Loading…
Loading…
17,048 results • Best match
Supply and Erection of Highmast Light in 1. Shanshinagar Dod masijid, 2. Wad no. 32 Rahmathnagar tarza dilwala darga, 3. ward no 31 Rahmathnagar masijid Axa compound, 4. ward no. 30 Illal Masijid noor nagar, 5. Gandhinagar, 6. mochicolony,7. Petechmanahalli, 8 Viranjaneya Nagar 2nd Stage and 9.Beedi Colony of Kolar Town
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using
IMPROVEMENT OF STREET LIGHTING SYSTEM AT S.P. MUKHERJEE ROAD, BASANTA BOSE ROAD, RANI SANKARI LANE AND DIFFERENT OTHER PLACES IN WARD NO-73.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
Construction of Additional Work at ENT Hospital in PBM Hospital Bikaner (Electrical work)
Add extra in item no. 11.2 for Laying Charges for cable through Manual Boggi by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.
REPAIR/REPLACEMENTOF LT O/H LINE SERVICE, CONNECTION AND CONNECTED ITEM AT BB CANTT, SRINAGAR.
... exc 1.5 m in depth; for laying of cables, pipes etc. and getting ...
Shifting of HT LT line from sarwari gate to BHILWARA NH Ajmer
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable. (d) Lay the protective Common burnt ...
COMPREHENSIVE REPAIR/ REPLACEMENT AND DAY TO DAY MAINTENANCE OF HIGH MAST SECURITY LIGHTS/ STREET LIGHTS, JUNCTION BOXES, UG CABLE INCLUDING CONNECTED E/M ITEMS AT MAP POCKETS M,K,H,G,N AND KK VIHAR ACCN UNDER GE (EAST) JALANDHAR CANTT
... of sand 8 cm thick before laying of cable and 15 cm thick after laying of cable and trenches punned down ...
IMPROVEMENT TO SITE OFFICE AT CWE (AF) GURGAON UNDER GE (AF) FARIDABAD
... layer of 8 cm thick before laying the cable and 15 cm thick layer after laying the cable and this then gently punned ...
Part-I:- Design, supply, erection, testing, commissioning, infringement removal of 25KV AC, Single Phase OHE in connection with 25 KV AC OHE modification work in Manmad Yard, in connection with doubling work between Daund- Manmad (A- Route), Part-II:-Design, supply, erection, testing, commissioning & infringement removal work in connection with Manmad SSP shifting work in connection with doubling work between Daund- Manmad (A-Route), Part-III :- Design, supply, erection testing and commissioning of 25 KV, Single Phase, AC OHE works, in connection with Provision of 25 KV / 240 V, 25 KVA AT & 50 KVA AT supply for work, in conection with 3rd line between MMR-JL in Bhusawal division of Central Railway, Part-IV:- Design, supply, erection, testing & commissioning of 25 KV AC, single Phase OHE including modification in existing OHE, due to construction of ROB at LC- 98 , LC- 88, LC- 93A & LC- 94 & Removal of LT, HT infringement in connection with construction of the above ROB/RUB work & Electrification of 2nos. SUB WAY, in Bhusawal division of Central Railway, Part-V:- Design, supply, erection, testing & commissioning of 25 KV AC, single Phase OHE including modification in existing OHE in downside of Nandgaon yard in connection with leftover work of Manmad-Jalgaon 3rd Line, Part-VI:- Design, supply, erection, testing & commissioning of 25 KV AC, single Phase OHE including modification in existing OHE due to 9 nos. new FOBs in connection with 3rd line between MMR- JL.Part-VII:-Temporary Lighting & Emergency power supply arrangement during Non-Interlocking works at site as per the requirement of Railway, in connection with 3rd line between MMR-JL.
bore by push method including laying cable
FOR SHIFTING OF 33KV LINE, 1IKV LINE, LT. LINE AND OTHER ASSOCIATED WORKS DUE TO WIDENING OF DHAULANAPILKHUWA- BHOJPUR ROAD IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDDPILKHUWA UNDER EDC HAPUR.
... (820x 2 = 1,640 meters total cable laying). Scope of work includes ...
COMPREHENSIVE MAINTENANCE OF FLOOR, ROOF, CEILING, COLUMN, JOINERY, CHAJJA, FINS, FACIAS, LEAKAGE, SEEPAGE, PLASTER WORK, DOORS, WINDOWS, VENTILATORS, GRILLS, GUARDS BARS, SANITARY AND PLUMBING WORKS, STRUCTURAL REPAIRS, SMART PERIODICAL SERVICES, SE
Laying only cable XLPE insulated screened ...
