Loading…
Loading…
4,826 results • Latest
NCTPS II MI Circle CA CWPH Unit II Inspection of internals attending defects by dismantling the CWP 2C internal
Improvement works by replacing the existing damaged terrace (pressed) tiles, damaged concrete in the roof slab and redo the same along with allied works such as colour washing and white washing to the control room building of Vikramangalam 33/11KV SS
TTPS ES Circle EM II Annual maintenance of HT LT Breakers Modules Busbars and Isolators during the Overhauling period of 2025 26 at Ash Handling Plant Stage I
TTPS ES Circle EM II Overhauling of LT Motors in Boiler and mill area and valve motors in Boiler area of unit I during Capital overhaul period of 2025 2026
Ractification works to the ceilingconcrete,Weathering course,Plinthbeam providing new galvalume colour sheet including colour,white washing and chainlink fencing with other allied works to the control room building of old narasingampatty 110/11 KV SS
TTPS ES Circle EM II Overhauling of LT Motors such as seal air fan motor AC DC scanner motor and LOP FLOP of FD PA fan motors in unit I during the Capital overhaul period of 2025 26
TTPS ES Circle EM II Core lifting inspection and internal cleaning of all 20 Nos Rectifier Transformers in ESP I during the overhauling period of 2025 26
TTPS ES Circle EM II Cleaning with emery sheet on Rusted area and soap Water Washing the external body of HVR Transformer Duct and Field Disconnecting Switch box with two coats of painting with Enamel smoke Gray Aluminium color paint in ESP I duri
TTPS ES Circle EM II Major overhauling of 2 Nos fan motors 5 Nos Mill motors and Annual preventive maintenance of 4 Nos fan motor 1 No Mill motor during unit I capital overhauling period of 2025 2026
TTPS ES Circle EM II Annual Maintenance of LT SWGR Buses Breakers electronic controller panels auxiliary control panels and overhauling of LT motors in ESP I overhauling of the year 2025 2026