Loading…
Loading…
47,715 results • Best match
as per NIT
Fabrication galvanising and supply of ...
Patch works of casings of various equipments and miscellaneous piping works in Ammonium phosphate Plants of FACT-UC.
Fabrication of pipe lines consisting ...
Udumbanoor Gramapanchayath Project Number-SO219/26-Panchayath Shopping Complex DWS , Providing Motor pump set-General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
GENERAL PBP 2022-23 PRO NO 33/22-23 COMPLETION OF THANDARKKUNNUMMAL DWSS- Supply of installation of Pump set and Electrification
90.14.1.1:Fabrication, supply, conveyance, installation... complying to IS 8623.<br> Fabrication of fully partitioned, dust ...
Electrical Works at Proposed blood composition seperation unit at the existing Peadiatric Ward Adjacent to the existing blood centre at Ranaghat SDH Nadia--SITC of AC Machine
... concealed split AC incl. ,fabrication & fixing of 2 nos M.S. Angle/M.S.U.... Conditioning Units.Supplying,fabrication & fixing 4 Nos. M.S. u-channel ...
Construction of Segregation and storage shed at nearby Dam Road in Thirikudapuram Village and Panchayat in Kadayanallur Panchayat Union, Tenkasi District under SBM(G) and 16th CFC - 2026-27
Provision for Roofing and side wallin galvalume sheet 0.47 mm thick including fabrication and all labour charges for erecting etc complete
Renovation work of old Entrance Arch West side at Pudukkottai Bus Stand in Pudukkottai city Municipal corporation
... (5.56mm thick) including fabrication, welding, cutting, polishing ...
Nagercoil Corporation Construction of New Busshelter at Idalakudy near Naidu Hospital and Drain wall raising at Pattariar Long street in ward no.39
Supplying, fabricating, erecting structural steel work for roofing welded ...
S/I/T/C of wiremesh frame for existing feeder piller at various parks as per inventory attached under Eld-12.
Supplying, Fabrication and Installation of wire ...
ANNUAL REPAIR WORKS INCLUDING WORKS AGAINST PG AND MISCELLANEOUS WORKS SUCH AS UNDERGROUND AND OTHER SURVEY WORKS ETC IN DISTRICT SEONI
2.00 GONDWANA FABRICATION AND CIVIL CONTRUCTION (GSTN-23AHZPA4256E1ZE) BID ID -1388573 1952000.00 -15.00 1659200.00 Sixteen Lakh Fifty Nine Thousand Two Hundred
TTPS Operation circle Revenue MPM I Unit I Rewinding and Overhauling of seal air fan motors with a capacity of 55 KW
Charges for fabrication of motors end cover bearing sleeve and fixing
40/15 EOT Crane
... After Inspection Details Fabrication work and before final painting ...
Reorganisation of 300 mtr 8 inch dia Delivery pipeline from coal sump to main sump during upcoming monsoon at Bokaro colliery
Fabrication and making of 8 " inch dia 120 degree M S bend including table D type M S flange
M and R to WSS at Hinjawadi Providing erecting and commissioning of digital flow monitoring system at Resiviors of Water Supply Scheme
... material ,machinery for Fabrication, required excavation, transportation ...
Supply, Installation and Commissioning of 250 kWp Grid Connected Rooftop Solar Power Plant at Central Products Dairy at Alappuzha District
... plant, including additional fabrication works for the required support ...
Prabhag kr.17 madhil sr.no. 164 malwadi parisarat draiange line takane va concretikaran karane.
2.00 SHREE ABHI CONSTRUCTION AND FABRICATION (GSTN-27AVOPT9247P1Z9) BID ID -7385908 843709.000 -40.100 505381.690 Five Lakh Five Thousand Three Hundred and Eighty One
Replacement of 11kV HT VCB panel at HF substation
Design, fabrication and supply of 11kV HT VCB panel with 3 VCBs (1 no. incomer and 2 no. outgoings) for HF substation.
