Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
537 results • Latest
Construction of 03 No. State Tubewells of 1.0 Cusec capacity in District Firozabad
Construction of 03 No. State Tubewells of 1.5 Cusec capacity in District Firozabad
Construction of 04 STW capacity of 1.0 Cusec in District Agra
Construction of 04 No. State Tubewells of 1.5 Cusec capacity in District Agra
Construction of 04 No. State Tubewells of 1.0 Cusec capacity in District Agra
Fabrication of Trash Rack Jali at Naipura Pumping station Tahsil Rudauli Disst- Ayodhya
construction of Boundary Wall of Dingerpur Inspection House
Contruction of Boundary Wall At Dhauraha Pump Canal.
Repairing, overhauling and Fabrication ,Erection of roller with roller assembly of gates at Saprar Dam in District Jhansi.
Epoxy painting after sand blasting of up stream side of gates at Pahadi Dam in District Jhansi .
Fabrication and Erection of durashine shed on superstructure of Dam at Saprar Dam in District Jhansi .
Epoxy painting after sand blasting of stoplog gate at Pahadi Dam in District Jhansi .
Fabrication and Erection of wire mesh on superstructure of Barrage at Hindon Barrage in District Ghaziabad.
Fabrication and Erection of wire mesh on superstructure of down stream of Barrage at Kho Barrage in District Bijnaur.
Fabrication and Erection of wire mesh on superstructure of upstream of Barrage at Kho Barrage in District Bijnaur.
Painting of superstructure of Barrage at Maddhya Ganga Barrage in District Bijnaur.
Repairing and overhauling of roller assembly of gates at Allahabad branch regulator at km 258.00 of Sharda sahayak poshak canal in District Raebareli .
Fabrication and Erection of shed on superstructure at Rasin Dam in District Chitrakoot .
Painting after sand blasting of superstructure at Urmil Dam in District Mahoba .
Epoxy painting after sand blasting of gates at Urmil Dam in District Mahoba .
Replacement of roller assembly of gates at Urmil Dam in District Mahoba.
wiring work in all store of Irrigation Workshop Division, Kanpur
Interlocking of Saidpur colony link road sub div. 2nd TWD 2nd Ghazipur
Repaireing of Jiledaari office and Saidpur tubewell colony (AE quarter JE quarter 4th class quarter and quarter boundary wall
First class brick lining work with 40pct. new brick and cement plaster on both side wall and all required work at Nandi pump canal in district Amethi.
Dismantling of overhead shed sheet (Rusted/broken A.C.sheets/G.I. sheets) of Cement store, Laying Corrugated sheet/Plain sheet and making rain water gutter as per site requirement including fixing of self-locking screw with washer, height of shed.
Fabrication and Erection of durashine shed on super structure of Barrage at Gokul Barrage in District Mathura.
Epoxy painting after sand blasting of downstream side of gates at Pahadi Dam in District Jhansi .
Manufacturing of mild steel Storage Bins (330 No.) Store Area at Irrigation Workshop Division , Kanpur
Manufacturing of Cantilever based Designed racks (10 No.) For Raw Material Store Irrigation Workshop Division , Kanpur
Manufacturing FIFO based 06 Nos. Roller Racks for G.M. Store under project of Constructoin of storage system for raw materials and finished products and installation of modern machines at Irrigation Workshop Division , Kanpur
CONSTRUCTION OF INTERLOCKING ROAD OF NALKOOP INSPECTION HOUSE PIPRAICH TOTAL LENGTH 155 MTR (OUT OF THIS 100 MTR HAVE 4 MTR WIDTH AND REMAINING LENGTH HAVE 1.5 MTR WIDTH) AS PER DRAWING, INCLUDING COST OF MATERIAL, LABOUR AND T AND P.
Dismantling, Carriage, Assembling and Erection of 03 no gates of cross regulator at 52.770 Km and 03 no gates of cross regulators at 80.200 Km of Western Gandak Canal in district Kushinagar .
REPAIR OF ROLLERS OF ANUPSHAHAR BRANCH HEAD REGULATOR
Construction Work of Sub Division 2nd office Bareilly of Tubewell construction division Budaun with Electrical wiring and sanitary installation
HT CABLE
Construction of RCC Pedestal P124 to P248 in Main Pipe Line of dia 500 mm at reach from 1.786 to 2.050 Km and 2.150 to 2.450 Km 564 mtr in New Ramjanaki Pump Canal Dist Banda Block Badokhar khurd Village Ganchha
Fabrication and installation of chequered plate at superstructure of Kho Barrage Sherkot.
Design, manufacturing, installation, testing and commissioning of 1000A LT panel with two incomers 630 KVA, bus bar for 03 no. motor 170 HP etc. as required with all cost of material, labour tool and plant as per BOQ at Kuchalai pump canal, Sitapur
First class brick lining work with 40pct new brick from with E/w,subgrade preparation (dressing), sand filling and CC work on canal bed including all cost of material at maholi pump canal in district Sitapur.
Boulder pitching work for river bank protection work and making of stair slope and all required work including all cost of material, labour, tool and plant as per drawing and BOQ of the project at Naugawa pump canal in district Ayodhya.
Boulder pitching work for river bank protection work and making of stair slope and all required work including all cost of material, labour, tool and plant etc. at Kasimpur North pump canal in district Barabanki.
Boulder pitching work for river bank protection work and all required work including all cost of material, labour, tool and plant etc. All work should be done as per drawing and BOQ of the project at Akbarpur pump canal in district Raebareli.
Boulder pitching work for river bank protection work and all required work including all cost of material, labour, tool and plant etc. All work should be done as per drawing and BOQ of the project at Dareeba pump canal in district Raebareli.
Boulder pitching work for river bank protection work and making of stair slope and all required work including all cost of material, labour, tool and plant etc. at Nandi pump canal in district Amethi.
Tendernotice02/EE/2026-27
Drilling of State Tube Well in District Agra Block Jaitpur
Vertical brick lining of Dharwara pump canal from 0.750 km to 1.100 km including cost of all materials labour T and P etc. as per drawing and direction of Engineer in charge for proper completion of work with maintaining proper water level.
Vertical brick lining of Dharwara pump canal from 0.550 km to 0.750 km including cost of all materials labour T and P etc. as per drawing and direction of Engineer in charge for proper completion of work with maintaining proper water level.
Vertical brick lining of Dharwara pump canal from 0.200 km to 0.550 km including cost of all materials labour T and P etc. as per drawing and direction of Engineer in charge for proper completion of work with maintaining proper water level.