Loading…
Loading…
4,709 results • Best match
Repair of external roads from Switchyard to Power House (RD- 0 m to 2306 m) and Dam security gate to culvert (RD - 2306 to 4656 m) at NBPS, Leh, UT- Ladakh
Making bell mouth opening/ entrance of size 100x50x50 cm for drainage pipe under footpath, including providing cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) for shape of bell mouth, including plastering providing and fixing precast R.C.C./ S.F.R.C. slab including plastering with cement mortar 1:3 (1 cement : 3 fine sand) of 6 mm thickness on exposed surface of the slab & bell mouth including centring, shuttering & neat cement punning inside the bell mouth etc. all complete.
REPAIR TO ROAD AND ROAD FURNITURE AT NAGTALAO UNDER GE BANAR
M&L Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and directed by Engr-in-Charge.
REPAIRS TO FOOTPATH, HARDSTANDING, CHEQURED TILE AND CONNECTED ITEMS AT MARRIED AREAS AT NSB AND INS SHIVAJI, LONAVLA
M&L for precast factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and directed by Engr in Charge.
REPAIR TO CONNECTED PATHS PCC HARDSTANDING ETC OF ZONE C UNDER AGE BR DETT-III OF GE 862 EWS
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature jointed with cement mortor 1:3 (1 cement 3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required, including demolition old existing kerb stone, complete all as specified and directed.
REPAIRS TO JOINERY FLOORING ATT AND STAIRCASE AT ASHOKA PARK PALLAVA PARK WED CTW NSB OLD MOV NAMAC AND CSD DEPOT UNDER AGE BR III OF GE ND VISAKHAPATNAM
Providing and fixing factory made uPVC white colour Sliding window Three track made of extruded profiles with wall thickness of 2.3mm (+ -0.2mm). Window profile with hollow section with multi chamber. Frame (88mm x 52mm), sliding sash (42mm x 67mm). Slidingmesh Sash (42mm x 57mm) Sliding interlock (One vertical length in each shutters) (45.5mm x 28mm),Glazing bead (24.5mm x 16mm) will be miterd cut and fusion welded at all corners, including drilling of holes for fixing hardware and drainage of water etc., making arrangement for fixing of hardware. EPDM gasket, 1.2+ -0.2mm thick galvanised steelFrame (30mm x 18mm) 2 nos, sliding sash (30mm x 18mm), sliding mesh sash (26mm x 10mm) profile tobe inserted in required profile, frame will be fixed to the wall with 8mm x 100mm long fasteners, Hardware [Touch Lock of zinc alloyed (white powder coated), steel roller system. Stainless steel wire cloth 0.36mm nominal dia of wire and average width of aperture1.40mm and all required accessories. complete all as specified and directed. (Note: The unit rate quoted by contractor excludes cost of glass and includes all other connected accessories, making scaffolding, trestles, ladders, cradles, necessary for execution of work and protective measures etc... for a height upto 26 mtr height approximately. (G+5 storey bldg). Net opening will be measured for payment purpose.)
Memo No. 4024 /E-1362058 /EE-E/NKDA/ Elect/ 2026-27-Electrical Work for NKDA Unit office at Action Area-IIIE, New Town, Kolkata under NKDA
supply and laying 25 mm PVC Pipe (heavy tupe) for water drainage with 6 mm thick nitrial rubber insulation with propper spport & brackt as per direction Make: Suprime / Oriplast)