Loading…
Loading…
6,464 results • Best match
enit no 30 dated 19 06 2026
Installation, testing, commissioning and strengthening of electric substation at lift irrigation station Datriyal by way of lifting/carriage of old 63KVA electric transformer from its installed position at site after removing HT connections and shifting it to divisional stores of MID Jammu. Loading/carriage/shifting of the new 100KVA electric transformer (to be provided by the department) from divisional stores to the LIS Datriyal for installation. Job also includes providing and installation of new open fuse assembly by means of fixing of L-shaped aluminum bars in frames using ceramic insulators for installation of Al. wire fuse on the input side of the electrical supply on open fuse assembly and then connecting the cable to the one end of the open fuse assembly by way of providing and fixing of Al. thimbles using crimping tool and then making connections using nuts and bolts of appropriate size. Fencing around the electric substation of size 10ft x10ft by way of fabrication of angle iron frames with 45 x 45 x 5 mm angle iron and providing, welding and fixing of chain link/wire mesh fence with gap of 2.5 inch between the frames. These fabricated frames should be fitted and grouted in base. The height of frame should be 5ft. Fabrication and fixing of entry gate for inspection of transformer with angle iron frame of 45 x 45 x 5 mm MS angle. The door should be of 2 ft width with 5 ft height. Job includes painting of angle iron frame with red oxide primer and black paint. The side of fencing must be removable for lifting of transformer. Installation of 100KVA new transformer at site and providing/fitting of single core 120 sq. mm aluminum cables between LT sides of transformer to LT fuse sets. Total length of LT aluminum single core cable required will be 16 meters approx. The single core aluminum cable have to be divided into 4 parts of equal lengths. Each cable should be fitted with thimble of same ratting at each end. Connections of cables to the LT bush rods of the transformer and LT fuse sets. Job also includes providing and fixing of new link sets/knife sets at the substation. Complete job. includes cost of material, consumable, handling, loading, unloading, transportation charge, labour charges ,welding charges for both skilled /semi-skilled labour and hiring charges for Crane , tripod stand, tools and tackles required during the execution of the job at site. Note:- The tenderers are requested to visit the site and quote the rate as per site the conditions. Any modifications/ alterations of the job, absolutely necessary if required at the time of execution may be done as per actual site conditions.
Provision of Land based on-grid PV solar system of capacity 200KWp at Wagon workshop/Guntupalli.
Design, fabrication, transportation, supply, erection and commissioning of out door type LT cubical main distribution board "Design, fabrication of 3phase and neutral 433 V, 4 wire, free 08 standing out door/ Indoor type floor mounted LT Panel (main distribution board) with suitable busbar with Double Door, made up of 14SWG CRCA sheet with suitable size MS angles & Panel internal partition/walls should be made of 16 SWG CRCA Sheet. including Supply of 400A, 36kA, 4 pole microprocessor MCCB with adjustable over load protection -2Nos, 250A MCCB-4Nos. 63A MCCB-1No. indication lamps muti function energy meters etc. as per specification.
Demolition of Existing old Car porch and constriction of New Car porch
Car shed work Car Shed Fabrication & Roofing: Providing, fabricating, and installing complete car shed structure including: • 100 mm GI round pipe columns fixed in excavated pits (700 mm depth × 500 mm width) with RCC foundation (1:1½:3 mix). • 75 mm × 37.5 mm, 16-gauge GP rectangular pipe trusses. • 50 mm × 25 mm, 16-gauge GP square tube support members. • 25 mm × 25 mm, 16-gauge square pipe purlins (Apollo, Bushan or equivalent quality tubes). • 0.45 mm powder-coated aluminium trafford roofing sheets with matching ridge sheets (Hindalco, Everlast, or equivalent approved brand). • 150 mm gutter clamp fixing and PVC gutter fixing and downpipes on both sides. Surface preparation, one coat epoxy primer, and two coats enamel paint. Size: Approx. Length 39 meter x width 6 meter x height 2.55 meter roof bottom (2517 sq.ft.).
