing River Bidya(R/B) near Dhaner Arat in between 66.550 km. and 66.850 km for total length of 220 M at M/Tridibnagar in Block-Basanti, P.S.- Jharkhali Coastal, Dist.(S) 24 Pgs
Construction of Single Lane R.C.C. Bridge over river Buriganga, at Mouza-Suratpur in Block and P.S - Keshpur, and Dist.- Paschim Medinipur in connection with Ghatal Master Plan
Annual Maintenance Contract AMC in connection with operation and running routine maintenance of VT pumps with allied Electro Mechanical system of VT pumps of Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 2
Anti-Erosion work from Ch. 34.31 Km to Ch. 34.970 for a length of 660 M along the left bank of river Muriganga at Mouza Nadavanga, Block Namkhana, P.S Namkhana, Dist-South 24 Parganas
E/R of S/E damaged due to Amabasya Kotal from 16.05.2026 to 19.05.2026 in between 37.95 km. to 38.20 km. near Rampadakona at M/Parbatipur facing L/B of R/Matla in Block Basanti, P.S. Basanti, Dist. South 24 Pgs.
E/R of S/E damaged due to one no. ghoge near Sonakhali Jetty ghat during Amabasya Kotal from 18.03.26 to 22.03.26 facing R/B of R/Hogol at M/Sonakhali in Block- Basanti, P.S.- Basanti, Dist. (S) 24 Pgs under JID. 2nd Call
E/R of S/E damaged due to Purnima Kotal from 03.03.26 to 08.03.26 in between 2.105 km to 2.195 km at M/Kalidaspur facing R/B of R/Kapura in Block-Gosaba, P.S.-Sundarban Coastal, Dist-(S) 24 Pgs under JID. 2nd Call
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 16.05.26 to 19.05.26 for repairing of 1 no ghough with adjacent damaged embankment in between Ch 18.50 km to ch 18.55 km left bank of Thakuran river, JID.
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 16.05.26 to 19.05.26 for repairing of 1 no ghough with adjacent damaged embankment near Hemantakumari sluice in between Ch 20.15 km to ch 20.20 km under JID
ER of Sundarban embankment for two no ghoge due to full moon kotal from 30.05.26 to 02.06.26 facing river Thakuran RB at mouza - Sridharnagar under Joynagar I Division, Block - Patharpratima Dist. - South 24 Pgs.
ER of Sundarban embankment for three nos ghoges facing river Thakuran RB at mouza - Rakhalpur under Joynagar ( I ) Division-II, Block - Patharpratima Dist. - South 24 Pgs. Lat , Long - ( 21.751315 , 88.452845), (21.7514284 , 88.4531459
ER of Sundarban embankment damage due to 2 nos ghoge during new moon kotal from 02.04.26 to 05.04.26 facing river Shibua (L/B) at mouza -DK Kashinagar under Joynagar (I) Division-II , Block - Patharpratima Dist. - South 24 Pgs. under JID.
Emergent restoration to Sundarban Embankment damaged occurred due to Full Moon Kotal from 02.05.26 to 05.05.26 for repairing of 1 no ghough with adjacent damaged embankment in between Ch 15.70 km to ch 15.75 km left bank of Thakuran under JID
Emergent restoration to Sundarban Embankment damaged occurred due to Full Moon Kotal from 02.05.26 to 05.05.26 for repairing of 1 no ghough near keoratala H.P sluice with adjacent damaged embankment in between Ch 30.25 km to Ch 30.30 km under JID
Estimate for soil boring collection of soil samples from bore holes disturbed undisturbed conducting SPT and supplying it to HCL RRI Mohanpur Nadia as per requisitions of the different Offices under I W Department from all the districts of WB
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 17.04.26 to 18.04.26 for repairing of 1 no ghough with adjacent damaged embankment in between Ch 29.20km to ch 29.25 km left bank of Chatua river under JID.
Rehabilitation of Harindanga Sargoria Pole Sluice within G.P. - Harindanga-I, Block , P.S.- Falta , Dist - South 24 Parganas.
