Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on dated 20.02.2026 to 23.02.2026 inbetween 26.200 km. to 26.250 km. facing R/B of river Gurakhal in Mouza -Bhubaneswari in P.S.-Maipith Coastal, Block- Kultali in Dt-S24pgs.
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 from Ch. 38.30 to Ch. 400.65 of MDMC and its all Minors and water course of Head Quarte
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on dated 03.03.2026 to 06.03.2026 inbetween 25.100 km. to 25.150 km. facing R/B of river Gurakhal in Mouza - Bhubaneswari in P.S.-Maipith Coastal, Block- Kultali in Dt- S24pg
M/R to operation of regulator gates of Deocha Barrage and C/R/Fall at Ch 503.00 including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 inbetween Ch. 400.65 To Ch. 542.00 of M.D.M.C. of Duecho
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on dated 16.05.2026 to 19.05.2026 inbetween 5.50 km. to 5.55 km. facing L/B of river Thakuranin Mouza - Madhyagurguria in P.S.-Maipith Coastal, Block- Kultali in Dt-S24pgs.
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 from Ch. 0.00 to Ch. 502.00 of canal Dy-7A of MDBC with its all minors of of Kotasur (
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on dated 16.05.2026 to 20.05.2026 inbetween 28.05km to 28.17 km. facing RB of river Gurakhal in Mz - Nagenabad in PS-Maipith Coastal, Block- Kultali in District S24pgs.
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 from Ch. 0.00 to Ch. 565.00 of MDBC with its all distributaries and minors of Branch Ca
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Bonta (I) Section under Rampurhat (I) Sub-Division in Block- Rampurhat-I, District
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Brahmani Barrage (I) Section under Rampurhat (I) Sub-Division in Block- Rampurhat-
Soil Investigation for construction of Proposed New Bridge at Ch. 855.00 of Midnapur Branch Canal at Hatilot Mouza-Taldanga G.P.-Bhimpur,Block PS - Salboni, Dist-Paschim Medinipur.
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Chilla (I) Section under Rampurhat (I) Sub-Division in Block-Rampurhat-I., Distric
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Margram (I) Section under Rampurhat (I) Sub-Division in Block- Rampurhat-I, Distri
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Head Quarter (I) Section under Nalhati (I) Sub-Division in Block - nalhati-I, Dist
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 at ch. 1336.00 of B.N.M.C of Uttar Ramna (I) Section under Nalhati (I) Sub-Division in
M/R to operation of regulator gates including structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 from Ch.785.00 to Ch.920.00 of BNMC of Paikar (I) section under Nalhati (I) Su
Repair to Bhubaneswari Section office cum Rest Shed including Boundary Wall at Mouza Kishorimohanpur in Block - Kultali, P.S - Maipith Coastal, Dist. - South 24 Parganas under Kultala Irrigation Sub-Division under JID (2nd call ).
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 of Nalhati (I) Section under Nalhati (I) Sub-Division in Block - Nalhati-I, District
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 from ch.1300 to ch. 1392 of MDBC of Eroali (I) Section under Kuli (I) Sub-Division in
MR to of Raidighi Irrigation Bunglow in the Raidhighi Irrigation Campus in GP Raidighi abad of Block Mathurapur II, PS Raidighi, under Raidighi I SubDivision of Joynagar Irrigation Division in the district of South 24 Pgs.
Construction of concrete road and other infrastructure developement work within Sridharpur section office under Kuemari I Sub Division in Block, PS Patharpratima under Joyanagar Irrigation Division.
Emergent restoration of Sundarban Embankment damaged due to new Moon Kotal on and from 13.07.26 to 17.07.2026 for a length of 50.00 m in between Ch 12.10 Km to Ch 12.14 Km Ch 13.00 Km to 13.010 Km near Purba Guria chak Paler chak of Banstala
SUPPLY OF LABOUR FOR WATCHING AND GUARDING OF VARIOUS CANALS IN THE JURISDICTION OF KCSD-IV, SARENGA UNDER K.C DIVISION -I,AMLAGORA DURING IRRIGATION PERIOD OF 2026-27.
Construction of CC road for a length of 254.00 mtr at Raidighi irrigation colony campus at Raidighi Mouza - Raidighi, in G.P-Raidighi of Block -Mathurapur - II, P.S - Raidighi under Joyanagr Irrigation Division.