Part-I:- Design, supply, erection, testing, commissioning, infringement removal of 25KV AC, Single Phase OHE in connection with 25 KV AC OHE modification work in Manmad Yard, in connection with doubling work between Daund- Manmad (A- Route), Part-II:-Design, supply, erection, testing, commissioning & infringement removal work in connection with Manmad SSP shifting work in connection with doubling work between Daund- Manmad (A-Route), Part-III :- Design, supply, erection testing and commissioning of 25 KV, Single Phase, AC OHE works, in connection with Provision of 25 KV / 240 V, 25 KVA AT & 50 KVA AT supply for work, in conection with 3rd line between MMR-JL in Bhusawal division of Central Railway, Part-IV:- Design, supply, erection, testing & commissioning of 25 KV AC, single Phase OHE including modification in existing OHE, due to construction of ROB at LC- 98 , LC- 88, LC- 93A & LC- 94 & Removal of LT, HT infringement in connection with construction of the above ROB/RUB work & Electrification of 2nos. SUB WAY, in Bhusawal division of Central Railway, Part-V:- Design, supply, erection, testing & commissioning of 25 KV AC, single Phase OHE including modification in existing OHE in downside of Nandgaon yard in connection with leftover work of Manmad-Jalgaon 3rd Line, Part-VI:- Design, supply, erection, testing & commissioning of 25 KV AC, single Phase OHE including modification in existing OHE due to 9 nos. new FOBs in connection with 3rd line between MMR- JL.Part-VII:-Temporary Lighting & Emergency power supply arrangement during Non-Interlocking works at site as per the requirement of Railway, in connection with 3rd line between MMR-JL.
bore by push method including laying cable
REPAIR/ MAINT OF INTERNAL ELECTRIFICATION FITTINGS, FIXTURES, MAIN DISTRIBUTION BOARDS, BLDG EARTHING, INTERNAL ELECTRIC SUPPLY SERVICES AND OTHER E/M WORKS IN OMQS, OTM ACCN (DOMESTIC) AND LCA QTRS AT AF STN SULUR
Supply and laying UG cable XLPE insulated, screened, ...
REPAIR AND MAINT OF MOTORIZED VALVE CONTROL PANELS OF PUMPS CONTROL VALVE SEWAGE PUMPS CONTROL VALVES SEWAGE PUMPS CONTROL PANELS AND ITS ALLIED ITEMS ACCESSORIES IN BAIRAGARH UNDER GE BHOPAL
... layer of 8cm deep before laying of cable and 15cm above the top edge of the cable of after laying of the cable complete all as specified ...
PROVN OF 02 X TOILET BLOCKS CONSISTING 8 TOILETS FOR GIRLS AND BOYS EACH AT CHILDREN SCHOOL (SR WING) KANPUR CANTT AND PROVISION OF 01 X TOILET ADJACENT TO BLDG NO P-4 IN CQA (GS) KANPUR AT CQA (GS) UNDER GE (I) KANPUR
... 23cm thick (8 cm before laying the cable and 15 cm thick after laying the cable) in trenches including watering ...
Modification and Improvement in Electrification work in main mandi yard at KUMS Dausa
... item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine... repairing the pit after laying of cable with PCC/ Bitumin as required.
SPECIAL REPAIR FOR CONVERSION OF LT OVERHEAD LINE TO UNDERGROUND CABLE AND CONNECTED SERVICES AT DOGRA LINE POCKET 7 UNDER GE ROORKEE
Supply, laying and testing cable XLPE Insulated ,screened, ...
Shifting/Modification work of 66kV underground cables of TPDDL, DMRC, NDMC etc. infringing between Ch 00000 to Ch 36200 of Delhi-Panipat Karnal Namo Bharat Corridor.
... Boxes (with/without SVLs), laying & connecting Bonding Cable, providing & crimping of ...
Construction and Maintenance of Block level stadium under GARADAPUR block (with Indoor Hall) in the district of Kendrapara_building
Laying of MV cable upto 25sqmm in ground (5.1.1)
Construction of Block Level Stadium under Morada Block (With Indoor Hall) in the district of Mayurbhanj_building
Laying of MV cable upto 25Squre Metersm in ground (5.1.1)
Improvement to Water Supply arrangement in staff quarters at Ahmedgarh, Dhuri, Kila Raipur, Sangrur, Lahra gaga, Jamalpur Shaikhan, Dhablan, Daun Kalan, chhintan wala railway colonies and Improvement to water supply by providing 9 tube well,3UG Tank (225KLD),1 OH Tank(125KLD) & 2RCC staging and improvement in damaged water pipeline in Railway Colonies of Saharanpur- Ambala-Chandigarh-Morinda section.