E/R of Sundarban embankment damage due to new moon kotal at mouza -Lakhijanardanpur, GP- Lakhijanardanpur, facing river Atharogachi Khal (R/B) for a length of 120 mtr under Joynagar (I) Division-II , Block - Patharpratima Dist. - S24 pgs under JID
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 16.05.26 to 19.05.26 for repairing of 1 no ghough with adjacent damaged embankment near Mukti office in between Ch 20.70 km to ch 20.75 km lunder JID.
Emergent restoration to Sundarban Embankment damaged occurred due to full moon kotal on dated 01.06.26 to 02.06.26 for repairing of 1 no ghough with adjacent damaged embankment near 1no sluice in between Ch 51.5 km to Ch 51.60 km under JID.
Annual Maintenance Contract AMC in connection with Manual cleaning of the Trash Racks at intake of VT pumps of Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Emergent restoration of Sundarban Embankment damaged due to full moon kotal on dated 03.03.26 to 05.03.26 from Ch 25.700 km to Ch 25.810 km for a length of 110 mtr facing left bank of River- Thakuran in Mz- Domkol in G.P- Nagendrapur under JID.
Emergent electrical works at flood control room and its allied offices of Western Circle II, Sekhpura Irrigation Colony under Midnapore Municipality in the district of Paschim Medinipur
Emergent restoration of Sundarban Embankment for repairing of one no ghoge occurred due to New Moon Kotal from 19.03.26 to 20.03.26 in between ch from Ch 32.940 kM to Ch 32.990 kM facing Left bank of river Mridanghabhanga under JID, 2nd call .
Emergent restoration of sundarban embankment damaged due to ghogh during new moon kotal from 02.04.26 to 05.04.26 facing river nakchara (L/B) at Mouza- kuemari under Joynagar (I) Division-II , Block - Patharpratima Dist.- s24pgs under JID.
Emergent restoration of Sundarban Embankment for repairing of one no ghoge occurred due to Full Moon Kotal from 03.03.26 to 04.03.26 in between ch from Ch 14.100 kM to Ch 14.170 kM facing Right bank of river Pukchara in mouza- Kailashpur under JID.
Supplying Unarmed Security Guards (Unskilled) of the premises of Md Bazar Irrigation Sub-Division (4nos), Md Bazar and Deucha Barrage (3Nos) ,Deucha for a period of one year under Md Bazar Irrigation Sub-Division during 2026-27.
Supplying Unarmed Security Guards (Unskilled) of the premises of Mollarpur Irrigation Sub-Division (4nos), Mallarpur for a period of one year under Mollarpur Irrigation Sub-Division during 2026-27.
Supplying Unarmed Security Guards (Unskilled) of the premises of Nalhati Irrigation Sub-Division (4nos) ,Nalhati for a period of one year under Nalhati Irrigation Sub-Division during 2026-27
Supplying Unarmed Security Guards (Unskilled) of the premises of Nishintapur Irrigation Colony (7nos) ,Rampurhat and Brahmani Barrage (3Nos) ,Baidhara for a period of one year under Rampurhat Irrigation Sub-Division during 2026-27
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Borobataspur (I) Section under Mollarpur(I) Sub-Division in Block - Md Bazar, Dist
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on dated 02.04.2026 to 05.04.2026 inbetween 3.65 km. to 3.75 km. facing L/B of river Thakuran in Mouza - Kishorimohanpur in P.S.-Maipith Coastal, Block- Kultali in Dt-S24pgs.
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July 26 to October 26 of Hd.Quarter (I) Section under Mollarpur(I) Sub-Division in Block -Mayureswar-I, D
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on dated 03.03.2026 to 06.03.2026 inbetween 25.700km. to 25.850 km. facing R/B of river Gurakhal in Mouza - Bhubaneswari in P.S.-Maipith Coastal, Block- Kultali in Dt-S24pgs.
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on dated 20.02.2026 to 23.02.2026 inbetween 19.30 km. to 19.40 km. facing L/B of river Thakuran in Mouza - Debipur Gurguria in P.S.-Maipith Coastal, Block- Kultali in Dt-S24pg
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Hastikanda(I) Section under Mollarpur(I) Sub-Division in Block - Rampurhat-I, Dis