Emergent ghoges ( 2 nos) repairing at Sundarban Embankment damaged due to new Moon Kotal on and from 13.07.2026 to 17.07.2026 in between ch 18.62 km and ch 18.68 Km at Mouza Mrinalnagar near Gundakata, Block Kakdwip on the left embankment of Bansta
Emergent Sluice 5 nos and ghoges ( 3 nos) repairing at Sundarban Embankment damaged due to full Moon Kotal on and from 30.07.2026 to 03.08.2026 in between ch 28.025 km to ch 28.050 Km and 29.310km to 29.420km at Mouza- Narayanpur, Budakhali,Rajnagar
Emergent restoration of Sundarban Embankment damaged due to full Moon Kotal on and from 30.07.2026 to 03.08.2026 in between Ch.27.050 Km to Ch.27.160 Km for a length of 110 M facing river Muriganga left bank at Mouza-Rajnagar ,Block-Namkhana
Palliative protection work to prevent the bank erosion in the left bank of river Ganga for a length of 95.00 m at DS Paglaghat area under G.P.- Panchanandapur-I, Block-Kaliachak-II, P.S.-Mothabari, Dist.- Malda
Emergent restoration to Sundarban Embankment damaged due to full moon kotal from 30.07.2026 to 03.08.2026 for a length of 220.00 m from Ch.0.950 KM to Ch. 1.050 KM Ch.2.100 KM to Ch.2.220 KM facing the left bank of river Hooghly
Emergent Palliative Work on the Left Bank of River Ganga for a Length of 62 m near house of Kalu Mandal at Jitutola, G.P. Mahanandatola, Block Ratua-I, District Malda
Emergent restoration of Sundarban Embankment damaged due to full Moon Kotal on and from 30.07.26 to 01.08.2026 for a length of 110.00 m in between ch 25.00 km and 27.00 Km , Ch 22.00 Km and Ch 22.30Km of Gobadia , Gundakata river left embankment
Emergent restoration of damaged Sundarban Embankment due to Full Moon Kotal on and from 30.07.2026 to 03.08.2026 in between Ch.25.00 km and Ch. 26.00 km for a length of 220 m at mouza Gangapur facing river Chaltabonia under Patharpratima Irrigation
Emergent Palliative Work on the Left Bank of River Ganga for a Length of 60 m near house of Jishu Swarnakar at Jitutola, G.P. Mahanandatola, Block Ratua-I, District Malda
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on from 30.07.2026 to 03.08.2026 for a length of 180 m inbetween Ch. 19.56 km and Ch. 19.78 km facing river Curzon creek in mouza-Krishnadaspur under Patharpratima
M-R to lining work at different spots of HMC from ch.960.00 to ch.1005.00 , ch. 0.00 to ch. 150.00 of dy-4 and ch. 0.00 to ch. 180.00 of dy-5 under valuka Section under Hinglow (I) Sub-Division of Mayurakshi South Canals Division for the year 2026
M-R to lining work at different spots of HMC from ch.577 to ch. 960 under Dubrajpur (I) Section in Block and p.s.- Dubrajpur under Hinglow (I) Sub-Division of Mayurakshi South Canals Division for the year 2026-27.
Repairing of 1 no damaged outlet structures including allied works over the Hinglow Main Canal offtaking at ch. 234.00 under Hinglow (I) Sub-Division within Mayurakshi South Canals Division.
M-R of damaged lining and rain cuts at different chainage of Distributory 1 and 2 under Head Quater Section, Hinglow (I) Sub-Division for the year 2026-27.
M-R to lining work at ch. 187.00 of HMC for a length of 45 m at vill- Tarapur in Block at Khayrasole under Hinglow (I) Sub-Division of Mayurakshi South Canals Division for the year 2026-27.
Reconstruction of damaged superpassage near ch.80.00 of Hinglow Main Canal under Hinglow Irrigation Sub Division within Mayurakshi South Canals Division.
M-R to Minor-1 and Minor-2 of Dy.-5 and Minor-3, Minor-4 and Minor (Tail) of Dy.-7 of KSMC in Block-Lavpur, District-Birbhum, under Kirnahar (I) Sub Division within Mayurakshi South Canals Division.
Maintenance and Repair Works for Kharif Irrigation to 4 Nos. Watercourses at Ch. 1338.00, 1408.00, 1455.80 and 1533.00 of KSMC and 3 Nos. Watercourses at the Tail of Dy.-11 of KSMC in Block Nanoor, District Birbhum, under Kirnahar (I) Sub-Division
M-R to Canal system of BKMC in between Ch 0.00 and Ch240.00 under Bolpur (I)Sub Division within Mayurakshi South Canals Division.
M-R to Canal system of Dy-3A of KSMC from Ch. 0.00 to Ch. 150.00 under Bolpur Irrigation Sub Division within Mayurakshi South Canals Division.
M-R to Canal system of Dy-3 of KSMC from Ch. 0.00 to Ch. 40.00 and Dy-L-6 from ch 0.00 to 40.00 under Bolpur Irrigation Sub Division within Mayurakshi South Canals Division.
M-R to damaged canal bed and canal bank of Dy. No.-19 of KSMC in between ch.00.00 and ch.200.00 (approximate length 6.00KM ) under Salar Irrigation Sub-Division within Mayurakshi South Canals Division.
M-R to canal system in between ch.30.00 to ch.120.00 of Dy-7 of BKBC in Block and PS - Sainthia, Dist.- Birbhum of Bolpur (I) Sub-Division under Mayurakshi South Canals Division.
M-R to Canal system of Minor-2 of Dy-2 of KSMC in between Ch. 0.00 to Ch. 200.00 under Bolpur Irrigation Sub Division within Mayurakshi South Canals Division.
M-R to Canal system by desiltration in between Ch. 0.00 to Ch. 164.00 of Dy- 17 of K.S.M.C for a length of 5.00 km (approx.),Block-Ketugram-I, P.S. Ketugram in District-Purba Bardhaman under Salar (I) Sub-Division within Mayurakshi South Canals Di
M-R to canal system in between ch.100.00 to ch.220.00 of Dy-4 of BKBC in Block and PS -Bolpur-Sriniketan, Dist.- Birbhum of Bolpur (I) Sub-Division under Mayurakshi South Canals Division.