Loading…
Loading…
209 live101 closing this weekmost from Public Works Department (PWD)
209 results • Latest
Constructon of 50 Seater Boys Hostel Building at Govt. Polytechnic Ramanujganj Distt Balrampur Ramanujganj (C.G.) including Electrification Works.
BT Work at New Perimeter Road at Maa Mahamaya Airport Ambikapur Distt. Surguja (C.G.)
REPAIR WORK OF CEMENT CONCRETE PATCH REPAIR ON VARIOUS S.H. & M.D.R. ROADS UNDER P.W.D. SUB DIVISION MAHASAMUND.
REPAIR WORK OF CEMENT CONCRETE PATCH REPAIR ON VARIOUS S.H. & M.D.R. ROADS UNDER P.W.D. SUB DIVISION PITHORA.
BT PATCH REPAIR WORK UNDER A/R WORK ON VARIOUS STATE HIGHWAYS UNDER SUB DIVISION NAGRI.
Road Safety work on Various Major District Road Under Sub-Division Kurud.
SUPPLYING, INSTALLATION TESTING & COMMISSIONING OF LED STREET LIGHT WITH POLE & HIGH MAST AT RAJIM-FINGESHWAR-MAHASAMUND ROAD (LENGTH - 4100 METER) ROAD DIST- GARIYABAND (C.G.)
SUPPLYING, INSTALLATION TESTING & COMMISSIONING OF LED STREET LIGHT WITH POLE FROM RAJIM MAIN ROAD TO FOREST OFFICE (1800 METER) RAJIM BLOCK FINGESHWAR DIST- GARIYABAND (C.G.)
Supplying Installation Testing & Commissioning of E-Class Room in Govt. Rajiv Lochan PG College Building at Rajim Dist-Gariyaband
Construction of Balance work (Third & Fourth Floor) Nursing Hostel at C.C.M.G.M.C.H. Kachandur, Front Side of Boundary Wall at Chandulal Chandrakar Memorial Govt. Medical College & Hospital, Kachandur, Repair Work of Window work ar Chandulal Chandrakar Memorial Govt. Medical Coolege & Hospital Building Kachandur, Distt. - Durg
MINOR ORIGINAL WORKS FOR NON RESIDENTIAL BUILDINGS UNDER KAWARDHA SUB DIVISION
Construction of RCC Drain at Patora Danganiya Road (at Patora Village in RS km 2/4 to 3/2 (20m) = 820 mtr & Dangainya Village LS km 7/4, 7/6, 7/8 (100m) = 500 mtr Total Length 1400 Mtr Block Saja Sub Division Saja Distt Bemetara
MINOR ORIGINAL WORKS FOR RESIDENTIAL BUILDINGS UNDER KAWARDHA SUB DIVISION
Balance Work of Warehouse for Storage of EVM and VVPAT at Khairagarh, Distt -Khairagarh-Chhuikhadan-Gandai (CG)
CONSTRUCTION OF ANIMAL DISEASE DIAGNOSTIC LABORATORY BUILDING OF VETERINARY DEPARTMENT AT DISTT. - KHAIRAGARH CHHUIKHADAN GANDAI
Construction A.D.R. Center Building in Jashpur(Deposite Work) (Without Escalation and Bonus)
Construction of Gram Panchayat Baghnibhanwar to Bagharra Approach Road Length 1.475 Km. Distt. Mungeli.
Construction of Umradah to Nipani Road Length 12.00 K.M. I/c Bridges & Culverts At Distt.- Balod (C.G.)
Construction of Govt. College Building at Baramkela. i/c W.S.S.F. Electrification, Boundary wall & Approach Road Works
CONSTRUCTION OF SEEPAT BELTARA MAIN ROAD TO BHADI APPROACH ROAD LENGTH 1.00 KM.
SPECIAL REPAIR OF ROAD AND BRIDGE CULVERT UNDER SUB DIVISION NO.3 BILASPUR AND HIGH COURT SUB DIVISION NO.2 BILASPUR (C.G.)
S/R WORK AT HIGH COURT SUB-DIV-1 & 2, SUB-DIV-3 AND KOTA SUB-DIV. UNDER P.W.D. DIVISION NO.2, BILASPUR (C.G.)
S/R,MOW FOR RESIDENTIAL AND NON RESIDENTAIL BUILDING UNDER SUB DIVISION SARANGARH
S/R, MOW WORK FOR RESIDENTIAL AND NON RESIDENTIAL BUILDINGS UNDER SUB DIVISION BILAIGARH DIVISION SARANGARH-BIALAIGARH
SR WORK ON ACHANAKPALI APPROACH ROAD LENGTH 2.00 K.M. UNDER SUB DIVISION SARANGARH
SR WORK OF AMODI-MADWA-PAWANI ROAD (MDR-470 ,IN K.M. 19/4 TO 19/10 = 772.03 M.) AND MOHATARA-MANPASAR RAOD(VR-111, IN KM 1/2 TO 1/8 =402 K.M.) UNDER SUB DIVISON BILAIGARH.
CONSTRUCTION OF CHAKWE TO PARSADA ROAD,LENGTH 2.00 K.M. I/C. CULVERTS AT DISTT. RAIPUR.(DN. NO.2, RAIPUR)..
