Loading…
Loading…
17,048 results • Best match
RPWS to village Budhapanka and its adjoining villages from Jhadiamba WTP under Banarpal Block in Angul District. (including OM 5Years)
... of control pannel board, laying of flat cable & armoured cable through ...
COMPREHENSIVE MAINT OF WATER COOLED AC PLANT AT CERTAIN LOCATIONS AND REPLACEMENT OF FILTER UNSV CONTROL VALVES MS PIPES INSULATION OF CHILLED WATER PIPE DUCTS CONTROL PANEL STARTER REWINDING OF MOTOR AT SITE A2 OF NAVAL BASE KARWAR
Supply, laying and testing cable XLPE Insulated ,screened, ...
REPAIR/REPLACEMENT OF SECURITY LIGHTS/FLOOD LIGHTS, MES INSTALLATION, DG SETS AMF PANEL, EARTHING PITS, LIGHTENING ARRESTORS AND OTHER MISC E/M WORKS AT AF STN BASANT NAGAR UNDER AOR OF GE (AF) FARIDABAD
... layer of 8 cm thick before laying the cable and 15 cm thick layer after laying the cable and this then gently punned ...
SPECIAL REPAIR TO CONVERSION OF OVER HEAD CONDUCTORS TO UNDERGROUND ELECTRIC CABLE ALONG MAIN ROAD FROM SUB STATION 4 TO NASHIK GATE AT CME PUNE
... cm for laying of pipe for laying of UG cables and making good with Plain... Engineer-in-Charge. Note : Laying of cable/pipes shall be measured ...
Signalling work in connection with "Provision of additional two loop lines & provision of Shunting neck and A&D siding" at Boribial station of Solapur Division of Central Railway.
... specifications. This also includes laying & termination of cable, if any from panel Room ...
Construction of Residential School Based on Netarhat awasiye Vidyalaya/Indira Gandhi Balika Awasiye Vidyalaya at Nawadih Block Bokaro District of North Chotanagpur division of Jharkhand
... Excavation, providing sand for laying cable, covering with bricks, refilling ...
REPAIR MAINT OF PUMP MOTOR STARTER DISTRIBUTION SYSTEM LEAKAGE REPAIR ATTENDING DAY TO DAY WATER RELATED COMPLAINTS GATE VALVE PERIODICAL CLEANING OF TANKS AND OTHER MISC EM WORKS AT AFS JALAHALLI
... refilling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is then gently punned ...
Construction of 02Nos 2x5MVA Substation (PakhiDistrict Chamoli and Sara District-Dehradun) along with its associated 33KV Lines
ERECTION & LAYING OF 33KV CABLE 3X50SQMM
PROVN OF 1 X 200 KVA TRANSFORMER AND ALLIED WORKS FOR RELOCATION OF DOU AT KARU UNDER GE 860 EWS
... underground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified ...
SPL REPAIRS TO BLDG NO T-60, T-62, T-67 AT FURNITURE YARD OF BSO AND PROVN AND FIXING OF VERANDA RAILING IN THE GROUND FLOOR OF OFFICER QTRS AT DGQA RESIDENTIAL COMPLEX UNDER AGE B/R I/II AND AGE E/M (S) OF GE (S) SECUNDERABAD
Supply and laying in trenches, LT underground cable, XLPE insulated armoured ...
OFC INSTALLATION AND ASSOCIATED WORKS FOR KRISHNAPATNAM HYDERABAD PIPELINE AND PIYALA JEWAR PIPELINE
cable including Laying of earthing cables/ strips to earth grid/earth pit.
REPAIR/ MAINTENANCE OF HT OVERHEAD NET WORK, HT UNDER GROUND CABLES, VCBS, RMUS, GODS AND CONNECTED WORKS IN NEW CANTT PATIALA UNDER GE (N) PATIALA
... trenches,ducts etc, 8 cm before laying of cable and 15 cm after laying of cable for cushioning to under ...
SPL REPAIR TO BLDG NO B-24 AND B-25 (DINING HALL AND COOK HOUSE) AT AGE B/R-II UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable and after laying the cable complete all as specified ...
Development of Hatiasuni Park and Play Ground Bhubaneswar
Excavation of cable trench for laying of cable.
