MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes to Boiler corner 1 to Corner 4 for 180 deg rotating at 16 meter level near Boiler area during Annual overhaul 2025 26
MTPS I Mill Plant Unit IV Changing of coal pipe with collar at various location in the coal pipe lines during Annual Overhaul 2025 26
MTPS I Mill Plant Unit IV Hard facing of vertical coal pipe mtr length after Transition piece 24Nos in Mill 4A to Mill 4F during Annual overhaul 2025 26
NCTPS I ES Circle EM II Dn S Dn I Repair and Rewinding works of various capacities of LT motors of Mill plant and Boiler area of all the three units at NCTPS I
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes etc
MTPS I BM Unit I Annual maintenance 2025 26 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 4A 4B 4C 4D 4E 4F for 180 rotation at 16 meter level above the mill and below the 18 meter floor and Dismantling rectification
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I CA CWS I Overhauling of 1600 mm BFV including actuator GB overhauling checking and renewal of Nitrile rubber seal painting of Intake screen of Cooling water Pumps 1A 1B and 1C and allied works
MTPS I CA CWS I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH 2025 2026 of Unit I