NCTPS I SE M II Circle ECHS Dn Renovation of the existing defective Air Ventilation system by modification renewal of worn out parts testing and commissioning of Air Ventilation system for LCSS 3 and 5 in ECHS area
NCTPS I SE M II Circle ECHS Dn Renovation of the existing defective Air Ventilation system by modification renewal of worn out parts testing and commissioning of Air Ventilation system for LCSS 1 and 4 in ECHS area
NCTPS I SE M II Circle ECHS Dn Renewal and strengthening of most corroded damaged trestles brazings and gusset plates in the counter weight area and trestles No TR12 and TR14 for BCN 40A and 40B
MPM UI_II Doz lev quen of mill rej from01_04_26 to 30_03_27
NCTPS I SE M II Circle ECHS Dn NCTPS AIP Railway siding Recoupment of Ballast in the deficiency area of 10th and 11th track line inside NCTPS siding track by dumping spreading and deep screening of ballast
NCTPS I SE MII Circle ECHS Dn Reconditioning the damaged wornout Portions in the tongue rail of size 1x 8.5 and fabricated crossing of size 1x8.5 in reception line and packing of points crossing in various tracks line
TTPS Mech II TM I Unit I Reconditioning of RC Valve plug with stem and soft seat of RC valve Model No 87 79006-series retrieved from Boiler Feed Pump system
TTPS Mech II AHP Unit I Attending overhauling works in Unit I ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in ECO APH hopper platforms dur
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul
NCTPS I SE M II Circle ICHS Dn Strengthening and painting the cable gallery structure from AC plant wall to ICHS control room