Loading…
Loading…
955 results • Best match
Work contract for Operation and Maintenance of HVAC system of Main Plant Control Room, VFD room and service buildings etc., at 2x600 MW, SSTPP, MPPGCL,Dongalia.
Operation of HVAC System i.e., Air conditioning of Main Plant Control Room, VFD Room and Service building etc. for 2X600 MW Units at SSTPP, MPPGCL, DONGALIA
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ESTABLISHMENT OF ECRP II PEDIATRIC CARE UNIT AT DH PALAMU; HVAC, Electrical System or Installation, Pipelines, Renovation; bidder, and Installation of Plant ... Plant Systems /Equipments ... HUSSAINABAD; HVAC
and Installation of Plant Systems/Equipments (Version 2) - ESTABLISHMENT OF ECRP II PEDIATRIC CARE UNIT AT DH PALAMU; HVAC
Custom Bid for Services - Hiring of Services for Modification of LQ HVAC Ducting system of ONGC Offshore Drilling Rigs Sagar Jyoti, Sagar Ratna, Sagar Uday & Sagar Gaurav in compliance with MODU-1989 Similar Category Support Services
Custom Bid for Services - Hiring of Services for Modification of LQ HVAC Ducting system of ONGC Offshore Drilling Rigs Sagar Jyoti
Custom Bid for Services - Annual Maintenance of roof mounted CAB HVAC units during minor and major schedule of 3 phase electric locomotives including replacement of spares in Diesel Loco Shed Hubballi for the period of 03 Years Rs 9051203 Similar ... Of HVAC System ... HVAC System (Heating, ... Conditioning System )
Custom Bid for Services - Annual Maintenance of roof mounted CAB HVAC units during minor and major schedule of 3 phase electric locomotives including replacement of spares in Diesel Loco Shed Hubballi for the period of 03 Years Rs 9051203 Similar Category Operation And Maintenance Of HVAC System (Heating
Comprehensive Maintenance, Testing, Validation and Supply Services for HVAC systems, cold rooms, door interlocks, filters and allied works at IVC facility at HLL biotech limited, Chengalpattu
Vendor to conduct the following tests and validate the HVAC system 1.HVAC Testing, Adjusting and Balancing as per ASHRAE standard (Air side & Water side). 2.Checking and Recording all the parameters in TAB format for the equipments like: Air Handling Units. This to includes Electrical measures (Frequency, Power factor & Kw.), Hydronic flow measures, Pressures across heat exchangers (Water & Air), Airflow measures, Motor RPM measures & Thermal measure. 3. Water balancing of chilled/hot water system including: 4.Programming, Documentation, Simulation & Commissioning of BAS 5.Cleanroom Performance Testing, Adjusting, Balancing and Recording, As per DQ confirming 1S0-14644 Part - 3. Clean room validation to be done both at at rest & in operation conditions. a.Air balancing with Flow Hood b.Room Temperature & Humidity Test c.Room Pressure Balancing d.HEPA Filter Integrity Test e.Particle count test f.Room Recovery Test g.Airflow Visualization Test Providing all documentation of IOQ (at rest & in operation) in HBL approved formats *For Cold Room AHU (CAHU) - Temperature Mapping to be performed
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - 03 year Comprehensive AMC and operation of Chiller Plants AHUs and associated HVAC System at MCMV office building 2026 2029
Ventilation And Air Conditioning System) - 03 year Comprehensive AMC and operation of Chiller Plants AHUs and associated HVAC System at MCMV office building 2026 2029