Loading…
Loading…
4,912 results • Latest
SUPPLY OF LT THREE PHASE CHANNEL CROSS ARM
SUPPLY OF 11KV AB SWITCH WITH PT INSULATOR
22KV AB SWITCH WITH CLAMPS AND HG FUSE SET WITH CLAMPS FOR 22KV SINGLE POLE STRUCTURE - EXCLUDING
Supply of LT Guy Shackle Insulator
MTPSI TM Unit IV Overhauling of Beacon Rotork Ind-modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit IV AOH 2025 26
MTPS I BM Unit III Boiler pressure parts AOH 2025 Rectification Replacement of defective rear arch goose neck bends tubes and allied works
Supply of HT TI Fitting
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I CA CWS II Unit III Overhauling of Flow Control Valve complete assembly and renewal of its worn out components and patch welding in Cooling Tower III during Unit III AOH 2025 2026
MTPS I CA CWS II Unit III Overhauling of 1600 mm BFV in CWP discharge line including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal etc