... and then refilling after laying of cable as per IS 1255:1983 and ...
Upgradation and Provision of Power Supply System at Stations, Colonies, Substation and Other Locations in Kota Division.
Digging of trench in pucca trench in yard /platform 50cm. deep and 35cm. wide including replaster on surface by cement oncrete after laying of cable.
Provision of store of shop No. 24 and raising of floor height of Godown for electrical (G) works under jurisdiction of Dy.CEE/G/KPA.
Laying of cable through the trench, GI pipe,... making good of damages after laying of cable and connection with switchgears ...
SPECIAL REPAIR FOR CONVERSION OF LT OVERHEAD CONDUCTOR INTO UG CABLE AT AF STATION BHUJ
... cutting of road manually for laying of cable/GI tubing light grade ,after laying of cable making disturbed surface ...
SITC of AC Machine at different Ejlash and Judicial Magistrate Officer Chamber at Tufanganj Sub Divisional Court, Tufanganj in the district of Coochbehar.
SUB-HEAD 2 -- Supply & Laying of Cable
Annual Maintenance of the E.I. work at MCH Building of Bankura Sammilani Medical College and Hospital. ------Electrical connection for the shifting of Autoclave machines from M.OT store room to Gynee ward store in view of LaQshya visit 2025-26 and n
Laying of cable upto 3/4 core 25 sqmm on ...
WBPHE/EE/JMD/NIeT 03_13 OF 2026-2027
Installation of items:- Laying of cable on wall/surface incl. S ...
Supply, installation, testing and commissioning of Silent Diesel generator set with allied Electrical installation work at Tarakeswar Rural Hospital, Tarakeswar, Hooghly.
Laying of cable upto 2 core 25 sqmm on wall/surface ...
08/SE(T)/LCZ/2026-27
... boxing with bricks & sand, laying of cable filling of sand up to top... covering with stone slab after laying of cable. (All material shall be ...
Construction of plant and manifold room with connecting bridges for set up of MGPS connection for new 100 bedded building, Habra SGH - EI work.
Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as per GS. [ For 2 core 6 Sq mm. ]
PROVIDING AND INSTALLATION OF ELECTRICAL ACCESSORIES FOR LIFTS AND BARRIER FREE PROVISION FOR DIVYANGJAN AT GOVT. INDUSTRIAL TRAINING INSTITURE FOR WOMEN, SECTOR-11, U.T., CHANDIGARH (E.I. WORK).
... included labour charges of laying the cable and making connections etc. ...
REPAIR / MAINT OF LT EXTERNAL ELECTRIC SUPPLY AND CONNECTED ITEMS, LT PANELS, LT CABLES, DISPLAY BOARD, SIGN BOARDS, INSTRUCTION BOARDS AT AKASH VIHAR AREA AT AF STN GORAKHPUR UNDER GE(AF) GORAKHPUR.
... 23 cm thick( 8 Cm before laying the cable and 15 Cm thick after laying the cable) in trenches complete all ...
Urgent Electrical installation work for shifting of Compound lights, substation wiring at Lunatic Vagrants (New Building for Female Wing) at Mahalandi, Murshidabad.
Laying of cable 3 Core 10 sqmm XLPE/PVC ...
Installation of Air Conditioning system at Neonatal Ward at Gangarampur SDH, Dakshin Dinajpur. RN23001763, Project ID- HF252647466S000
Laying of cable upto 4 core 25 sqmm on wall/surface ...
REWIRING REPLACEMENT OF INTERNAL ELECTRIFICATION FITTING FIXTURE ACCESSORIES AND ALLIED WORKS OF MD ACCN UNDER AoR OF GE SAMBA
... UG cable and supply and laying XLPE Cable 1100 volts grade PVC insulated ...
Day to Day Operation and Maintenance of Water Treatment Plant at Mangalpur and Raw Water Intake Pump House at Ballavpur including repairing of related pipelines at Raniganj for One Year2026-2027
... pump house room including laying of cable on cable tray and binding ...
BZA Division: Provision for Air conditioning to TTEs rest houses for GTL, SC & Southern Railway TTEs at Vijayawada Railway station.
cement concrete after laying the cable.
Diesel Generating Set, Capacity: 1010 KVA, Engine power: 850 KW, Engine Capacity: 31800 CC with control panel etc. on turnkey basis under the jurisdiction of Dy.CEE/G/KPA
Laying of cable through the trench, GI pipe,... making good of damages after laying of cable and connection with switchgears ...
