Loading…
Loading…
4,926 results • Latest
MTPS I Mill Plant II Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in Mills 2A to 2F during AOH
MTPS I Mill Plant Unit II Overhauling of classifier assemblies Replacement Repairing of inner cone inner cone drum section Venture vanes venturi Collars and overhauling of spring compression assembly in Mill 2A to 2F during AOH 2025 26
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 2A to 2F during AOH 2025 26
Supply of 12 MM Dia Poly Propylene Rope
MTPS I Mill Plant Unit II Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 2A to 2F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
MTPS I Mill Plant Unit III Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipes with bends and renewal of eroded pipes of length at about 15mtr length along with bends between Mill Outlet Elbow and Fuel Inlet Elbow during AOH 2025 26
supply of shaft mounting gear box assembly for TWS
Supply of Fully finished elastomeric homogeneous tough synthetic fiber alloy bearing for vertical type CWPs in Unit I and II in Cooling Water Pump House
Supply of Spool piece pipe with flanged in one end and a loose flange for other end for delivery branch side Style-I of discharge header of vertical type CWP 1C