Loading…
Loading…
9,149 results • Latest
REPAIRING OF SANITARY LATRINES AT SATINDRA PALLY ADIBASHI PARA UPOR AND NICHER BASHA ETC UTTARAN IN WARD NO- 111,BR-XI
MAINTANANCE OF DAMAGED AND POT HOLES FREE ROAD BY BITUMINOUS SURFACEING TO PREVENT ROAD DUST AT A 67/50,STRAND ROAD IN WD NO-22
DAILY OPERATION AND UPKEEPING OF PLANT AT LAYALKA CAPSULE BPS
REPAIRING OF FLOOR, ROOF AND ALLIED WORKS OF PUBLIC TOILET AT CHATTAWALA GALI IN WARD NO. - 44, BOROUGH - V, KMC
Repairing, servicing and replacement of worn out components of 10 Ton capacity chain pulley at Padirhati DPS under GRBU.
MAINTENANCE OF SEWER SYSTEM AT 1/H/58, GHOSHBAGAN LANE, B/6/H, KRIPANATH DUTTA ROAD AND OTHER UTTARAN AREAS IN WARD NO-006 UNDER BR-I
MAINTENANCE OF DRAINAGE SYSTEM AT 7/H/13/B, KUNDU LANE AND OTHER UTTARAN AREAS IN WARD NO-003
Restoration and Strengthening of Capacitor Bank System for 6 nos Motor Feeder at Raw Water PH III of GRWW
Repairing of water level indicator at Kudghat LS-5, Keorapukur MPS, Canal Road LS and Buroshibtala LS-1 under Kudghat Unit/S and D Department.
PREVENTING ENTRY OF WATER INSIDE PUMPHOUSE OF STATION NUMBER ONE AND TWO AND CESC 1ST POINT SUPPLY ROOM DURING OUTSIDE WATER LOGGED AT TPS
IMPROVEMENT BY MASONRY AND PROTECTIVE WORK INSIDE QUARTER NUMBER 6 OF P BLOCK AT TALLAH PUMPING STATION
IMPROVEMENT OF ASPHALTUM ROAD AT BHATTACHARJEE PARA ROAD BYE LANE NEAR PRE. NO. 335 A IN WARD NO 125
RENOVATION AND REPLACEMENT OF DAMAGED AND WORN OUT SPARE PARTS WITH NEW ONES FOR SLUDGE PUMP-1 WITH ANCILLARY WORKS AT WTP-IV, GARDEN REACH WATER WORKS.
Consistent 128 GB 2.5 Inch Internal Solid State Drive (SSD)
New wiring in adjacent pump room near chlorination plant at Bangur STP under MDPS.
Rewinding of 2 no squarrel cage induction motor for screw pump motor (15HP/415V pump unit-1 and 2 other electrical allied works at Bangur STP under MDPS.
Urgent fault repair and rewinding of burnout coil of Squirrel cage induction motor no-1 (56KW, 80A, Kirloskar Make) including others electrical allied work at Bangur MPS under MDPS.
Supply, Installation, Testing and Commissioning of 12.5 Meter high Mast Lighting system at Sirity Burning Ghat
RESTORATION OF DISTURBED AND DAMAGED PAVER BLOCK FOOTPATH AT JAWAHARLAL NEHRU ROAD FROM PARK STREET TO LENIN SARANI IN WARD 46
REPAIRING AND RESTORATION OF FW AND UFW SUPPLY MAIN PIPE BY CUT AND FLUSH, CHANGING OF DEFECTIVE S.V AND ALLIED WORKS AT DIFFERENT PLACES IN WARD NO- 10
Replacement of Bitumen pipe lines, cleaning hot-oil pipe lines and cleaning inside of thermodrum for DM-45 plant at Asphaltum Department, Palmer Bazar.
MAINTENANCE OF FW SUPPLY SERVICE MAIN PIPE BY LEAK REPAIRING, CHANGING OF DEFECTIVE S.V, CHANGING OF G.I SERVICE PIPE OF STAND POST, URINAL AND ALLIED WORKS AT DIFFERENT PLACES IN WARD NO- 07
REFILLING OF EXISTING FIRE EXTINGUISHERS FITTED AT DIFFERENT WINGS OF WORKSHOP AND ADMINISTRATIVE BUILDING ALONG WITH INSTALLATION OF NEW FIRE EXTINGUISHERS WITH ALLIED WORKS IN EWS.
TESTING AND EVALUATION OF TRANSFORMER OIL AND ELECTRICAL PARAMETERS OF TRANSFORMERS AT RWPS PH-I, PH-II AND PH-III
REPAIRING OF DAMAGED CEMENT CONCRETE ROAD AT GUNAMANI SAFUI ROAD NEAR PREM NO 2/3 GUNAMANI SAFUI ROAD AND OTHERS IN W/NO 106.
MAINTENANCE OF FOOTPATH DISTURBED DUE TO NATURAL WEAR AND TEAR (IN DEFFARENT LOCATION) AT ROBINSON STREET, S.P SARANI,ROWDON STREET ETC. AND ITS SURROUNDINGS AREA IN W/63
SUPPLY,DELIVERY,FITTING-FIXING,TESTING AND COMMISSIONING OF NEW SPARE PARTS IN PLACE OF DAMAGED AND WORN OUT PARTS OF 750MM DIA ACTUATOR OPERATED NON-RISING TYPE DELIVERY SLUICE VALVE OF PUMP UNIT NO.2 WITH ALLIED WORKS AT CWPS-II, GRWW.
