Loading…
Loading…
2,869 results • Best match
Execution of last-mile optical fibre cable laying through open trenching/HDD methods within the campus, overhead (OH) and open trenching/HDD methods outside the campus, including associated works and the supply of allied materials, from CLS Carnic to Carnic (AR1) for providing last-mile connectivity to the Indian Air Force (IAF) at Car Nicobar Air Force Station on behalf of RailTel Corporation of India Limited, Eastern Region
Interlinking of 33kV US Consulate feeder emanating from 220kV Gachibowli SS to 33kV Gopanpally SS by laying 33kV 400 sqmm UG cable for a length of 1.25 km s Run in Nallagandla Operation section of Gachibowli Sub-division and Division in Cyber city Circle and work executed by Master plan Sub-division-I of WCGH division in Master plan Rangareddy Circle under T nd D Improvement to original works
Bifurcation of 33KV Mogiligidda Feeder emanating from 132/33kV Srirangapur SS by erection of 4.06KM Double Circuit overhead line by making Double circuit with existing 33kV Mogiligidda, 33kV Chowderguda and 33kV Vijayaneha feeders emanating from ... and laying of ... UG Cable for ...
REPLACEMENT OF OLD CABLE AND LAY NEW CABLE BETWEEN SS7 AND C5 BUILDING (RD2505)
Supply and laying of common clay modular bricks sub class B in cable trench to be laid width wise after cable laying etc., all as per SSR and as directed by EIC.(9 bricks per meter length)
Supply, Laying and Jointing of HT and LT Cables
Supply Laying of 16sqmm Flat type copper cables and Supply of 10HP 6nos of Submersible pump set at Vallanaadu Head Works
Cable laying work including all cost and conveyance of labour charges etc., complete
RESTORATION OF TRENCH DISTURBED DUE TO LAYING OF CESC UHT CABLES AT BROJOMONI DEBYA ROAD IN WARD NO- 126.
Electrical work for extension of existing FOB (3.05 m wide) towards east side at Orga and GBX road stations in HTE-Orga section
Underground cable laying in Hard and rocky soil as Metre per specification.
Energization of Lighting Distribution Boards, including laying and termination of cables, shifting, installation, testing and commissioning of Electrical panels for WMP, FRFCF, Kalpakkam
Dismantling of old control cables and proper laying of newly installed control cables after implementation of SCADA system at 220/132/33KV Grid Sub-Station, Katapali under EHT (0&M) Division, Burla