Loading…
Loading…
4,850 results • Latest
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul
NCTPS I SE M II Circle ICHS Dn Strengthening and painting the cable gallery structure from AC plant wall to ICHS control room
NCTPS I SE MI circle R M 25 26 BM Dn Unit I II III ESP Reconditioning of defective CERM Gear Boxes
NCTPS I SE M II Circle ICHS Dn Overhauling of defective fluid coupling 26SCR24R released from conveyor 4B
NCTPS II M I Circle MPM III AC Plant carrying out up keeping routine maintenance works in the
NCTPS I SE MI Circle AMC 26 27 BM Dn Unit I II III Attending of Steam Feed Water Leaks in Valve glands pipes punctures valve flange bonnet in PRDS System soot blowing system by ON LINE SEALING METHOD
NCTPS I SE MI Circle AMC 26 27 BM Dn Unit I II III On line arresting of steam/ Boiler feed Water leaks in HP LP valves MS and RH spray line valves and sampling line valve glands flanges and bonnet in Boiler by ON LINE LEAK ARRESTING METHOD
NCTPS I SE M II Circle AHP Dn Unit I II III Providing floor grill above ash slurry trench in unit I II III from Bottom Ash Hopper to Duct hopper area
NCTPS I SE MI Circle AMC 26 27 TM Dn Unit I II III Turbine its Auxiliaries On line arresting of steam feed water leaks in glands flanges and bonnet of turbine and feed water system connected valves and pipe lines by ON LINE LEAK ARRESTING METHOD
TTPS Mech II BM Unit I Inspection overhauling and commissioning of actuators of high pressure valves in boiler during forthcoming overhaul