RAISING and REPLACEMENT OF MH COVERS AT BURDWAN ROAD, HOSSAIN SHAH ROAD, DEBI CHOWDHURY ROAD ETC. IN WARD NO 74 and 79 UNDER BR. IX
SUPPLYING, FIITING and FIXING S.S FLAP SHUTTER AND ACTUATOR AT MUNSHIGAUNJE OUTFALL INCLUDING ALLIED CIVIL WORKS
SUPPLYING, FIITING and FIXING S.S FLAP SHUTTER AND ACTUATOR AT BOAT CANAL OUTFALL INCLUDING ALLIED CIVIL WORKS
REPAIRING, OVERHAULING, DE-HYDRATION, TESTING AND COMMISSIONING TWO NOS OF 630 KVA, 6KV /415V TRANSFORMER AT SUB-STATION OF CWPS-III,GRWW.
RENEWAL OF AREA ILLUMINATION SYSTEM BY NECESSARY SUPPLY AND INSTALLATION OF LED LIGHT FITTINGS WITH ALLIED ELECTRICAL ACCESSARIES AT ANANDAPUR BPS
REPLACEMENT OF OLD AND DAMAGED G.I PIPES FOR FRESH WATER SUPPLY AND STOP CONTAMINATION AND ALLIED WORKS AT JANNAGAR ROAD,GORA CHAND LANE 3/1, 16 AND ADJACENT AREA, GORACHAND ROAD PR. 2 TO 3 AND CREMATORIUM STREET PR. 1 TO 7 AND ADJACENT AREA.
RESTORATION OF PUMPING SERVICE BY REPLACEMENT OF DEFECTIVE SPARES OF 4 NOS. SUBMERSIBLE PUMP-MOTOR UNITS FOR PHOOLBAGAN ESR SIDE DELIVERY LINE AT PATULI BPS
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT SATINDRA PALLY ROAD FROM SUKUR ALI TEA SHOP TO C68 SATINDRA PALLY IN WARD NO. 111 UNDER BR XI
SUPPLY AND LAYING OF 3 CORE 300 SQ.MM. HT POWER CABLE WITH TERMINATION FOR 2ND POINT 11KV POWER SUPPLY AT ANANDAPUR BPS
MISCELLANEOUS AIR CONDITIONING AND ELECTRICAL WORKS AT DIFFERENT DEPTT LIKE PERSONAL, WS, MC ROOM OF CMO BUILDING AND CHAPLIN BHAVAN ETC UNDER KMC.
OPERATION AND UPKEEPING OF PLANT AT PANCHASAYAR CAPSULE BOOSTER PUMPING STATION FOR 3(THREE) YEARS.
ANNUAL OPERATION AND MAINTENANCE OF ELECTRICAL DISTRIBUTION NETWORK AND ROUTINE MAINTENANCE OF DIFFERENT PASSAGES OF GROUND AND 1ST FLOOR OF ENTALLY MARKET,BR-VI,KMC
Complete re-winding, repairing, servicing and overhauling with allied works of 51.5 cusec 415V, 304.5kW submersible Pump unit no. 2 at Padirhati DPS under GRBU.
SUPPLY, DELIVERY AND INSTALLATION OF 3 NOS. 230 VOLT, 50 HZ, SINGLE PHASE, SPLIT TYPE 2 TON AC MACHINE FOR CONTROL ROOM OF CLEAR WATER PUMP HOUSE PH-II AT GRWW.
INSTALLATION OF C.C.CAMERA INSIDE ENTALLY MARKET IN WARD NO 54,UNDER BOROUGH VI
OPERATION AND UPKEEPING OF PLANT AT PANCHANANTALA CAPSULE BOOSTER PUMPING STATION FOR 3(THREE) YEARS.
REPAIRING, OVERHAULING, DE-HYDRATION, TESTING AND COMMISSIONING OF 1000 KVA, 6KV / 415V TRANSFORMER NO.-2 AT PH-II SUB-STATION IN GRWW.
LIFTING THE EXISTING DEFECTIVE 6 KV,750 KW HT MOTOR AGAINST PUMP UNIT NO. 4 AND INSTALLATION, TESTING, COMMISSIONING OF 6 KV, 750 KW HT STAND BY MOTOR AGAINST THE SAME WITH OTHER ALLIED WORKS AT CLEAR WATER PUMPING STATION PH-II AT GRWW.
Planning, Design and Construction of Hospital Building at the site of old Ramrikdas Haralalka Hospital at 108 Ashutosh Mukherjee Road including Demolishing of existing building (Phase-II) and Rehabilitation Building in front of premises no. 18, D.L
RESTORATION OF FOOT PATH AND PASSAGE (DISTURBED BY WATER SUPPLY, P.U AGENCY AND DAMAGED PORTIONS) AT 1/1, 3, 12, 15, 17, 47/1, S. S. A. RD, 21/1, 32, DR S. S. RD, 33 M.I LN AND ADJACENT AREA IN WD-054
ELECTRO-MECHANICAL FAULT DETECTION AND RESTORATION WORKS AT SHITOLA KHOLA CAPSULE BPS
ELECTRO-MECHANICAL FAULT DETECTION AND RESTORATION WORKS AT KALPATARU JALADHAR CAPSULE BPS
IMPROVEMENT OF SEWERAGE SYSTEM WITH ANCILLARY CIVIL WORK AT 10/1C,10/2/H/17,KABITIRTHA SARANI AND SURROUNDING AREA IN WARD NO-075 (APAS/01/158/262/0013)