ECHP-I- Providing rubber lagging of various conveyor pulleys in ECHP-I Division
NCTPS I SE M II Circle ECHS Dn Strengthening of existing severely damaged corroded boom conveyor structures MCC room and operator cabin in Stacker 1B
ICHP- Clearing the juliflora jungle without uprooting, construction of RCC pedestal cleaning and painting of cable tray support structures and columns located from CHS-V to TT-4
ECHP-I- Replacement of complete worn out damaged asbestos roofing sheet and erection of new colour coated M.S roofing sheet inside portions of 7th floor roofing structure at Secondary Crusher House-I
Supply of ECO Hopper Ash Disposal Pipe Lines and Fittings for Unit IV
Dragging out the floor ash under B Pass of ESP by using the Front End Bar Loader to facilitate the manual unloading hopper ash at B Pass
ECHP-I- Reconditioning of submerged portable split casing pump, starter panel and rewinding of failed 15KW motor at paddle feeder
Dragging out the floor ash under A Pass of ESP by using the Front End Bar Loader to facilitate the manual unloading hopper ash at A Pass
ECHP-I- Replacement of existing aged pull chord copper control cables in Conveyor-14,15,16 by the 4C x 1.5 Sq.mm copper control cables diverted from Uppur Power Project
Procurement Erection Testing and Commissioning of Oil Free Screw Air Compressor (OFSAC) using existing 3.3 KV 340 KW HT electric motor drive at MTPS II including Dismantling of old ELGI make NH265 9 model compressor in SAC A B 2 Nos