REPAIR AND MAINT OF CHANGEOVER SWITCH, EARTHING AND LIGHTENING CONDUCTOR OF OTM AND MD ACCN AT SHARIFABAD MIL STN UNDER AGE (I) CIF (K)
... cm before & 15 cm after laying of cable) complete all as specified. ...
Supply ,Installation ,Testing and commissioning of passenger Lift allied electrical installation works at Islampur Sub Division Court(G plus 2) Building in the district of Uttar Dinajpur-Ellectrical installation works .
Laying of cable above 3½ core 50 sqmm and ...
REPAIR/ REPLACEMENT OF LT POLE, LT CABLE, POLE PAINTING AND ALLIED ITEMS, INCL TREE PRUNIG, SUB STATION MAINT AT BHAGAT LINE UNDER AGE E/M (ES) OF GE (U) MEERUT CANTT.
... surface to required levels for laying/taking out cables & pole complete all as specified ...
SPECIAL REPAIR / REPLACEMENT OF BER FANS AND UPKEEP THE E/M INSTALLATIONS AT AHMEDABAD CANTT UNDER GE (A) AHMEDABAD
Taking out old unserviceable cable and Supply, laying & testing XLPE insulated ...
PROVN OF CCTV MONITORING ROOM AND ASSOCIATED WORKS AND ARBORICULTURE WORK IN HQ OPS COMPLEX OF PTS AT AF STN AGRA
... forming bottom surface for laying of pipes/ cable etc. n exc 10 sq m on plan ...
Provision of certain work services for EAC CF and Hanger No. 3 at 19 Wing, AF under GE (AF) Borjhar.
... wells, cesspits, manholes for laying UG cable etc not exc 10 sqm on plan ...
RFP for Doubling of Track between Selenghat (394.30 km) (Excluding) and Bhojo Stations (including) upto km 457.00 ('62.70km') including Electrification & Signalling Works n connection with Furkating- New Tinsukia Doubling Project of Northeast frontier Railway in the state of Assam on EPC Mode.
cables, laying of DWC/ RCC pipes
REPAIR MAINT INCL REPLACEMENT OF STREET LIGHTS, PERIMETER SECURITY LIGHTS LT SWITCH GEARS OH LT CONDUCTORS LT PANELS UG CABLE ELECTRIC GEYSER CEILING FAN EXHAUST FAN WALL MOUNTED FANS SUB MAIN WIRING POINT WIRING SWITCH SOCKET LIGHT FITTING AT
M & L for Sand cushioning trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.
Composite work for Capacity Augmentation of ELS/BKSC to increase the homing capacity- Up to 300 locos (Ph-I) at ELS/BKSC, Creation of Advance maintenance facilities for Electric locomotives at ELS /BKSC & Creation of Trip Shed at ELS/ BKSC- Execution of Earthwork in Formation & Cutting including P. Way Linking Work with Ballasting including Loop Lines & Siding, Construction of Sheds & Service Building, Road & Platform, Circulating Area including other related work, including Mechanical, S&T and Electrical work in Bokaro of S. E. Railway.
... including erection of starter & laying of flat cable.
SPECIAL RAPAIR TO BLDG NO T-61, 08 OR MD ACCN AT MTRC LINE NEW CANTT PRAYAGRAJ
M&L for sand cushioning with Ganga Sand to underground cable (8 cm thick before laying and 15 cm thick after laying the cable complete all as specified and directed.
PROVN OF PARKING SHED IN 26 ARTY BDE AND 76 MED REGT,ADDN/ALTN REPAIR OF BLDG NO T-156 ( STORE ROOM) AT 873 WKSP COY ,PROVN OF TOILET AT UNIT RP GATE NO. 01 AND 02 AT 323 MED REGT AND PROVN OF 02 TOILET CUM AT MIL STN KALUCHAK UNDER GE KALUHAK
... of sand 8cm thick before laying the cable in trenches and 15cm thick after laying the cable in trenches complete all ...
Supply, Installation, Testing & commissioning for provision of Electronic Interlocking (both indoor and outdoor signalling gears) in connection with ROR connectivity at Manmad station and associated residual work in DD-MMR section in connection with DD-MMR doubling work.
... plan and refilling after cable laying. This work includes covering ...
Providing of Internal and External electrification works for ANNEXURE -I Building and Providing of Internal and External electrification works for ANNEXURE - II Building at Paigah Palace, Begumpet, Hyderabad Dist
... bottom of trench before laying the cable and laying of U.G cables from 95 Sqmm up to 400 sqmm ...