Repairing of Crowd Cushion Assembly of BE-195 Shovel ( Sl No.04) at Nigahi Project.
Cost/charges for fabrication of 01 No. long stud with mat T-1 steel round 80mm dia x 2.5Mtrs. long including material cost, machining charges etc.
Design, Supply, Installation, Testing and Commissioning of LT Distribution Panel by way of Upgradation of existing worn-out LT panel no. 01 and 02 along with allied works in Physiotherapy Section of GMCH, Jammu.
... channel including panel fabrication, Assembling and installation... terminals, DIN rail, ferrules, fabrication and panel assembling and ...
Supplying erection testing and commissioning of submersible pumping sets Supplying erection testing of fully automatic electric control panel board in village Sohna Dhani Gundwas Harijan Basti Raiseena Shamshan Ghat Berka and Mad wala Tubewe
2.00 Shri Hari Fabrication (GSTN-NA) BID ID -1516832 280827.00 25.00 351033.75 Three Lakh Fifty One Thousand Thirty Three
Providing, installation, testing and commissioning of cast steel valves, sluice valves, alongwith allied works at pumping station Khoon.
... standard alongwith providing, fabrication and fitting of flanges-2nos.... standard alongwith providing, fabrication and fitting of flanges-2nos. ...
Repair and Maintenance of the Existing Exhaust and Fresh Air Ducting System in the Aravana Plant at Sabarimala in Connection with M M Festival 1202 ME Reg
OD131019/2026-2027:Supply, Fabrication and Installation of new ...
BTPS-CHP-Regular and preventive periodical maintenance for Belt Feeder-1,2,3 and 4 and flap gates as and when required in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
Fabrication and Erection of new Scrapper on External and Internal side of Discharge Chutes.
Providing Vertical Garden to Benz Circle new flyover pillars from P28 to P35 in Circle-III area Rc.E3.PD3(Parks)-107310/2026.( 15th FCG ADP Improvement of Ambient Air Quality 2024-25)
Providing G.I frame fabrication (for verticle garden with... materials including welding for fabrication, labour charges for fixing ...
Repairs to Antharavalli tank canal gate and reconstruction of CTC to 5th minor of 24th distry of HCC
Design, fabrication, supply, erection, testing ...
Repairs to Sluice of Pedda Cheruvu, Tekmal(V and M), Medak District
Supply, Fabrication and erection of CI plug including cost of all materials as directed by the Engineer in charge.
Providing and fixing of differential protection relay for 160 MVA T/F-II at 220 KV S/S Shamshabad Road under ETD-I Agra
... relay including required fabrication works also in concerned ...
NCTPS II MI Circle - BM Unit-II - Renewal of damaged top suction hood area of PA Fan 2A 2B during the year 2026-27
Charges for fabrication and erection of MS structural and patch up work at top suction hood area of PA Fan 2A & 2B
Shifting and Installation of 02 Nos. 1000 GPM Pump Motor Set with Accessories and Dismantling, Shifting, Laying and Jointing of 6Inch Dia MS Pipe for Dewatering at RIV Bottom Bhaluka Coal Face under Sonepur Bazari Project .
Repairing fabrication of Base frame with hole making as per requirement, repairing of coupling Set as per requirement & making bypass arrangement of 1000 GPM um-motor set
Providing, Laying, jointing and testing of MSERW Pipe 200 mm dia RD250 TO RD490 for re-alignment due to STP at Tanda.
... including manufacturing and fabrication of reducers/ tapers, all... cleaning, welding, jointing, fabrication of bends, tees etc, lowering ...
O and M of GPH Stage 1
Fabrication, machining, drilling, assembly, ...
SITC of 250 mm dia. NRV at Pump set no.8 at Khyala BPS PH-I Re-invite
Fabrication/providing and fixing of dismantling joint having 250mm dia. Or as site requirement to fix before the NRV
Damaged Machine Hole Chamber Replacement Work in Ward 40, 41, 44
... for sidewall, cover slab, fabrication placing reinforcement and ...
