Loading…
Loading…
93,666 results • Best match
MLA-SDF-Renovation and Repair of Balikadavu -Construction of Balikkadavu and allied works for Karipoor Devi Temple in Nedumangad Muncipality-General Civil Work
OD34653/2025-2026:Putting up ring bund and bailing out water during the course of construction by engaging man coolies and removing the bund after the completion of the work as directed by the departmental officers at site.
Tit bid repair and maintenance with outside painting, Roof treatment , sanitary and plumbing works and other allied civil works at Kastogara 33/11 KV Sub-Station Building under Rampurhat Division in the district of Birbhum.
eProcurement System of Government of West Bengal Created By: PARIMAL SARKAR Created Date/Time: 18-Dec-2025 12:14 PM Tender Title: Civil work Tender ID: 2025_WBSED_941257_1
Structural repairs, painting works and other miscellaneous civil works at Mod Labs building, BARC, Trombay, Mumbai.
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works, and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Notes : (1) Each Job shall be carried out by one qualified Technician having minimum SSC with Trade certificate in Masonry/Plumber/Carpenter/Painter Trade of not less than one year duration from ITI/Government Recognised Vocational Training Institute or experienced Technician retired from Government service. (2) Deployment: The contractor shall deploy one Technician for each job as Single Day work for 6 working days per week for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the Technician will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out number of Jobs per day as directed by Engineer-in -Charge. (4) Mode of measurement : Measurement will be per job basis per day. A single job shall be carried out by deploying one Technician exclusively for the particular job. (5) The Technician should be engaged after scrutiny by EIC of CED, BARC and approved by Competent authority and the deployed Technician will report to BARC Engineer/ EIC. (6) The minimum notice period before change of technician is 1 (One) month; failing which a compensation, for not providing technical support, of Rs. 1,249/- per day of shortfall in notice period will be levied on the contractor.
Special Repair for Renovation of 60 bedded hospital SDCH Dabwali (Old Building)Repair of civil work Boundary wall parking shed and PHA work in sirsa Distt
Renovation of 60 bedded hospital SDCH Dabwali (Old Building) Repair of civil work Boundary wall parking shed and PHA work in Sirsa Distt
GENERAL- Mini Civil station, Wadakkanchery-Maintenance work-Repair works on the Common toilets and maintenance works to Mini Civil Station, WadakkancheryGeneral Civil Work
Special repairs works to Common toilet at Minicivilstation Wadakkanchery
GENERALRUNNING CONTRACT CIVIL STATION 2025-URGENT REPAIR AND MAINTENANCE WORKS General Civil Work
24.2:Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.