Loading…
Loading…
4,520 results • Latest
MTPS I Civil Circle - Providing one number Diesel / Petrol driven Tata Sumo or equivalent Vehicle on hire basis for the official use of the Executive Engineer Civil Division II Mettur Thermal Power Station I
MTPS I - Civil Circle Up keeping of Central office Building and Dispensary in Thottilpatty camp area by cleaning of Toilets and Sweeping works for the period of one year from the date of Commencement
Hiring of 1No diesel driven Van Jeep for the Official use of Assistant Executive Engineer /OandM/West Vellore for a period of One year
Supply of spares for 100T Electronic Weigh Bridge
HV AEE/O/SPH2 OT-20
NCTPS I SE MI circle R and M 25 26 BM Dn Unit I ESP Columns Retrofitting of severely corroded damaged ESP Column structure and bracings by dismantling of corroded damaged portion and fixing welding of fabricated structure as original during the
NCTPS I SE MI circle R M 25 26 BM Dn Unit II B pass Renewal of corroded and damaged motor hoods and lub oil system hoods for ID FD PA fan
NCTPS I SE MI circle R M 25 26 BM Dn Unit II Renewal of damaged walk way platform supporting structures and ladders for FD fan 2B in the structures and painting in the renewed supporting structures and ladders
Supply of Back Clamp 8.0 Mtr Suitable for PSC Pole
Hire vehicle for the use of AEE/PRO/Ramnad
Supply of 11 KV AB SWITCH WITH COMPLETE SET ( Single pole)
NCTPS I SE MI circle R and M 25 26 MPM Dn Unit III Thread repair of journal opening covers in various Mills
NCTPS II M I Circle CA CWPs 2C to 2F Carrying out daily and periodical maintenance works in the cooling water pumps
Supply of 11KV Standalone Structure Material Complete set
NCTPS II Civil Maintenance Circle Civil Maintenance Division Raising the low lying area infront of Canteen building and Two wheeler parking area with concrete paver blocks at NCTPSII
NCTPS II Civil Maintenance Circle Civil Project Division Strengthening the existing pump room of Sewage collection well in Vallur Camp
LT Three Phase Angle X Arm
NCTPS II Civil Maintenance Circle Civil Project Division Repair and maintenance of R14 block at Vallur Camp
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and Maintenance works to the Workshop Building at NCTPS-II
Supply of spares for Final Drive Gear box of SAN Locomotive No3 _7 items
NCTPSII Civil Maintenance Circle Civil Maintenance Division Cleaning the Juliflora jungle at both inside and outside of Western side compound wall at NCTPS II
NCTPS II M I Circle MPM Ventilation system Carrying out up keeping routine and continuous monitoring
Imp Esti for improving tail end voltage in poolavilai area colachel by providing 1no 63 KVA DT in 11 KV lakshmipuram under colachel section in various works and various section under Eraniel C and I section in Thuckalay division
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance works to the Power house Unit I 17m ceiling at NCTPS II
Running works contract for engaging additional manpower during summer 2026 to maintain uninterrupted, quick restoration of supply in Town Udumalpet Gandhinagar North Udumalpet South Udumalpet and East Udumalpet sections in AEE O M Town Udumalpe
Running works contract for engaging additional manpower during summer 2026 to maintain uninterrupted, quick restoration of supply in Manupatty West Udumalpet Elayamuthur and Kurichikottai sections in AEE O M North Udumalpet Sub Division in Udumalpe
Running works contract for engaging additional manpower during summer 2026 to maintain uninterrupted, quick restoration of supply in Valavady Dhally and Poolankinar sections in AEE O M West Udumalpet Sub Division in Udumalpet Division
Running works contract for engaging additional manpower during summer 2026 to maintain uninterrupted, quick restoration of supply in Poolavady Gudimangalam and Thungavi sections in AEE O M Poolavady Sub Division in Udumalpet Division
Running works contract for engaging additional manpower during summer 2026 to maintain uninterrupted, quick restoration of supply in Madathukulam Kaniyur Komaralingam and Pappankulam sections in AEE O M Madathukulam Sub Division in Udumalpet Divisio
NCTPS II Civil Maintenance circle Civil Maintenance Division Repair and maintenance work to the Transport Air Compressor Room at NCTPS II
Supply of Spares for HEA Igniter
Engaging man power at Gandhi Nagar Sub Division.
Supply of Quad Power supply units for Variable Frequency Drives of ID fan for Unit I and II
NCTPS II MI Circle CA CWPH Unit II Inspection of internals attending defects by dismantling the CWP 2C internal
Improvement works by replacing the existing damaged terrace (pressed) tiles, damaged concrete in the roof slab and redo the same along with allied works such as colour washing and white washing to the control room building of Vikramangalam 33/11KV SS
TTPS ES Circle EM II Annual maintenance of HT LT Breakers Modules Busbars and Isolators during the Overhauling period of 2025 26 at Ash Handling Plant Stage I
TTPS ES Circle EM II Overhauling of LT Motors in Boiler and mill area and valve motors in Boiler area of unit I during Capital overhaul period of 2025 2026
Ractification works to the ceilingconcrete,Weathering course,Plinthbeam providing new galvalume colour sheet including colour,white washing and chainlink fencing with other allied works to the control room building of old narasingampatty 110/11 KV SS
TTPS ES Circle EM II Overhauling of LT Motors such as seal air fan motor AC DC scanner motor and LOP FLOP of FD PA fan motors in unit I during the Capital overhaul period of 2025 26
TTPS ES Circle EM II Core lifting inspection and internal cleaning of all 20 Nos Rectifier Transformers in ESP I during the overhauling period of 2025 26
TTPS ES Circle EM II Cleaning with emery sheet on Rusted area and soap Water Washing the external body of HVR Transformer Duct and Field Disconnecting Switch box with two coats of painting with Enamel smoke Gray Aluminium color paint in ESP I duri
TTPS ES Circle EM II Major overhauling of 2 Nos fan motors 5 Nos Mill motors and Annual preventive maintenance of 4 Nos fan motor 1 No Mill motor during unit I capital overhauling period of 2025 2026
TTPS ES Circle EM II Annual Maintenance of LT SWGR Buses Breakers electronic controller panels auxiliary control panels and overhauling of LT motors in ESP I overhauling of the year 2025 2026
TTPS ES Circle MRT I Capital Overhauling works in Boiler side Valves Dampers DCS panels and ID FD PA fans lub oil panels in Unit I for the year 2025 26
NCTPS I SE MI Circle R M 25 26 TM Dn Complete cleaning and removing the oil dirt in the Voith Casings and Oil lines upto the pumps Painting the Voith Hydraulic Coupling and connected Oil lines completely and painting of epoxy zinc
TTPS ES Circle MRT I Capital Overhauling works in FSSS system in Unit I for the year 2025 26
TTPS ES Circle MRT I Capital overhauling works of digital Excitation System GRP 6 6kV System and LT system in Unit I for the Year 2025 26
TTPS ES Circle MRT I Unit I Capital Overhauling of turbine side valve actuator electrical portion limit switch torque switch assemblies in for the year 2025 26
TTPS ES Circle MRT I Capital Overhauling of CWP panels system 6 6kV HT LT switchgear system Generator Transformer System External Auxiliary LT Switchgear System in Unit I for the year 2025 2026
TTPS ES Circle Instn I Releasing Re fixing of Critical instruments of boiler Turbine and Mill area and also Cleaning of Secondary Air Aero foils Unit I during the period of Capital overhaul for the year of 2025 26