Loading…
Loading…
947 results • Best match
Remaining SITC of HVAC Work and VRV Work in Construction of Hospital (Phase-II) Sikar
Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .
Construction of 50 bedded Hospital into 100 bedded Hospital at Mohindergarh (Pdg. HVAC work only)
Proposed site preparation work for CT Scanner Machine at Basement Main Building - HVAC (Mechanical) Works
4Tr Aircooled ductable Air Conditioner (CT scan server roon near Service building)
Renovation work including civil work, SITC of furniture, HVAC work, AV and VC work etc
trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily
HVAC Works for proposed Endoscopy Operation Theater in OT Complex at 4th floor Homi Bhabha Block
Electrical Fire Fighting and HVAC works for setting up of IGR office at 6th Floor STP II Building