Loading…
Loading…
4,912 results • Latest
MTPS I CA CWS II Unit III Overhauling and painting of Sludge Disposal Pump and Cold and Hot water Tunnel vent valves Air Vent valves Gate valves etc
MTPS I CA CWS I Complete dismantling inspection Overhaul and renewal of pump components in 2 Nos Cooling Water Pump of capacity 16000 M3 per Hr Single Stage 64 inch VMF Model 1175 KW motor in stage I
MTPS I CA CWS II Unit III and IV Overhauling of existing 3 Nos ID fan gearboxes including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in Cooling Tower Stage II
MTPS I CA CWS II Unit III and IV Reconditioning of released FRP fan blades 2 Sets for Cooling Tower ID fans of stage II
MTPS I TM Unit IV Inspection and complete overhauling of Boiler Feed Booster pump 4A 4B during AOH of 2025 26
SUPPLY OF LT GI PIN
MTPS I CA CWS II Unit IV Fabrication and Erection of Cooling Tower ID fan 5 gear box base frame channel base plate and its auxiliaries in CT IV
MTPS I TM Unit IV Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 2 of Instrument Air System overhauling of Refrigerant Dryer overhauling of 150mm NRV valves
MTPS I BM Boiler Pressure parts Reconditioning of defective Main Steam Stop Valve MSSV 350 NB Left Right at Boiler end with build up ends in Unit IV
MTPS I TM Unit IV Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2025 26