Loading…
Loading…
5,563 results • Latest
Repair of canal of Bijoura Tank
Repair of Main canal RD 100 to 300 m of Borina Tank
Repalrs And Maintenance To Canal Cross Regulator adlal Gates Of Size 5.5 3.5 Mtr 08 Nos., Rope Drum Hoist 10 MTCapacity For C. R. Gate At KukadILeft Bank Cannal Chainnage KM 60 600 72 110, 83 930 And 97 200 Total 8 Nos.
Special Watch and ward of works from RD 0.000 to 20.000 of GDC and Talwara protection bundh from RD 0.000 to 18.000 in section Ist of RWSRP Sub division 1st hanumangarh during the flood period from 15 june 2026 to 15 oct 2026
Shifting of Various HT Line with DTR and Road Crossing at place Lakhanpur to Bansadehi including Kheri to Bhojpur (Begumganj-Raisen) affected by the submergence of Jera Dam Medium Irrigation Project
Maintenance of office campus and colony of Water Resources Division Katni
Repair of VRB Dharwara Tank
Construction of Protection wall of Ratankhedi Barrage.
Construction of PCC Road From Main Road to Ayushman Arogay Mandir Kabri Goindi and Bandua Block Garu and saryu Distt Latehar
Water Proofing work of Purandar Lift Irrigation Scheme Pump house no.1 to 4. control Room and other ancillary work, Tal- Haveli, Pune.