Loading…
Loading…
5,535 results • Latest
JOB WORK OF REPAIRS OF THE HT PANEL WITH ASSOCIATED POWER AND CONTROL CABLES RAPAIRS OF ACLT PANEL REPAIRS OF SOFT STARTERS, REPAIRS OF DCDB AND REPAIR WORK OF RELATED ELECTRICAL COMPO NENTS AT BARSHI LIFT IRRIGATION SCHEME STAGE1
REPAIR WORK OF ELECTRICAL COMPONENTS AT SHIRAPUR LIFT IRRIGA TION SCHEME
Repair Work Of Mechanical And Electrical Components At Barshi Lift Irrigation Scheme Stage1 And 2
To carry out the Job work required for Operation and petty maintenance supervision by means of pump operator electrician helper etc complete job for Barshi LIS Stage 1 and 2 annual rotation
To carry out the Job work required for Operation and petty maintenance supervision by means of pump operator electrician helper etc complete job for Shirapur LIS Stage 1 total pumps 4 nos and Stage 2 total Pumps 4 nos
Carrying Out Overhauling Of Two Numbers Of Pumps Cleaning Of The Pump House And Repair Works Of The Electrical System Which Are Damaged Due To The Flood Occurred In September 2025 At StageI Of Shirapur Lift Irrigation Scheme
Opening and closing of stop dam Gate Shutter under Water Resources Sub Division Rajgarh
Construction of SHG Training Center in Gaybhatan Naajeevika Mahila Gram Sanghatan Vill Gaibathan G.P. Gaibathan Block Maheshpur
Opening and closing of stop dam Gate Shutter under Water Resources Sub Division Zeerapur
Providing Labour cum watchman of PBC Division Sohagpur.