Loading…
Loading…
17,721 results • Best match
Round the clock Operation, maintenance and Guarding of Pumping machineries, Sub-station 250KVA and other Electrical accessories and allied works at GROUND LEVEL RESERVOIR-I, under Siliguri comprehensive W/S scheme, under Northern Mechanical Division,
Daily labour charges with bonus(Once in a year), for operation, upkeepment & guarding of 03 (Three) nos, 45 KW V.T. Pumping machinery (2W+1S) and operation of chlorination system, valves, compound lighting arrangement & all accessories and ancillaries including supply of lubricants & sundry materials by engaging skilled, semi-skilled and un-skilled workers round the clock (three shift of operation) including up-keepment of entire installation along with ssweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation at Pumping Station as per direction of the EIC.Rate are inclusive of Cess @1% ESIC @3.25% & EPF@13% (w.e.f. 01/02/2026 to 31/01/2027)
MTPS 1 Mill Plant Unit IV Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing, worm shaft thrust and radial bearing
Charges for clearing the accumulated coal dust, fly ash and other waste materials and air washing of the feeder discharge chutes and its platforms, structural areas, coal pipes from mill to boiler, Centre feed pipe and its fittings, mill tops, mills, mill floor, below mill floor, gear box areas and ground floor, seal air system, cleaning the oil leakage in gear box area and ground floor etc.,
Round the clock Operation, maintenance and Guarding of Pumping machineries, Sub-station 500KVA and other Electrical accessories and allied works at GROUND LEVEL RESERVOIR-II, under Siliguri comprehensive W/S scheme, under Northern Mechanical Division
Daily labour charges with bonus(Once in a year), for operation, upkeepment & guarding of 03 (Three) nos, 90 KW V.T. Pumping machinery (2W+1S) and operation of Chlorination system, valves, compound lighting arrangement & all accessories and ancillaries including supply of lubricants & sundry materials by engaging skilled, semi-skilled and un-skilled workers round the clock (three shift of operation) including up-keepment of entire installation along with ssweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitationat Pumping Station as per direction of the EIC. Rate are inclusive of Cess @1% ESIC @3.25% & EPF@13% (w.e.f. 01/02/2026 to 31/01/2027)
MTPS 1 Mill Plant Unit II Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing
Charges for clearing the accumulated coal dust, fly ash and other waste materials and air washing of the feeder discharge chutes and its platforms, structural areas, coal pipes from mill to boiler, Centre feed pipe and its fittings, mill tops, mills, mill floor, below mill floor, gear box areas and ground floor, seal air system, cleaning the oil leakage in gear box area and ground floor etc.,
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing
Charges for clearing the accumulated coal dust, fly ash and other waste materials and air washing of the feeder discharge chutes and its platforms, structural areas, coal pipes from mill to boiler, Centre feed pipe and its fittings, mill tops, mills, mill floor, below mill floor, gear box areas and ground floor, seal air system, cleaning the oil leakage in gear box area and ground floor etc.,
Boiler coal pipes overhauling work during AOH
Overhauling of coal pipes in Boiler Area