Electrification work in Library at Govt. Higher Secondary School Ground Taladari, District Rajsamand
G. Solar meter and Cable : Laying of array cables to PCU/ DCDB unit along ...
Electrification work in Library at Govt. Higher Secondary School Ground Olader, District Rajsamand
G. Solar meter and Cable : Laying of array cables to PCU/ DCDB unit along ...
PROVISION OF DG SETS AND ELECTRICAL ACCESSORIES FOR DATA CENTRE FACILITY AT CABS BANGALORE
Supply, laying & testing HT cable 11000 volts earthed of size ...
Provision of Track Circuits using MSDAC due to water logging at SJRR yards of Alipurduar Division.
Laying of underground signalling/ power/telecom cables of various sizes in trench, ...
RE-ELECTRIFICATION OF C TYPE FLAT AT FACT UDL TOWNSHIP 2026
... depth] in ordinary soils for laying cables. The scope of work also... soil after completion of cable laying. The indicated depth and ...
Providing maintenance and repair of octagonal street lights in Karanja Lad city for the year 2026 27 under Municipal Council Karanja Lad Dist Washim (Rates are Excluding GST)
... / stay/earth plate / for laying cable/ pipe & clearing the site ...
Installation of octagonal poles with LED lights along the road leading from the main road to Bad Gujar ki Dhani within the Neemrana municipal area.
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
REPAIRING OF STREET LIGHTING SYSTEM AT ALIPORE ROAD, RAKHAL DAS AUDDY ROAD AND OTHER SURROUNDING AREAS IN WARD NO.82.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
SITC of LED TV and Other work at Lok Bhawan Mount Abu
Supplying and Laying coaxial cable 75 ohm impedance with foam ...
Re-arrangement, repairing and maintenance of existing 33KV Over head feeder no. F-1, F-13 and F-16 of 132/33KV Sub Station Sub Station, Gevra Area for 120 days within duration of monsoon
... sand and good soil after laying of cable / pipe etc. in layers of ...
Drawal of 33 KV 3X400 Sq. mm. XLPE cable one from ID 132KV GSS another from NT AA IIIG 33/11KV Substation along with construction of 01 no Feeder bay at NT AA IIIG Substation upto 33 KV 4 -Panel Shunt Trip RMU with VCB at WIPRO LTD AA-IIIG New T
Micro tunnelling across the road including supply of HDPE Pipe of 200 mm Dia. As per IS : 4984-1995 and laying of cable through HDPE Pipe.
Dismentalling and Reinstallation of WAC and SAC units
... pipe in wall crossings, laying of cable for interconnections and ...
DEVELOPMENT AND RENOVATION OF STREET LIGHTING SYSTEM AT UDAY SHANKAR SARANI TO PGM SHAH ROAD AND ADJACENT AREAS IN WARD NO-94, BR-X.
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
Construction of Infilteration Well in Alwarthoppu in K.Varatharajapuram in srivaikundam Panchayat union under the scheme of SurplusFund 2025-26
Labour charges for laying of cable below Ground level
WORK SERVICES FOR E/M SERVICES AT GUARD POST OF MED REGT AT KHOJATOLI UNDER GE RANCHI
Excavation in trenches in soft/loose soil n.exc 1.5 mtr wide and n.exc 1.5 mtr depth and getting out for taking out / laying of cable complete all as specified and directed.
PROVN OF EXTERNAL INTERNAL ROAD ILLUMINATION AT KISANGARH UNDER GE (A) JAISALMER
... in depth for foundation, laying of cable/pipe etc or for shafts, ...
Shifting of HT 2000GPM Pump Motor set in the safe side of the sump due to gradual decreasing/increase of water level at N D patch main sump along with erection of its 8inch dia M.S. Pipe line at Damoda Colliery.
Shifting & laying of cable from pole to starter & starter to the motor of the pump(35+25)mtr = 60 mtrX4times=240mtr
Replacement of existing Ceiling Lights for better illumination and inter Connection of existing DG Set to Lightening-Circuit for Uninterrupted Power Supply at Meeting Hall and Baranda, Karmashree Building at Circuit House Campus, Bankura.
Laying of cable as below, after cutting ...
PROVN OF SECURITY ENHANCEMENT THROUGH AREA AND PERIPHERAL LIGHTING FOR BLDG NO P - 199, P - 250 AND P - 252 UNDER GE (WEST) MATHURA
... required level or slope for laying of cable, pipe and concrete bed complete ...
Emergent repairing works of Existing Loop Boxes at Lock Gate Fly Over under Hooghly River Bridge Commissioners
Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench for single, 2, 3, 3½ & 4 core.
