Loading…
Loading…
10,737 results • Best match
Provision of communication facility to sub divisional hospital, RPF barrack, ADEN office and other Engineering Depots along with utility shifting/ relocation on Solapur division of Central Railway.
Excavation of cable trench as per cable route cum plan,1.0 mt.deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer of 50mm thickness ...
SPECIAL REPAIR TO BLDG No. NP-08, NP-09, NP-10 AND NP-11 (JCOs MD ACCN) AT JAIDEEP VIHAR AND PROVN OF CONVERSION OF OH POWER CABLE TO UNDERGROUND UNDER GE (W) PATHANKOT
M&L for sand cushioning to under ground cables with a layer of sand 8 cm before laying the cable and 15 cm after laying the cable complete all as specified (Note:-Punned thickness shall be measured and paid)
Connectivity of Chopan end of IR Chunar yard with UP Main line of DFCCIL, including elimination of Level Crossing Gate LC-122A and provision of dual detection at New Dagmagpur yard of DFCCIL under Jurisdiction of CGM/DDU unit.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. as per the site requirement and as per approved cable route plan. This also includes 13 laying of cables in track crossings & road crossings. (Cables will be meggered before and after its laying ...
Bi-Annual Rate contract “transportation of S/S equipment & line materials and Loading – Unloading of S/S equipment & line materials from various destinations to any sub-stations/store locations/site locations under Various Division office of Palanpur Circle
6. Any electrical work or electrical
Construction of 11/0.415 Kv Substation in Sector-20 Pocket-F YEIDA (WC-EandM-02)
Supply & Burying of 600mm X 600MM X 6.00mm G.I. plate verticalley for Earthing with its top at least 3.00 mtr below ground level complete with 20mm Dia. G.I. pipe & Funnel for watering and one earthing lead of one no. 8 to 10 SWG G.I. wire in 15mm dia. GI pipe upto Switch Board (From approan ...
Upgradation of Power line at Ind. Area Boranada Ph-IV and EPIPI
Add Extra in item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.