Loading…
Loading…
10,691 results • Best match
El.D.C.No.Centre/4707/2025/ Supply and Erection of 35 Nos of 9.5 Mtr GI Lamp posts, 15 Nos of 7 Mtr Height GI Lamp posts with LED Light Fittings and laying of 785 Mtrs of cable at Gengureddy Subway, EB Office Road, in div 99, 107,Zone 8
eProcurement System Government of Tamil Nadu Created By: JULIE HEPZIBAH E Created Date/Time: 10-Dec-2025 03:50 PM Tender Title: El.D.C.No.Centre/4707/2025/ Supply and Erection of 35 Nos of 9.5 Mtr GI Lamp posts, 15 Nos of 7 Mtr Height GI Lamp posts with LED Light Fittings and laying of 785 Mtrs of cable at Gengureddy Subway, EB Office Road, in div 99, 107,Zone 8 Tender ID: 2025_CoC_622680_1
Restoration work of road damaged due to laying of 3X 300 Sqmm XLPE UG 11KV cable line for supply of electricity at Project Rajotto by WBSEDCL from chainage 2.50 Km.to 3.60 Km. at left side flank by HDD method of Eco Park - Kalur More Road under Baras
Restoration of Roads cut by BSES for laying of 66 KV interconnection cable from 66 KV new kondli grid masala market to 66 KV dallupura grid near dashmesh public school by open cut method under Sub- Division East Road-II of Division East Road/(M-212)
Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re- design the mix or bear the cost of extra cement. All works upto plinth level :
laying of 11 KV UG cable 3 Core XLPE 300 Sq mm of total length 1050M including micro tunneling 950 M for drawl of new 11 KV feeder from Devaloke Sonarcity 3311 KV Sub-Station to effect the HT Bulk Connection of Teghoriya Booster Pump Rajpur Sonarpur
Labour charges for Laying, Releasing and Both end termination of 116 mtrs of 3 Core X 185 sqmm Aluminum Armoured LT Power cable from PMCC-II (17F3) to Air Cooled Condenser fan Motor # 8 motor, 125 mtrs of 3 Core X 185 sqmm Aluminum Armoured LT Power
Laying of 3 core *185 Sq.mm, Aluminum Armored LT Power Cable through existing Overhead cable tray in above 15 mtrs height. (17m height) for ACC Fan motor # 8 & Vacuum Pump Motor # 2 ( 20% Extra for above 15 Mtr)
laying of 11 KV UG cable 3 Core XLPE 300 Sq mm of total length 2500M including micro tunneling 2300 M for drawl of new 11 KV feeder with other allied works from Megacity 3311 KV Sub Station iro Botanica Housing Project under Rajpur CCC of Garia