Loading…
Loading…
7,891 results • Best match
Facility Management Services - LumpSum Based - Construction of Office Building of EE EDD Raebareli; civil works; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Construction of Office Building of EE EDD Raebareli; civil works; Consumables to be provided by service provider (inclusive in contract cost)
Construction of Control Room Building and Other Civil Works for New 33/11 K.V. Sub-Station Dadri Town Distt- Gautambuddha Nagar
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. DSR. 2.8.1 (Civil)
Construction of Control Room Building and other Civil Works for New 33/11 K.V. Sub-Station Sewa Dham, Loni Distt. Ghaziabad
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All work up to plinth .Concrete of M30 grade with minimum cement content of 350 kg /cumDSR. 5.33.1.2 (Civil)
Construction of Control Room Building and other Civil Works for New 33/11 K.V. Sub-Station Lajpat Nagar-2, Distt. Ghaziabad
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All work up to plinth .Concrete of M30 grade with minimum cement content of 350 kg /cumDSR. 5.33.1.2 (Civil)
Construction of Control Room Building and other Civil Works for New 33/11 K.V. Sub-Station Rajendra Nagar-3, Distt. Ghaziabad
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All work up to plinth .Concrete of M30 grade with minimum cement content of 350 kg /cumDSR. 5.33.1.2 (Civil)
Construction of Control Room Building and Other Civil Works for 33/11 K.V. S/S New Babugarh (Babugarh II) Distt- Hapur.
Pre-Construction anti-termite treatment, by creating a barrier under and around the columns pits, foundation trenches, under floors, junctions of Walls & floors, around the external perimetre of building, expansion joints, surrounding of pipes and conduits etc. (Plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981))with Eldrine emulsifiable 0.2% concentration or any other approved material such as Heptachlore or chlordance will be used. The consumption of emulsion shall be (i) Foundation and masonary @ 5 Ltrs/Sqm, (ii) Back fills in immediate contact of foundation@ 7.5 Ltrs. / Sqm, (iii) Top surface of Plinth filling @ 5 Ltrs / Sqm, ( iv) Junction of walls & floors @ 7.5 Ltrs / Sqm, (v) Soil along external perimetre of building @ 7.5 Ltrs / Sqm (vi) under apron of the building @ 5 Ltrs. /Sqm. The rates includes cost of all materials, labour, equipments, T&P complete. CSI No. 17.01 (SOR 23-24)