B.T. Patch Repair on Various Roads under P.W.D. Sub Division Kanker.
B.T. Patch Repair on Various Roads under P.W.D. Sub Division Pakhanjore.
B.T. Patch Repair on Various Roads under P.W.D. Sub Division Antagarh.
Shifting of 4 Pole Structure, Transformer, 33 KV Line,11 KV Line & LT Line due to road widening works Route From Panduka-Kaundkera Road under P.W.D. (E/M) Sub-Division Dist- Gariyaband
B.T. Patch Repair Work of Roads Under Construction Sub Division No.-2 Raipur 1. Professor Colony 2. Mahamaya Ward 3. Changorabhata Ward 4. Raipur Pallari Baloda Bazaar Road 5. Tikrapara Sejbahar Road
B.T. Patch Work of 1. Tarra Pawni Khauna 2. Kurra to Kolhan Nallah 3.Akoli Saguni 4. Dhaneli Giraud Tekari 5. Bhukoni Chhapora Lalpur Under Silyari Section No.-01, Raipur
B.T. Patch Repair on Nandanvan Jarway Hirapur Road, Tatibandh Hirapur Fourlane Road, Urla Patharidih Road KM 2/6 to 5/2, Tendua Hathband Road KM 2/6 to 3/4, Bana Berla Anicut Road, Patharidih Kanhera Road, Bendri Approach Road, Tendua Jarway Approach Road, Sondongari Internal Road, Under Vidhan Sabha Sub Division Raipur (C.G.)
NECESSARY OUTER DEVELOPMENT WORK SUCH AS :- RENEWAL OF RAOD ,LENGTH 8 K.M., DRAIN-CULVERT, LAND SCAPING & OUTER BOUNDRY WALL , UTILITY SHIFTING & OTHER ESSENTIAL WORK OF RAJBHAWAN, HONORABLE CHIEF MINISTER'S & HONORABLE MINISTERS CONSTRUCTED CAPMUS AT RAIPUR .DISTT. RAIPUR.I/C. ELECTRIFICATION WORK.(DN. NO.3, NAWA RAIPUR).( EXCEPT FOR RENEWAL OF ROAD ,LENGTH 8 K.M., DRAIN-CULVERT).
NECESSARY OUTER DEVELOPMENT WORK SUCH AS :- RENEWAL OF RAOD ,LENGTH 8 K.M., DRAIN-CULVERT, LAND SCAPING & OUTER BOUNDRY WALL , UTILITY SHIFTING & OTHER ESSENTIAL WORK OF RAJBHAWAN, HONORABLE CHIEF MINISTER'S & HONORABLE MINISTERS CONSTRUCTED CAPMUS AT RAIPUR .DISTT. RAIPUR.I/C. ELECTRIFICATION WORK.(DN. NO.3, NAWA RAIPUR ( ONLY FOR RENEWAL OF ROAD ,LENGTH 8 K.M., DRAIN-CULVERT WORK.).
Strengthening of Sargaon Pathariya Road in Km 1/2 to 5/10, 7/2 to 7/10, 11/2 to 12/10 & 14/2 to 14/10 Total Length 9.00 km
Construction Of High Level Bridge and Approach Road Across Chiraipani Nalla on Raigarh-Chiraipani Road K.M. 9/2
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD ACROSS KHAIRA NALLA ON KHARIPATRA- KOTRADONGRI- ROAD.
CONSTRUCTION OF OFFICE BUILDING FOR PWD DIVISION NO.3 & DIVISION OFFICE (E/M) BUILDING -02 NOS & 04 NOS SUB DIVISIONAL OFFICE BUILDING AT DISTT. RAIPUR.( DN. NO.3 NAWA RAIPUR).
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACHES ACROSS BELGAL NALLA IN KM. 6/6 ON MARODA-BELGAL-CHHOTEBETIYA ROAD.
Construction of Neosa to Gadhwat Road Length 6.325 Km.
Construction of Half Olympic size Swimming Pool (PART- 3) at Integrated Sports Complex Kunkuri, Jashpur (C.G.)
Construction of High Level Bridge i/c Approaches across Sapnai Nalla on Banora - Dumarpali Road.
Strengthening of Rajnandgaon- Arjunda-Gunderdehi Road (SH-23) in K.M.-17,18,23,24,28,29,30 to 35=12.00 KM at Distt.-Balod (C.G.)
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACHES ACROSS THE SENDUR RIVER ON KEREGAON - GATTASILLI ROAD IN K.M. 4/10
Strengthening of Deokar-Ghota-Jalbanda(MDR) Road Length 12.40 K.M. at Distt.- Bemetara (C.G.)
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD ACROSS PHOOL RIVER IN KM. 5/6 ON KUNNA TO MICHWAR ROAD. (UNDER DEPOSIT WORK) (Without Escalation and Bonus)
STRENGTHENING OF KENDAI-BARDAR- BAIKUNTHPUR- SONHAT- RAMGARH-M.P. BOARDER ROAD LENGTH 20.46 KM DISTT- KOREA (C.G.)
Construction of 06 Nos. Barrack (Factory Barrack (G.F./F.F./& II F. High Cell Barrack) i/c Electrification work at Central Jail Jagdalpur (Balance Work). (Work code – W23863)