Loading…
Loading…
5,945 results • Recent activity
MTPS I TM Unit I Unit II Preventive Breakdown maintenance works and Repairing works of Air Compressors Make KG Khosla Model No 2HA2QT Air Dryers Make Khosla as and when required basis for a period of one year from the date of commencement
MTPS I TM Division Load Testing of 2Nos 125 30 T Station EOT Cranes during 2024 2025
MTPS I BM Unit II Boiler pressure parts COH 2024 Supply and installation of Air sealants in penthouse to avoid ash leakage air ingression to the boiler and allied works
MTPS I Mill Plant Unit II Coal flow system to boiler Rotating the existing eroded straight coal pipes to Boiler corner 1 to 4 to 180 deg at 16 meter level near Boiler area during capital overhaul 2024 25
MTPS I CA RWS Overhauling of Raw Water Pump No 02 and its butterfly valve dismantling fabrication and Erection and Painting of damaged raw water intake screens at Raw water pump house
MTPS I Mill Plant Unit II Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 2A 2B 2D 2E 2F to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25