Maintenance Contract for Electrical Maintenance jobs of Coal Handling Plant of Unit 5 and 6, under CHP (E/M) dept, STPS. for 02 years.
REPAIRING /FABRICATION OF PADDLE FEEDER PANEL BY PROVIDING COMPONENTS LIKE LOCK,LOCK PIN, HINGE,GASKET,GLASS ,FIBRE SHEET, SS SCREW & NUT-BOLTS ETC AS PER REQUIREMENT
43/SE(T)AMAUSI ZONE/2026-27
... requirement not exceeding 3 meter fabrication 45x45x5 mm angel the frame ...
Renewal of platform in vertical XLR top side and Boiling house I area on Labour Contract Basis
Scope of work:- 1. Dismantling fabrication and erection of the renewal of platform in vertical XLR top side and Boiling house –I area 2. Approximate weight : 10 MTon
Repairing of Bucket Assy of BEML make BE1000 hydraulic shovel Sl. No. 10223 of ABDKG Colliery, Bastacolla Area IX.
L SHAPED FABRICATION CHARGE
Repairing of Bucket Assy of BEML make BE1000 hydraulic shovel Sl. No. 10229 of ABDKG Colliery, Bastacolla Area IX.
L SHAPED FABRICATION CHARGE
Construction of Rope Based Foot Bridge From Bagga to Pangilur in Machhrot Beat, Bassa BLock of Nachan Forest Range under Nachan Forest Division
... commissioning (complete with labour, fabrication, installation etc.) on jyuni ...
SUPPLY, INSTALLATION AND 5-YEAR OPERATION AND MAINTENANCE OF WATER DISPENSER POINTS/ATM IN REWA MUNICIPAL AREA.(2 nd Call)
... on top with material) & fabrication work with lucrative design ...
CONSTRUCTION AND INSTALLATION OF DURO SHINE SHADE ON THE SUPERSTRUCTURE OF HINDON HEAD REGULATOR AT GHAZIABAD
... durashine Sheet etc. Including Fabrication, Welding, Painting and all ...
REPLACEMENT OF M.S.BAGACILO BLOWER CHUTE1 NO. ENTRUSTING OF LABOUR CONTRACT WORK
... (INCLUDING DISMNTALING, FABRICATION AND ERECTION ETC.) M.S.PLATE ...
Work of repairing MS safety gate at Powai Reservoir and other allied works under AEMWWESII
Fabrication and installation of GI profile sheet roof
Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 5-6 AHP
Fabrication of 22.5 degree / 45 degree / 90degree Z-bends and replacement.
Replacing / rotating , strengthening of dry / wet fly ash conveying line of unit 7-8 AHP
Fabrication of 22.5 degree / 45 degree / 90degree Z-bends and replacement.
Rates invited from the bonafide agencies for the under mentioned works (Rates invited for Official use only) (Rates offered should be excluding GST and CESS) under Alipore Division, PHE DTE. (Part-I)
Fabrication of wall pannel with 12 mm ...
As per SBD
Work of fabrication & erection of aluminium anodised pipe partition along with 12mm thick BSL sheet as per specification
Providing and fixing different Dia. Sluice valves in Ward no. 02
... weight Beam HB 200 with fabrication as per site condition. 4.5... 48.50 RM × 40 kg = 1940 kg Fabrication Work Fabrication of 20 mm thick M.S. plate ...
Comprehensive Annual maintenance contract of Window A/c, Split A/c, Packaged units, Deep freezer, Refrigerators, Fan Coil unit and Water coolers installed in Plants of INRPK BARCF Kalpakkam for the period of 12 months
Supply, fabrication, installation of Condensate drain PVC Pipe line With All Accessories
Service Contract for overhauling of Boiler Pressure Parts during overhauling of Unit 6 under BM dept
Removal, fabrication & fitting of guard tube & guard plate for FSH, RH,LTSH, Economizer, Water wall, Water Wall Screen Tube etc.