REPLACEMENT OF PAN TAP CONE CLENDRIA EXHAUST VAPOUR LINE
Specifications: Replacement of Pan No 3 Top cone, All Pan (1,2,3,4,5)Calendria Vapour entry bend and All pan (1,2,3,4,5)Exhaust/vapour line entry a. All Pans (1,2,3,4,5) – Calendria Vapour Entry Bend • Dia : 500 mm • Length : 7 mtr • Thickness : 12 mm b. All Pans (1,2,3,4,5) – Exhaust / Vapour Line Entry (after valve) • Size : Dia 500 mm • Length : 1000 mm • Thickness : 12 mm • Qty : 5 Nos c.Pan No: 3 – Top Cone • Size : Dia 6 mtr • Taper Height : 3 mtr • Thickness : 12 mm Scope of work: 1) Dismantle the existing damaged Pan No 3 Top cone,All Pan (1,2,3,4,5)Calendria Vapour entry bend and All pan (1,2,3,4,5)Exhaust/vapour line entry, weighed and leading to scrap yard through our mill stores. 2) Fabrication and erection of Pan No 3 Top cone,All Pan (1,2,3,4,5)Calendria Vapour entry bend and All pan (1,2,3,4,5)Exhaust/vapour line entry as per the existing manner welding on both sides (2 layer). 3) The approximate quantity of work will be around 8.00 MT. 4) Two coat of red oxide paint is to be done. 5) Hydro test is to be carried out to check the leakages.
REPLACEMENT OF CLARIFIER II AND III COMPARTMENT WORK
Specifications: Replacement of Clarifier II and III compartment - shell plate, bottom plate, and mud boot tray Size: A.Ⅱand Ⅲ- Compartment Tray plate(Shell) Dia : 10mtr, Heigth : 1.50mtr Thickness : 10 mm B.Ⅱand Ⅲ- Compartment Bottom plate Dia : 7.5mtr, D2 : 2mtr Slope Length : 4mtr,Thickness : 10 mm C.Ⅰand Ⅲ- Compartment Mud boot tray Dia : 2.5mtr, Heigth : 1mtr Thickness : 10 mm Radius : 1.25mtr, Height : 0.5mtr Thickness : 10mm Cast iron valves (flange type) Size 2” – 6 Nos, Size 4” – 4 Nos Size 6” – 2 Nos,MS Pipe Size 4” – 96 Mtrs, Size 6” – 24 Mtrs Scope of work: 1) Dismantle the existing damaged Clarifier II and III compartment - shell plate, bottom plate, and mud boot tray, weighed and leading to scrap yard through our mill stores. 2) Fabrication and erection of Clarifier II and III compartment - shell plate, bottom plate, and mud boot tray as per the existing manner welding on both sides (2 layer). 3) The approximate quantity of work will be around 10.00 MT. 4) Two coat of red oxide paint is to be done. 5) Hydro test is to be carried out to check the leakages, the leakages if any are to be arrested by the contractor.
Labour contract for KCP Boiler Id Duct From Boiler To Existing Suction Line Of Id Fan Damaged Portion Renewal works
Labour contract for KCP Boiler Id Duct From Boiler To Existing Suction Line Of Id Fan Damaged Portion Renewal works 1. Newly Modified and Fabrication of ID Duct from KCP Boiler 1 & 2 Air pre heater outlet to existing ID fan suction line in steam of under ground flue gas path. 2. Dismantling and removing of damaged WIL Boiler ID duct from Boiler outlet to ID fan outlet upto chimney as identified by the Boiler Engineer Approximately 10.00 MT including 2 Boilers. 3. Damaged old Duct Plates are to be handed over to scrap yard through store after weighment as per the Engineers instructions. 4. Size of the duct as given drawing for modification by of duct from boiler Air preheater outlet to existing ID fan suction line. 5. Facbrication and Erection of ID duct damaged portion by new M.S plate 6mm Thickness as per our drawing for modified and existing outlet of ID fan duct from ID fan chimney. 6. All Welding portion should be proper welded and necessary stiffener angle given by the contractor. 7. After renewal of ID duct air leak checked with presents of boiler engineer and leak proved.( Rate per Ton )