INSTALLATION OF CABLE TRAY AT THE EASTERN SIDE OF THE HOOGLA PARA UTTARAN IN WARD NO-94,BR-X
Laying on Cable Tray.Laying of cable as below, on existing Cable Tray and binding with suitable size GI wire.(i)Up to 50 sqmm
REPAIR AND IMPROVEMENT WORKS FOR FOUNTAIN AT VRD NAGAR PARK IN DN-25, UNIT-7,ZONE-3
Laying of cable along road / street through 50mm O..., HDPE pipe (trench size 45cm width x 75 cm depth)
LED LIGHT 45 WATT WITH acIRON CLAMP , ANGEL,PIPE,WIRE
[24.2.5.1]LT CABLE 5.1. Laying and fixing of cable on surface/ cable tray etc as required:- 2.5 Sq mm to 10 Sq mm 2 to 4 Core [Through Rate]
IMPROVEMENT OF GRAVEYARD BEHIND NATIONAL COLLEGE & UPGRADTION OF DECORATIVE POLES AT GDA MASABDAR LAYOUT AT WARD 28 IN KALABURAGI CITY
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff(2.5 to 25 Sqmm)
providing and fixing motor pumps, pipe and cable, Other accessors to Newly Drilled Borewells in ward no 15, 21,22 and 24 of Hebbagodi CMC Limits
Laying of cable in Existing Trench/GI pipe/Stone ...
Improvements & Providing Fencing to Keertana Park Garden at ward no 28.
Laying of cable in Existing Trench/GI pipe/Stoneware/RCC Hume pipe using wooden/Aluminium Rollers as directed by department staff. 2.5 to 25Sqmm.
providing and fixing motor pumps, pipe and cable, Other accessors to Newly Drilled Borewells in ward no 07,12,13 and 14 of Hebbagodi CMC Limits
Laying of cable in Existing Trench/GI pipe/Stone ...
providing and fixing motor pumps, pipe and cable, Other accessors to Newly Drilled Borewells in ward no1,2,3,4,5 and 6 of Hebbagodi CMC Limits
Laying of cable in Existing Trench/GI pipe/Stone ...
45/SE(T)AMAUSI ZONE/2026-27
... brick, sand, stone slab after laying of cable filling and proper levelling ...
REPAIRING AND REPLACEMENT OF UTTARAN LIGHTING ARRANGEMENT AT DIFFERENT UTTARAN AREAS IN WARD NO - 46
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
REPAIRING AND REPLACEMENT OF UTTARAN LIGHTING ARRANGEMENT AT DIFFERENT UTTARAN AREAS IN WARD NO - 47
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
REPAIRING OF LIGHTING SYSTEM AT EAST RAJAPUR SANTOSHPUR RASHMONI BAGAN ETC. AREAS IN WARD NO-103, BR-XI
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
Servicing, Repairing, Testing and Commissioning including supply of necessary spare parts of 2no feeders having capacity 11 KV,800 A, 50Hz HT Panel (incommer-01 and transformer feeder no 2) with few allied works at 1000 m3/hr. capacity
Laying only Cable above 50 sqmm but not exceeding 400 sqmm through existing RCC/ Hume/GI Pipe/open masonary trench for single, 2, 3, 3½ and 4 core
Revamping the existing Mettur Nangavalli Water supply Scheme by Providing Horizontal Split Casing Centrifugal Pump cum HSC LT Motor 425KW, 3.3kv, 6 Pole RPM 1482 and Cable in Karumalaikoodal Booster Pumping Station relating to Salem Mettur Nangavalli
Charges for Laying of cable in trenches inside the pumproom
PreMonsoon Maintenance repair work of switchgear HT Relay ACB MCCB LT Starter control panel including allied works at Additional Uttarbhag pumping station under MDMD PS Baruipur Block Canning all in the district of South 24 PGS during the year 20
Laying only Cable above 50 sqmm but not exceeding 400sqmm through existing RCC/ Hume/GI Pipe/open masonary trench for single, 2, 3, 3½ and 4 core
State Plan-2025-26-UWSS to Anakkayam-Supply, erection and commissioning of suitable air blower/compressor at existing 8.5 MLD WTP and related works-General Electrical Work
OD151953/2025-2026:Supply and laying power cable of 4x6Sqmm Copper wire in a reccessed conduit by clamping